Loading...
HomeMy WebLinkAboutFile Documents.503 N 4th St.0074.2017 (3).ARBK50 3 N F O U R T H S T 00 7 4 . 2 0 1 7 . A R B K MC N A N I E 27 3 5 1 2 4 0 4 0 1 0 The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK SPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting -Epoxy anchors -Intumescent paint -Spray applied fire resistive materials -Permanent micropiles Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 0074.2017.ARBK SPECIAL INSPECTION AND TESTING AGREEMENT To permit applicants of project requiring special inspection and\or testing per Section 1704 of the International Building Code (IBC). Project Address: __________________________________ Permit Number:______________________ BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures. APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official, when performing the function of special inspector. Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable: A. Duties and Responsibilities of the Special Inspector 1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they shall sign in on the appropriate form posted with the building permit. 2. Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings, specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection. For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record. 3. Report nonconforming items. The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice. 4. Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items, c. Report on how nonconforming items were resolved or unresolved as applicable, d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items. 1 5. Provide Final Inspection Report. The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection. B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official. C. Engineer or Architect of Record Responsibilities 1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the IBC or the building official approves periodic inspection and the frequency of such inspections. 2. Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the special inspector. 3. Review shop drawings and submit design changes. The engineer or architect of record shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents, and shall submit revised documents for building official approval as required. D. Contractor Responsibilities 1. Notify the special inspector. The contractor is responsible for notifying the special inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall be provided so the special inspector has time to become familiar with the project. 2. Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans. 3. Retain special inspection records. Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector. E. Inspection of Fabricators 1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated items. 2. Fabrication and implementation procedures. The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for fabricator’s scope of work. F. Approved Fabricator Responsibilities 1. Fabrication exempt inspections. Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work without special inspection. 2 503 N 4TH ST 0074.2017.ARBK    IRC Building Description Form  New Gdrive/master files/building/apps, forms checklists BCM 1/13/14                              MASTER PERMIT#_______________________________             CHANGE ORDER #_______________________________             CHANGE ORDER #_______________________________  CHANGE ORDER #_______________________________  Building Description Form - IRC Property Location: Address: Unit #: Legal Description: (lot, Block) Owner: Owner Address: Parcel ID #: Building Code Information Code Editions: 2009 IRC 2009 IMC 2009 IPC 2009 IFGC 2009 IECC 2009 IFC 2011 NEC Fire Sprinkler System Installed: ______ NO _____ YES NFPA _____ Type of Construction: VB Required Special Inspections: ____High Strength Bolting ____Epoxy Anchors ____Structural Steel Welding ____Permanent Micropiles _____Other (specify): ______________________ Energy Code Compliance Path: ____Prescriptive Table ____ResCheck Performace ____ResCheck UA Tradeoff External Energy Use Snowmelt ______sq ft Existing ______sq ft New Spa _____ Pool ____ Building Description # Stories Above Grade _______ # Stories Below Grade ________ Garage: Attached______# Of Cars___ Detached______# Of Cars____ Carport_______ Bedrooms______ Full Baths_____3/4 Baths_____1/2 Baths_____ Kitchen_____ # Wood Fireplaces: _______ # Gas Appliances: _______ # Gas Logs:____________ Other Rooms: ____________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ACCESSORY DWELLING UNIT: Living______Kitchen_______Bath______Bedroom______Other:_________ Reviewed by Plans Examiner Date 503 N 4th Street aspen co 81611 lots R/Q/S Block 26 Sean McNannie 503 n 4th street aspen co 81611 273512404010 x 2 1 2 4 3 1 City of Aspen Received 5/2/17 Building Department 0074.2017.ARBK x x JH 7/11/17 Iris TD520005EN 11-12-2015 Frame Galvanized steel plaster frame with integral bar hanger receivers. Setscrews provide positive horizontal locking. Collar Matte black aluminum collar adjusts vertically for ½” - 1” thick ceilings and can be rotated ± 7.5° thru the aperture. Integral gun sights facilitate the use of guide strings or laser lines. Shipped with a paint overspray protector. Housing Double wall aluminum housing painted matte black for a visually dark interior. Removable hinged cover allow for top access. All fasteners are captive. Bar Hangers Captive preinstalled bar hangers adjust from 8-1/2” to 24” wide; pass thru allows shortening without removal. Captive nail penetrates standard and engineered lumber. Mounting flange levels platform with ceiling. Integral clip attaches direction to tee grid. Gaskets Closed cell gaskets achieve restrictive airflow requirements without additional caulking. Lamp Module Integral mounting clips facilitate installation from top access or thru the aperture. Locking screws (provided) lock lamp module to the housing. Electrical quick disconnect facilitates field service. LED Array Field interchangeable and upgradable light engine provides a uniform source with high efficiency and no pixilation. Available in remote or proximity phosphors in various color temperatures. Select color rendering index (CRI) of 90, 95 or 97 minimum providing excellent color quality. Color accuracy within 2 SDCM. Primary Reflector Segmented Miro® upper reflector yields a smooth square beam with uniform distribution. Diffuse glass mixing dome provides shielding to source and excellent color over angle uniformity over rated life. Lower Reflector Aluminum parabolic reflector provides for 55° cutoff and is available in a wide range of specular and semi specular Alzak finishes. Corrugated baffle option provides additional brightness control. Available in self-flanged or metal trim ring versions. May be installed rimless with optional rimless adapter. Trim Retention Mousetrap type springs pull flange tight to ceiling. Light trap eliminates spill light at edge of flange and reflector. Junction Box (7) ½” trade size pry outs, (3) non- metallic cable. Listed for (8) #12 AWG (four in, four out) 90°C conductors and feed thru branch wiring. Wago® quick connects for field wiring. Driver Integral 120 or 120-277V 50/60 Hz constant current driver provides noise free operation. Continuous, flicker-free leading or trailing edge phase cut dimming from 100 to 1% with select controls. Compliance Thermally protected, cULus listed for damp locations. UL1598 wet location labeled, covered ceiling mount only. Suitable for direct contact with insulation. Restrictive airflow per ASTM E283. EMI/RFI emissions per FCC 47CFR Part 15 class B limits and suitable for residential and commercial use. Contains no mercury or lead and RoHS compliant. Zhaga certified luminaire. Photometric testing in accordance with IES LM79. LED life testing in accordance with LM80. Warranty 5 year warranty. DESCRIPTION SPECIFICATION FEATURES Recessed medium distribution LED open downlight luminaire with 4 inch square aperture utilizing a LED array. Modular platform can be reconfigured from below the ceiling to accept a broad range of lamp modules and optical elements. Platform is suitable for 2x8 residential or commercial applications and can be used in direct contact with insulation. Platform + module + element combination produces square distribution with excellent light control and low aperture brightness. P408ICAT MH4LED E4DC Medium Distribution LED Open Downlight 4-Inch Square Aperture 4-1/2"[114mm] 5-3/4"[146mm] Catalog #Type Project Comments Date Prepared By Eaton is a founding member of the Zhaga Consortium Refer to ENERGY STAR® Qualified Products List. Can be used to comply with California Title 24 High Efficacy requirements. Certified to California Title 20 Appliance Efficiency Database. 15-3/4"[400mm] 10"[254mm] 7-1/16"[180mm] Cutout=5-3/16" [132mm] 7-7/8"[200mm] City of Aspen General/Building Permit Application 130 South Galena Street, Aspen Permit No.: Aspen, CO 81611 Phone (970) 920-5090 Fax (970) 920-5440 Master Permit No.: Unit #: Legal Description Block: PROJECT INFORMATION MECHANICAL NO.NO. FOR CITY USE ONLY Census Code Occupancy Group Zone District # of Stories # of Dwellings Type of Construction: APPROVALS Name Date Zoning Plan Check Permit Fee Parks Impact HPC Energy Code REMP School Ded. Building Zoning 50%Hourly Plan Check TDM Impact Fire District Eng. Review Zoning Hourly Review Ped. Amenity Engineering Cons. Mit. 50%Engineering Hourly Housing Cash- in-lieu CMP Parks Review Zoning 50%Stormwater fee in lieu Utilities Other Cons. Mit. 50%City Use Tax Water Electrical County Use Tax Sanitation Plumbing GIS Env. Health Mechanical Aspen San. Dist. Parks Utility Review Other Approved to issue by: Issued by: PERMIT TYPE: BD CO DE FD FN MH MS RF SN Gross Area This Permit (not FAR): Repair, Alteration, or Addition Water Closet (toilet), Bidet Bathtub Lavatory (wash basin) Total Fixture Count RECEIPTS: Fees due at Submittal: Shower Kitchen Sink & Disposal Dishwasher Laundry Bar, Utility Sinks Clothes Washer Floor Sink Floor Drain Hose Bib Square Footage Valuation PROJECT LOCATION Lot: Job Address: Parcel ID (call 920-5160) Valuation of Work: $ Tract or Subdivision: Const. Mit. Sq. Ft.:Disturbed Area:Utility Affected Area: Description of Work: Use of Building: Class of Work: Parks Affected Area:Existing Gross Area of Unit (not FAR): Fees due at Issuance: FEES Building Gross Sq. FootageAlarm System Req.Fire Sprinkler Req. Lot Area PLANS LOCATION: Occupancy Load Deed Restricted Unit Sq. Footage Accepted by: Other PLUMBING TYPE OF FIXTURE/ITEM PLUMBING continued Water Heater M/BTU ea. Gas Systems: # of Outlets Water Piping & Treating Equipment Other: ELECTRICAL Forced Air/Gravity Sys. BTU____________ AFUE________ Air Handling Unit - CFM Wall, Suspended, or Unit Heaters Evaporative Coolers Snowmelt System Sq. Ft. Ventilation Fans Appliance Vents Range Hood Boilers, (includes vent) BTU_____________ AFUE_______ Gas Systems: # of Outlets TYPE OF EQUIPMENT Repair, Alteration, or Addition Gas Log Gas Appliance nonoyesyes Single Family Multi-Family Commercial/Residential Commercial OtherNewAdditionAlterationRepair Other Move Tenant Finish Demo Change Order 26r/q/s 273512404010n/a Interior remodel of a duplex unit, One structural column removed. No load bearing framing walls affected. New framing, no exterior work, no new sq.ft. 6,131 2 2 2 7 1 20000 1572 CS GL 5/2/17 6/13/17 7/11/17 7/11/17 TK JH JH 6/9/17 7/10/17 7/10/17 PM SW 503 North 4th Street, Aspen CO 81611 4 4 1,572 Choose option from dropdown 0074.2017.ARBK 40 2172 217285,700 1718.19 325.00 325.00 1162.02 1162.0250.00 2643.38 214.25 3383 VB2434IRC X R6 Scanned by CamScanner mihi@mcnanie.com michael@aliusdc.com SKPE Avalon Guarino 7/12/17 ADC Owner Builder (Mihi and Sean Mcnanie)8584817797 7193319211 9279510 503 N 4th St Aspen 81611 1331 East Sopris Creek Road basalt 81621 298 PArk Ave. unit 301 basalt 81621 4 0074.2017.ARBK DESIGN CORPS ALIUS DESIGN CORPS ALIUS AS P E N , CO MC N A N I E RE M O D E L MTE 1615 ISSUE PROJECT No: DRAWN BY: DRAWING SET COPYRIGHT 2017 ALIUS DESIGN CORPS LLC. ALL RIGHTS RESERVED TITLE SHEET 1.1 01/09/2017SCHEMATIC DESIGN I 04/12/2017PERMIT SET MCNANIE REMODEL justinh 7/11/2017 City of Aspen Received 7/11/17 Building Department DESIGN CORPS ALIUS DESIGN CORPS ALIUS AS P E N , CO MC N A N I E RE M O D E L MTE 1615 ISSUE PROJECT No: DRAWN BY: DRAWING SET COPYRIGHT 2017 ALIUS DESIGN CORPS LLC. ALL RIGHTS RESERVED PROJECT INFORMATION 1.2 01/09/2017SCHEMATIC DESIGN I 04/12/2017PERMIT SET 1. The Contract Documents include: (1) general notes; (2) architectural, mechanical, and structural drawings. All additional specifications, details, drawings, clarifications, or changes shall automatically become part of the Contract Documents. Any discrepancy between any components of any of the drawings shall be reported to the Architect immediately for clarification. 2. Alius Design Corps, LLC, shall not be liable in any way for problems which arise from failure, by any third party or any party to this Contract, to follow the design plans. The Contractor shall obtain and/or request guidance of Alius Design Corp., with respect to any errors, omissions, inconsistencies, or conflicts or unclear information which may be discovered or alleged. 3. The Plans and Specifications are the intellectual and other property of the Architect and shall not beused without the permission of same. 4. All work shall comply with all state and local codes, ordinances, rules, regulations and laws of building officials or authorities having jurisdiction. All work shall be performed to the highest standards or craftsmanship by all tradesman. Alius Design Corps, LLC., shall not be responsible for overseeing third party work, nor shall Alius Design Corps, LLC., be liable for any errors or omissions of third parties who perform work on the Project. 5. The Contract Documents represent the finished structure. They do not indicate the method of construction. The Contractor shall provide all measures necessary to protect the structure during construction. Observation visits to the site by the Structural Engineer or Architect shall not include inspection of the ____________, nor will the architect or structural engineer be responsible for the contractor's means, methods, techniques, sequences for procedure of construction, or the safety precautions and the techniques, sequences for procedure of construction, or any safety precautions. The Contractor and not the Architect shall be responsible for all Federal and OSHA regulations. 6. THE DRAWINGS ARE NOT TO BE SCALED. Written dimensions must be used. In the event of a discrepancy in dimensions, the Architect should be timely notified for clarification. All dimensions on the drawings shall be verified against the existing conditions. All dimensions are to rough framing or face of concrete unless noted otherwise. 7. The Construction Documents are intended to include all labor, materials, equipment, and services required to complete all work described herein. It is the responsibility of the Contractor to bring to the attention of the Architect any conditions which will not permit construction according to these Construction Documents. 8. The Building Inspector shall be notified by the Contractor if there is need of an inspection as required by the I.R.C., or by any local code or ordinance. 9. LOT STAKED: The Contractor shall arrange for the building to be located and staked after demolition or site clearing, to be approved by the Architect. The Contractor shall review the lot staking and verify, to the best of his ability, its accuracy. The Contractor shall also check the grade where it meets the building to evaluate the consistency with the drawings during excavation. All work to be done by a certified surveyor. 10. RECORD DRAWINGS: Contractor shall maintain a complete set of blue/black-line prints of contract drawings and shop drawings for record mark-up purposes throughout the Contract time. Mark-up drawings during course of the work shall show changes and actual installation conditions, sufficient to form a complete record for Owner's purposes. 11. SOILS AND CONCRETE: The General Contractor shall arrange for a visual site inspection at the completion of excavation by a soils engineer, and the required concrete testing prior to any foundation work. 12. Property lines, utilities and topography shown is representative of information taken from a survey. Contractor shall notify Architect of any discrepancy or variation between the Drawings and actual site conditions. ABREVIATIONS A.F.F. ABOVE FINISH FLOOR ADJ. ADJUSTABLE ALT. ALTERNATE A.B. ANCHOR BOLTS & AND ARCH. ARCHITECTURAL @ AT BM. BEAM BM. PKT. BEAM POCKET BRG. BEARING BLK’G. BLOCKING BOT. BOTTOM BLDG. BUILDING B.O. BY OWNER CLG. CEILING CL. CENTER LINE CLR. CLEAR COL. COLUMN CONC. CONCRETE CONN. CONNECTION CONT. CONTINUOUS DTL. DETAILS DWL. DOWEL E.W. EACH WAY ELEV. ELEVATION EXISTG EXISTING EXT. EXTERIOR FLR. FLOOR FTG. FOOTING FND. FOUNDATION GA. GAUGE G.L. GLU-LAM G.W.B. GYPSUM WALL BOARD HORIZ. HORIZONTAL INFO. INFORMATION INSUL. INSULATION JST. JOIST N.I.C. NOT IN CONTRACT O.C. ON CENTER OPP. OPPOSITE PERF. PERFORATED PL. PLATE PLY. PLYWOOD PROP. LINE PROPERTY LINE REINF. REINFORCEMENT REQ. REQUIRED REV. REVISED SIM. SIMILAR S.F. SQUARE FEET STD. STANDARD THK. THICK T.P. TOP OF PLATE T.L. TOP OF LEDGE T.W. TOP OF WALL TOT. TOTAL TYP. TYPICAL U.N.O. UNLESS NOTED UTHERWISE V.I.F. VERIFY IN FIELD 033 LBB CLIENT The McNannie Family 503 Nth 4th Street Aspen, CO 81611 ARCHITECT Alius Design Corps, LLC 1331 East Sopris Creek Rd. Basalt, CO 81611 719.331.9211 michaeltedinger@gmail.com STRUCTURAL ENGINEER SKPE 204 Park Ave # 1C, Basalt, CO 81621 818.515.7233 GENERAL CONTRACTOR TBD PROJECT INFORMATION PRESIDING CODE .......................................................................................................................................................................... 2015 IRC LOT SIZE ................................................................................................................................................................................ 9,000 +/- sq.ft. LOCAL ZONING ....................................................................................................................................................................................... R-6 CONSTRUCTION TYPE ...................................................................................................................................................................... TYPE V WORK SCOPE ....................................................................................................................................................... INTERIOR RENOVATION GENERAL RENOVATION NOTES 1.0 All existing conditions must be verified by the contractor in the field. Unknown and varied conditions may be found. Notify the structural engineer and/or architect of any structural or architectural conditions found to vary from that indicated from the drawings. Design revisions may be required, and are to be expected as a process of remodel work. 2.0 All new work, details, surfaces, or finishes shall match adjacent existing surfaces unless noted or directed otherwise by the owner or interior designer. Contractor to verify with architect any conflict between existing and new conditions. 3.0 All electrical modifications and/or additions to be as directed by owner/lighting designer during construction. Contractor/lighting designer to verify electrical capacity and review new designs or alterations with architect, prior to implementation. 4.0 All interior electrical fixtures, plumbing fixtures and trim, cabinet design, and other finishes to be at the directive of the owner or interior designer unless noted otherwise in the drawings. Contractor to provide all necessary prep work for installation of any materials as required. 5.0 Structural engineering – if any modifications to the existing structural system are deemed necessary beyond these shown in the drawings, all existing conditions are to be verified in the field by a registered structural engineer before proceeding. The architect will not be responsible for any structural modifications not verified or approved by a structural engineer. 6.0 Contractor will verify and coordinate all openings through floors, ceilings, and walls with all architectural, structural, mechanical, plumbing, and electrical design and construction. ARCHITECTURAL 1.1 TITLE SHEET 1.2 GENERAL INFORMATION 2.1 SITE PLAN 3.1 1/4” LOWER LEVEL PLANS 3.2 1/4” MAIN LEVEL PLANS 3.3 1/4” UPPER LEVEL PLANS 7.1 ASSEMBLIES AND DETAILS 7.2 1 ½” WALL ASSEMBLIES AND DETAILS STRUCTURAL DRAWINGS S-122 UPPER FLOOR FRAMING S-123 ROOF FRAMING S-531 DETAIL SHEET 5.1A PROJECT LOCATION MCNANIE REMODEL REFERENCE GRID LINE SPOT ELEVATION WINDOW MARK DOOR MARK ROOM NUMBER DRAWING REVISION ASSEMBLY DETAIL CUT SECTION CUT EXTERIOR ELEVATION DETAIL CALLOUT INTERIOR ELEVATION ROOM 100 F11 1 T. O. RIDGE BEAM 123'-6 1/2" 4.4 1 1 7.1 8.1 1 2 3 4 VICINITY MAP SYMBOL & MATERIAL LEGEND PROJECT INFORMATION DRAWING INDEX PROJECT DIRECTORY CONSTRUCTION NOTES ABBREVIATIONS PE R M I T SE T 04 /12 /20 1 7 GENERAL NOTES ****FAR SHOWN FOR REFERENCE. NO EXTERIOR WORK SCOPE INCLUDED, NO ADDITIONAL FLOOR AREA BEING ADDED.**** SCOPE OF WORK NOTES 8 justinh 7/11/2017 City of Aspen Received 7/11/17 Building Department DESIGN CORPS ALIUS DESIGN CORPS ALIUS AS P E N , CO MC N A N I E RE M O D E L MTE 1615 ISSUE PROJECT No: DRAWN BY: DRAWING SET COPYRIGHT 2017 ALIUS DESIGN CORPS LLC. ALL RIGHTS RESERVED FLOOR AREA CALCULATIONS 1.3 01/09/2017SCHEMATIC DESIGN I 04/12/2017PERMIT SET 125 sq ft 78 sq ft 321 sq ft 12 sq ft 9 sq ft86 sq ft 120 sq ft12 sq ft 9 sq ft107 sq ft 150 sq ft 107 sq ft 150 sq ft 231 sq ft 321 sq ft 335 sq ft 425 sq ft 1,176 sq ft1,176 sq ft 250 sq ft 250 sq ft 135 sq ft GARAGE AREA EXEMPT FROM FAR GARAGE AREA EXEMPT FROM FAR @ 50% GARAGE AREA NOT EXEMPT FROM FAR 1,176 sq ft 1,176 sq ft 396 sq ft 396 sq ft 0 4'8'16'SCALE: 1/8" = 1'-0"1 LOWER LEVEL FAR 0 4'8'16'SCALE: 1/8" = 1'-0"2 MAIN LEVEL FAR 0 4'8'16'SCALE: 1/8" = 1'-0"3 UPPER LEVEL FAR LOT SIZE: 9,000 sq.ft. ALLOWABLE FAR: 4,080 sq.ft. FAR CALCULATIONS LEVEL LOWER MAIN GARAGE UPPER DECK TOTAL GROSS 2,352 2,352 635 792 170 6,131 NET 682 2,352 260 792 0 4,086 NOTES 29% OF LL WALLS EXPOSED (2,352*.29) 375 sq.ft. OF GARAGE AREA EXEMPT (250 + 250*.5) 174 < 15% OF ALLOWABLE FAR (4,080*.15=612) UNIT A & B justinh 7/11/2017 City of Aspen Received 7/11/17 Building Department DESIGN CORPS ALIUS DESIGN CORPS ALIUS AS P E N , CO MC N A N I E RE M O D E L MTE 1615 ISSUE PROJECT No: DRAWN BY: DRAWING SET COPYRIGHT 2017 ALIUS DESIGN CORPS LLC. ALL RIGHTS RESERVED SITE PLAN 2.1 01/09/2017SCHEMATIC DESIGN I 04/12/2017PERMIT SET 0 4'8'16'SCALE: 1/8" = 1'-0"1 SITE PLAN SITE PLAN NOTES: 1. ALL WORK SCOPE LIMITED TO WITHIN THE EXISTING BUILDING FOOTPRINT; NO SITE WORK, GRADING, OR NEW STRUCTURE PROPOSED. 2. EXISTING BUILDING FOOTPRINT TO REMAIN; NO ADJUSTMENTS TO EXTERIOR WALL LOCATIONS OR ROOF LINES. 3. ALL INTERIOR FLOORPLAN WORK LIMITED TO THE EAST SIDE HALF OF THE DUPLEX. justinh 7/11/2017 City of Aspen Received 7/11/17 Building Department DESIGN CORPS ALIUS DESIGN CORPS ALIUS AS P E N , CO MC N A N I E RE M O D E L MTE 1615 ISSUE PROJECT No: DRAWN BY: DRAWING SET COPYRIGHT 2017 ALIUS DESIGN CORPS LLC. ALL RIGHTS RESERVED LOWER LEVEL FLOOR PLANS 3.1 01/09/2017SCHEMATIC DESIGN I 04/12/2017PERMIT SET B C 3 3 1 1 A A 4 4 2 2 LIVING ROOM MECH ROOM BEDROOM 1 BEDROOM 2 UNDER STAIR STORAGE BATHROOM KITCHEN UP NO WORK SCOPE PROPOSED; L.L. TO REMAIN ADJACENT DUPLEX UNIT; NO WORK INCLUDED IN SCOPE A5.1 A5.1 C5.1C5.1 24.1 14.1 14.2 D5.1 0 2'4'8'SCALE: 1/4" = 1'-0"1 LOWER LEVEL PLAN-EXISTING justinh 7/11/2017 City of Aspen Received 7/11/17 Building Department SA SA SA CO SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 DESIGN CORPS ALIUS DESIGN CORPS ALIUS AS P E N , CO MC N A N I E RE M O D E L MTE 1615 ISSUE PROJECT No: DRAWN BY: DRAWING SET COPYRIGHT 2017 ALIUS DESIGN CORPS LLC. ALL RIGHTS RESERVED MAIN LEVEL FLOOR PLANS 3.4 01/09/2017SCHEMATIC DESIGN I 04/12/2017PERMIT SET B C 3 3 1 1 A A 4 4 2 2 LIVING ROOM KITCHEN PWDR FOYER UPDN ADJACENT DUPLEX UNIT; NO WORK INCLUDED IN SCOPE BEDROOM 3 MUDROOM GARAGE F R STAIRS B C 3 3 1 1 A A 4 4 2 2 51/2"6'-0"31/2"3'-6"31/2"5'-111/2"31/2"5'-1"31/2"5'-31/2" 2' - 0 " 31/2" 31/2" 8'-61/2" 51/2" 31/2" 5'- 0 " 31/2" LIVING ROOM KITCHEN PWDR FOYER DN ADJACENT DUPLEX UNIT; NO WORK INCLUDED IN SCOPE BEDROOM 3 MUDROOM GARAGE W1 OVEN FRIDGE WINE/ COFFEE TRASH D/W TRASH NEW STAIR SEE SHEET 7.1 FOR DIMISING WALL DETAILS, TYP. SEE STRUCT. FOR COLUMN REMOVAL FILL IN WALL @ STAIR EXTEND CRIPPLE WALL UNDER NEW STAIR OPENING IN GUARD TO RESTRICT PASSAGE OF A 4" DIAMETER SPHERE PER IRC 312.1.3 STAIRS 0 2'4'8'SCALE: 1/4" = 1'-0"1 MAIN LEVEL PLAN-EXISTING 0 2'4'8'SCALE: 1/4" = 1'-0"1 MAIN LEVEL PLAN-NEW justinh 7/11/2017 City of Aspen Received 7/11/17 Building Department SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 SA SA CO MA V EE HR GR SG DESIGN CORPS ALIUS DESIGN CORPS ALIUS AS P E N , CO MC N A N I E RE M O D E L MTE 1615 ISSUE PROJECT No: DRAWN BY: DRAWING SET COPYRIGHT 2017 ALIUS DESIGN CORPS LLC. ALL RIGHTS RESERVED UPPER LEVEL FLOOR PLANS 3.5 01/09/2017SCHEMATIC DESIGN I 04/12/2017PERMIT SET B C 3 3 1 1 A A 4 4 2 2 OVERFRAME DN DECK OVERFRAME OPEN TO BELOW ADJACENT DUPLEX UNIT; NO WORK INCLUDED IN SCOPE MASTER BATHROOM MASTER BEDROOM B C 3 3 1 1 A A 4 4 2 2 31/2" 20 '-51/2" 31/2" 7' - 0 " 51/2" 51/2"13'-3"31/2"2'-3"31/2" 31/2" 8' - 2 " 31/2" 12 ' - 0 " 31/2" 3'-81/2" 31/2" 3' - 0 " 51/2" 31/2"1'-01/2"31/2" 10 ' - 8 " 31/2" 51/2"9'-43/4"31/2"4'-4"31/2"12'-111/4"51/2" 51/2"27'-3"51/2" 51/2"7'-71/4" 5'-81/2"31/2" DN DECK MASTER BATHROOM OVERFRAME OPEN TO BELOW ADJACENT DUPLEX UNIT; NO WORK INCLUDED IN SCOPE W1 MASTER BEDROOM MASTER CLOSET EXISTING LIGHTS IN VAULTED CEILING TO REMAIN 31/2" 5'-91/2" 3'-81/2" NEW STAIR FILL IN EXIST. OPENING NICHE 0 2'4'8'SCALE: 1/4" = 1'-0"1 UPPER LEVEL PLAN-EXISTING 0 2'4'8'SCALE: 1/4" = 1'-0"1 UPPER LEVEL PLAN-NEW justinh 7/11/2017 City of Aspen Received 7/11/17 Building Department V V SG SA SA CO HR GR EE SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 DESIGN CORPS ALIUS DESIGN CORPS ALIUS AS P E N , CO MC N A N I E RE M O D E L MTE 1615 ISSUE PROJECT No: DRAWN BY: DRAWING SET COPYRIGHT 2017 ALIUS DESIGN CORPS LLC. ALL RIGHTS RESERVED MAIN LEVEL R.C.P.'S 3.6 01/09/2017SCHEMATIC DESIGN I 04/12/2017PERMIT SET B C 3 3 1 1 A A 4 4 2 2 EXIST EXIST EXIST EXIST EXIST EXIST EXIST EXISTEXIST EXISTEXIST EXISTEXIST EXISTEXIST EXISTEXIST EXISTEXIST LIVING ROOM KITCHEN PWDR FOYER DN ADJACENT DUPLEX UNIT; NO WORK INCLUDED IN SCOPE BEDROOM 3 MUDROOM GARAGE OPEN TO ABOVE STAIRS B C 3 3 1 1 A A 4 4 2 2 A A A A A A A LIVING ROOM KITCHEN PWDR FOYER DN ADJACENT DUPLEX UNIT; NO WORK INCLUDED IN SCOPE BEDROOM 3 MUDROOM GARAGE OPEN TO ABOVE EXIST. LIGHTING TO REMAIN EXIST. LIGHTING TO REMAIN EXIST. LIGHTING TO REMAIN STAIRS 0 2'4'8'SCALE: 1/4" = 1'-0"1 MAIN LEVEL R.C.P. EXIST 0 2'4'8'SCALE: 1/4" = 1'-0"1 MAIN LEVEL R.C.P. NEW 75% LAMPS TO BE HIGH EFFICACY PER 2015 IEC justinh 7/11/2017 City of Aspen Received 7/11/17 Building Department DESIGN CORPS ALIUS DESIGN CORPS ALIUS AS P E N , CO MC N A N I E RE M O D E L MTE 1615 ISSUE PROJECT No: DRAWN BY: DRAWING SET COPYRIGHT 2017 ALIUS DESIGN CORPS LLC. ALL RIGHTS RESERVED UPPER LEVEL R.C.P.S 3.7 01/09/2017SCHEMATIC DESIGN I 04/12/2017PERMIT SET B C 3 3 1 1 A A 4 4 2 2 EXIST. EXIST.EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. DECK ADJACENT DUPLEX UNIT; NO WORK INCLUDED IN SCOPE MASTER BATHROOM MASTER BEDROOM OVERFRAME OVERFRAME 6:12 6:12 6:12 6:12 B C 3 3 1 1 A A 4 4 2 2 A A EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. EXIST. A A A A A A A A A A A A A A A DECK ADJACENT DUPLEX UNIT; NO WORK INCLUDED IN SCOPE 6:12 6:12 6:12 6:12 EXISTING LIGHTS IN VAULTED CEILING TO REMAIN 0 2'4'8'SCALE: 1/4" = 1'-0"1 UPPER LEVEL R.C.P. EXIST. 0 2'4'8'SCALE: 1/4" = 1'-0"1 UPPER LEVEL R.C.P. NEW 75% LAMPS TO BE HIGH EFFICACY PER 2015 IEC justinh 7/11/2017 City of Aspen Received 7/11/17 Building Department DESIGN CORPS ALIUS DESIGN CORPS ALIUS AS P E N , CO MC N A N I E RE M O D E L MTE 1615 ISSUE PROJECT No: DRAWN BY: DRAWING SET COPYRIGHT 2017 ALIUS DESIGN CORPS LLC. ALL RIGHTS RESERVED ASSEMBLIES & DETAILS 7.1 01/09/2017SCHEMATIC DESIGN I 04/12/2017PERMIT SET 5/8"SEE PLAN 5/8" 5/8" GYPSUM WALL BOARD OR OTHER INTERIOR FINISH - SEE SCHEDULE WALL FRAMING W/ BLOCKING AS REQUIRED SOUND ATTENUATING INSULATION - REFER TO SPECS 5/8" GYPSUM WALL BOARD OR OTHER INTERIOR FINISH - SEE SCHEDULE 1 ½" = 1'-0" INTERIOR WALL (TYPICAL) UL LISTING TEST # U3444W1 GL 3" = 1'-0"1 WALL CONNECTION @ DEMISING WALL EXISTING 2x6 DOUBLE WALL EXIST. DEMISING WALL NOT TO BE DISTURBED. ALL NEW INTERIOR W1 WALLS TO KEEP EXIST. DRYWALL/EXISTING WALL ASSEMBLY INTACT. INTERIOR WALL (W1) justinh 7/11/2017 City of Aspen Received 7/11/17 Building Department O LIDCAERNOSLEODC P RREOEFNEISGSNIOE N LA PK . ENIEGHHPTEATLS25777 6-29-17 justinh 7/11/2017 City of Aspen Received 7/11/17 Building Department O LIDCAERNOSLEODC P RREOEFNEISGSNIOE N LA PK . ENIEGHHPTEATLS25777 6-29-17 justinh 7/11/2017 City of Aspen Received 7/11/17 Building Department O LIDCAERNOSLEODC P RREOEFNEISGSNIOE N LA PK . ENIEGHHPTEATLS25777 6-29-17 justinh 7/11/2017 City of Aspen Received 7/11/17 Building Department O LIDCAERNOSLEODC P RREOEFNEISGSNIOE N LA PK . ENIEGHHPTEATLS25777 6-29-17 justinh 7/11/2017 City of Aspen Received 7/11/17 Building Department