Loading...
HomeMy WebLinkAboutlanduse case.AP.Alpine Cottage Condos.A009-00 r\ CASE NUMBER PARCEL ill # CASE NAME PROJECT ADDRESS PLANNER CASE TYPE OWNER/APPLICANT REPRESENTATIVE DATE OF FINAL ACTION CITY COUNCIL ACTION PZ ACTION ADMIN ACTION BOA ACTION DATE CLOSED BY - n A009-00 2737.181-65005 Alpine Cottages Condo Plat Amendment Alpine Cottages James Lindt Condo Plat Amendment Alpine Cottages LLC./Tim Semrau Plat Recorded 10/29/01 J, Lindt r\ ~ cU- ~, ~ CITY OF ASPEN PRE-APPLICATION CONFERENCE SUMMARY PLANNER: PROJECT: REPRESENTATIVE: OWNER: TYPE OF APPLICATION: DESCRIPTION: James Lindt, 920.5104 DATE: 1.27.00 Alpine Cottages Tim Semrau Subdivision exemption for Condominiumization Condominiumization of existing platted land and house Land Use Code Section(s) 26.480.090 Condominiumization 26.304 Development Review Procedures Review by: Staff for complete application, referral agencies for technical considerations, Community Development Director for final approval. No. Engineering Planning Flat Fee $265 Engineering $170 $435 Public Hearing: Referral Agencies: Planning Fees: Referral Agency Fees: Total Deposit: To apply, submit the following information: 1. Total deposit for review of the application. 2. Proof of ownership. 3. Applicant's name, address and telephone number in a lettel signed by the applicant, which also states the name, address and telephone number of the representative, Include street address and legal description of the property. 4. Summary letter explaining the request (existing conditions and proposed uses) and addressing the standards of the Land Use Code sections listed above, 5. An 8112" by II" vicinity map locating the parcel within the City of Aspen. 6. Old (existing) plat if one exists. 7. Proposed plat from a registered land surveyor. Call City Engineer for plat requirements. 920.5080 8. Copies of prior approvals (from City Clerk) 9. 2 Copies of the complete application packet (items 2-8) Process: Ne..~t Apply. Planner reviews case for completeness and sends to Engineering and leferral agencies. 2.3 weeks later planner" ~ will contact applicant with the suggestions from Engineering for preparation of the Final Plat. The applicant's survevor makes those changes and brings in 2 renroducihlp. mvI::IT conies to the planner. Planner reviews plat for consistency with Engineering suggestions and the Director approves, approves with conditions, or denies application based on consistency with the review criteria and technical considerations. Plat is then signed by City Engineer. Applicant records the final plat at the County Clerk and Recorder (fee). r, S & S Deveropmen", i..L.C. Phone; (970) 925-6447 .~ . 2088 E. Main, Aspen,Co 81611 Fax; (970) 925-6437 To: Community Development James Landt From; Alpine Cottages L.L.C. Tim Semrau, manager RE; Amendment to Alpine Cottages Plat Per City of Aspen Engineering office request, we have submitted a revised plat for the Alpine Cottages project. The only changes are; -A vicinity map has been added. -Final location of drywells and sidewalks has been incicated. Thank you, Tim Semrau MEMORANDUM TO: Engineering Department Fire Department U.S.Post Office Water Department Streets Department Police Department Communications Center Mary Lackner FROM: Sarah Oates,Planning Technician Community Development Department RE: Street Name Change—"Rene Court"to"Alpine Court" DATE: April 27, 1999 Representatives for the Alpine Cottages development,and the neighbors who currently live on Aene Court,are requesting a street name change to"Alpine Court." Please call me at 920-5441 if you have any questions or concerns about this street name by June 1, 1999, at which point a resolution approving the name will be presented to City Council