Loading...
HomeMy WebLinkAboutFile Documents.533 W Hallam St.0285.2018 (76).ARBK DRAINAGE REPORT FOR DUNCAN SKIHAUS 533 W. HALLAM STREET, ASPEN, CO. I hereby affirm that this report and the accompanying drawings for the analysis of 533 W. Hallam Street, Aspen, Colorado was prepared under my direct supervision for the owners thereof in accordance with the provisions of the City of Aspen Urban Runoff Management Plan with proposed variances and exceptions listed thereto. I understand that it is the policy of the City of Aspen that the City of Aspen does not and will not assume liability for drainage facilities designed by others. November 28, 2018 Prepared by 118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 970.945.1004 970.945.5948 fax 12/04/201810/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design i DRAINAGE REPORT FOR DUNCAN SKIHAUS 533 W. HALLAM STREET, ASPEN, CO REVIEWED BY SGM Project # 2018-292.001 I:\2018\2018-292-DuncanSkihaus\001\E-Reports\SGM\Dun-Drainage-Report\docs\Duncan- Drainage-Report.docx 11/28/18 12/04/201810/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design ii TABLE OF CONTENTS 1.0 Existing Site 3 1.1 Description of Existing Site 3 1.2 Description of Existing Drainage 3 2.0 Proposed Project 3 3.0 Proposed Basins 4 3.1 Basin A (sub-basins 1 & 2) 4 Sub-basin 1 5 Sub-basin 2 5 3.2 Basin B (sub-basins 3, 6, & 7) 5 Sub-basin 3 6 Sub-basin 6 6 Sub-basin 7 6 3.3 Basin C (sub-basin 4) 7 3.4 Basin D (sub-basin 5) 7 4.0 Peak Flow Methodology 8 5.0 Water Quality Methodology 9 6.0 Maintenance 10 6.1 Grass Buffer Maintenance 10 6.2 Pervious Pavers 11 7.0 Conclusion 12 LIST OF APPENDICES Appendix A – Proposed Drainage Routing Schematic Appendix B – Tree Canopy Credit Map Appendix C – Water Quality Capture Volume Calculations Appendix D – Peak Flow Calculations – Proposed Conditions 12/04/201810/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design 3 1.0 Existing Site 1.1 Description of Existing Site The physical address of the project is 533 W. Hallam Street, Aspen, Colorado and it is located on parcel no. 2735-124-32-001. This parcel is approximately 0.14 acres and is owned by Duncan Skihaus LLC. Current zoning of the property is medium-density residential (R-6). The existing structures on the parcel are one house and a small shed. The project focuses on renovating the house while preserving the historic portion of it. The existing house is 1897 square feet and has two stories with a garage located near the Block 29 alley. 1.2 Description of Existing Drainage Existing storm water runs off several areas of the existing house either as sheet flow or through gutters and downspouts. On the west and north sides of the site, runoff sheet flows over grass to the curb and gutters along W. Hallam & 5th Streets, respectively. Runoff on the east side of the building currently enters the neighboring property. Storm water on the south side of the property enters the alley. No existing storm water detention or treatment BMPs have been found on the site. There is no existing offsite runoff that enters the property. Existing peak flow calculations have not been provided for this report because detention will not be required and runoff will not cross any other properties before discharging to the City of Aspen (COA) storm sewer system. 2.0 Proposed Project The primary purpose of this project is to demolish the non-historic portion of the existing house and build a new addition. Other improvements include the addition of onsite snowmelt and improving storm water runoff quality. The proposed project is considered a major project as defined by the COA Urban Runoff Management Plan (URMP) because more than 1000 square feet and 25% of the site will be disturbed. The proposed residential development with have a footprint of 3160 square feet. The historical portion of the property, which has a footprint of 900 square feet, will be moved north but will remain intact. The main building will be located on the southern portion of the lot with a footprint of 2260 square feet. Storm water quality improvements consist of 150 square feet of grass buffer, 260 square feet of no-infiltration pervious pavers, 315 square feet of no-infiltration pervious gravel and 6.5 cubic feet of rain gardens. The grass buffer will be located on the northern portion of the lot. The no-infiltration pervious pavers will be located on the western central portion of the lot. The no-infiltration pervious gravel will be located on the eastern central portion of the lot. A rain garden is located on the northeast portion of the lot. No storm water generated on the site will flow across the eastern property line onto the neighboring residential lot due to the 12/04/2018 Please discuss soil types in Section 1.2 of the Drainage Report Report indicates 260 SF of pervious pavers while drainage exhibit shows 216 SF.10/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design 4 placement of a curb on the shoring wall exposed slightly above grade. Runoff from the eastern side of the lot will flow north to W. Hallam St. through grading. 3.0 Proposed Basins The proposed site has 7 sub-basins, as shown in Appendix A. To clearly describe these sub-basins, they have been grouped into 4 drainage basins based on shared discharge locations and water quality treatment. A summary of the basins can be seen below in Table 1 and detailed calculations for Table 1 can be found in Appendix C. Storm water runoff will be routed to designated BMPs for water quality treatment through a combination of grading and gutters with downspouts. All proposed storm water runoff will discharge from the site as sheet flow to W. Hallam & N. 5th Streets. Basins are detailed in the sections that follow, with tables showing that the required WQCV is treated by BMPs within the basin. The Available WQCV (cf) is calculated as the WQCV provided (in cubic feet) based on grass buffer areas, tree canopy credits, proposed rain garden volume, and proposed non-infiltrating pervious paver void volume. Table 1 – Basin Summary 3.1 Basin A (sub-basins 1 & 2) Basin A is located on the north side of the site generally between the property line and the Duncan Skihaus historic building with additional drainage from the front of the historic roof. Sub-basins 1 and 2 comprise Basin A. This basin is 1356 square feet of which 488 square feet is impervious. Tree canopy credit is calculated per section 8.4.1 of the COA URMP, a detailed calculation is shown in Error! Reference source not found.. A 150 square foot grass buffer and a 6.5 cubic foot rain garden will be used to treat the remaining WQCV. See Appendix A for the proposed location of BMPs in this basin. 12/04/2018 It appears your Word template has a broken reference in Section 3.1 of the Drainage Report. 10/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design 5 Table 2 Basin A Basin Area (sf) 1356 % Impervious 36% Required WQCV (cf) 8.39 Credits Pervious Paver Area (sf) 0 Grass Buffer Area (sf) 0 Tree Canopy Credit Area (sf) 107 No-infiltration Paver Vol. (cf) 0.0 Rain Garden Vol. (cf) 6.5 Results Effective Impervious Area (sf) 230.9 Effective % Imperviousness 17% Net WQCV (cf) -1.7 Available WQCV (cf) 10.13 Sub-basin 1 Sub-basin 1 is located towards north-east corner of the property and has a total and impervious area of 684 and 254 square feet, respectively. This corresponds to 37% impervious area for the sub-basin. This area is mostly a grassed area with the north-eastern portion of the roof included. Storm water will be routed from the roof to a rain garden via roof drainage and gutter downspouts then north to the curb and gutter on W. Hallam St. Sub-basin 2 Sub-basin 2 is located at the very north-west corner of the property and has a total and impervious area of 672 and 234 square feet, respectively. This corresponds to 35% impervious area for the sub-basin. This area is mostly a grassed area with the north-western portion of the roof included. Storm water will be routed from the roof to a 150 square foot grass buffer via sheet flow and then north to the curb and gutter on W. Hallam St. 3.2 Basin B (sub-basins 3, 6, & 7) Basin B is located on the eastern boundary of the site, with a “leg” that reaches the northern boundary of the site and will collect runoff from the back side of the roof of the historic house and the north end of the proposed structure. Sub-basins 3, 6, and 7 comprise Basin B. Storm water runoff will flow from roof areas toward the east property boundary over no- infiltration pervious gravel and then over the front lawn near W. Hallam Street. This basin is 2744 square feet of which 1921 square feet is impervious. No-infiltration pervious gravel, and tree canopy credit will be used to treat the remaining WQCV. The proposed no- infiltration pervious gravel is 315 square feet. See Appendix A for the proposed location of BMPs in this basin. The no-infiltration pervious gravel is based off of the no-infiltration pervious paver detail found in figure 8.31 of the COA URMP. Since the landscape architect preferred a gravel surface in this area and the pavers provide no treatment, they are not being used. After water infiltrates through the gravel and enters the slot drain, it is 12/04/2018 In Table 2 the grass buffer area is omitted, however sub basin 2 utilizes a grass buffer. Impervious area to grass buffer ratio must be 1:1. Refer to page 8-43 of the URMP. 10/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design 6 discharged by a reverse trench drain to ensure runoff is leaving the site in the same manner it did historically. Table 3 Basin B Basin Area (sf) 2537 % Impervious 76% Required WQCV (cf) 33.3 Credits Pervious Paver Area (sf) 0 Grass Buffer Area (sf) 0 Tree Canopy Credit Area (sf) 4.2 No-infiltration Paver Vol. (cf) 56.3 Rain Garden Vol. (cf) 0.0 Results Effective Impervious Area (sf) 1917 Effective % Imperviousness 76% Net WQCV (cf) -19.3 Available WQCV (cf) 52.6 Sub-basin 3 Sub-basin 3 is located along the eastern portion of the property, toward W. Hallam Street, and has a total and impervious area of 1262 and 970 square feet, respectively. This corresponds to 66% impervious area for the sub-basin. All storm water in sub-basin 3 will be routed by grading, downspouts and gutters to 168.3 square feet of no-infiltration pervious gravel. Remaining WQCV is treated by tree canopy credits. The no-infiltration pervious gravel in sub-basin 3 result in roughly 11.3 cubic feet of excess available WQCV that can accommodate any untreated runoff from sub-basin 6 (see Section 3.2.2 ). Sub-basin 6 Sub-basin 6 is located on the east-central portion of the property and has a total and impervious area of 442 and 327 square feet, respectively. This corresponds to 74% impervious area for the sub-basin. All storm water in sub-basin 6 will be routed by grading, downspouts and gutters to 126.5 square feet of no-infiltration pervious gravel. This results in roughly 15.5 cubic feet of excess available WQCV that can accommodate untreated runoff from sub-basin 7 (see Section 3.2.3). Sub-basin 7 Sub-basin 7 is located on the southern portion of the property and extends from the western most extent to the eastern. Sub-basin 7 has a total and impervious area of 835 and 624 square feet, respectively. This corresponds to 75% impervious area for the sub-basin. This sub-basin is adjacent to the alley along the southern property boundary and has a garage. Runoff generated will not be conveyed through the alley. The runoff from sub-basin 7 will be routed by grading, downspouts and gutters to 43.2 square feet of no-infiltration pervious 12/04/201810/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design 7 gravel. Drainage and grading will allow roughly 3.6 cubic feet of untreated runoff in this basin will sheet flow into sub-basin 6, where there is excess available treatment volume provided by the no-infiltration pervious pavers. 3.3 Basin C (sub-basin 4) Basin C is located on the north-west side of the site and will collect runoff from the back side of the roof for the historic building and the north end of the proposed structure. Basin C consists only of sub-basins 4. Storm water will be routed from both roofed areas to no- infiltration pervious pavers and then to the curb and gutter on 5th St. This basin is 1312 square feet of which 720 square feet is impervious. Storm water runoff will be treated with 135 square feet of no-infiltration pervious pavers. Remaining WQCV is expected to be treated by the reduction in impervious area provided by a 84.7 square foot tree canopy credit. See Appendix A for the proposed location of BMPs in this basin. After water infiltrates through the gravel and enters the slot drain, it is discharged by a reverse trench drain to ensure runoff is leaving the site in the same manner it did historically. Table 4 Basin C Basin Area (sf) 796 % Impervious 33% Required WQCV (cf) 4.56 Credits Pervious Paver Area (sf) 0 Grass Buffer Area (sf) 0 Tree Canopy Credit Area (sf) 80.5 No-infiltration Paver Vol. (cf) 22.57 Rain Garden Vol. (cf) 0.0 Results Effective Impervious Area (sf) 178 Effective % Imperviousness 22% Net WQCV (cf) -19.1 Available WQCV (cf) 23.68 3.4 Basin D (sub-basin 5) Basin D is located along the west-central portion of the, comprised solely of sub-basin 5. Storm water will be routed from the roof to a grass buffer, rain garden and pervious pavers. Runoff will then sheet flow to the curb and gutter on 5th St. This basin is 1312 square feet of which 720 square feet is impervious. A grass buffer, pervious pavers, and a rain garden will be used to treat runoff from the roof. The proposed grass buffer is 161 square feet and the proposed pervious pavers cover 80.8 square feet. A rain garden is proposed to captured 5.68 cubic feet of runoff. Remaining WQCV is treated by the reduction in effective impervious area provided by the 104 square foot tree canopy credit. See Appendix A for the proposed location of BMPs in this basin. 12/04/2018 Please check all areas in the narrative for Basin C and ensure they are consistent with the rest of the Drainage Report. Please check all areas in the narrative for Basin D and ensure they are consistent with the rest of the Drainage Report. No rain garden is shown in basin 5. 10/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design 8 Table 5 Basin D Basin Area (sf) 1312 % Impervious 55% Required WQCV (cf) 11.7 Credits Pervious Paver Area (sf) 0 Grass Buffer Area (sf) 0 Tree Canopy Credit Area (sf) 104 No-infiltration Paver Vol. (cf) 13.47 Rain Garden Vol. (cf) 0 Results Effective Impervious Area (sf) 616 Effective % Imperviousness 47% Net WQCV (cf) -3.4 Available WQCV (cf) 15.1 4.0 Peak Flow Methodology Proposed drainage flow rates were determined using the rational method as explained in section 3.4 of the URMP and rainfall characteristics as explained in section 2 of the URMP. The rational method calculations for peak flow can be seen in Appendix D. The following tables list the parameters that were used, and the results determined for proposed conditions. Table 6 Watershed Characteristics Imperviousness Overland Flow Time (min) Channel Flow Time (min) Time of Concentration (min) Max Watershed Length (ft) Watershed Slope (ft/ft) C5 56.5% N/A N/A 8.40 100 0.026 0.46 Table 7 Proposed Conditions for 10-Year Storm C10 – Hydro Soil Group B I10 (in/hr) A - (acres) Contributing Area Q10 (cfs) 0.51 3.19 0.14 0.23 Table 8 Proposed Conditions for 100-Year Storm C100 – Hydro Soil Group B I100 (in/hr) A - (acres) Contributing Area Q100 (cfs) 0.69 5.09 0.14 0.48 For the calculation of proposed peak flows, the entire property was modeled as one catchment. This assumption is justified by the relatively small area of the property (the Rational Method is valid to 90 acres and this property is 0.14 acres). From Figure 3.1 of the 12/04/201810/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design 9 URMP, the soil can be classified as NRCS Hydrologic Soil Group B. The intensity for the 10- year and 100-year storm were determined using Equation 2-1 of the URMP. 5.0 Water Quality Methodology The Required WQCV (cf) for each basin on the property was estimated from Figure 8.13 of the URMP based on the basin imperviousness. Then WQCV credits were estimated based on the proposed areas for grass buffers, no-infiltration pervious pavers, and preserved tree canopy. Then the effective impervious area and effective imperviousness were computed, based on the instruction of section 8.4.1 in the URMP. From effective imperviousness, the net WQCV required to treat was estimated from Figure 8.13. If net effective imperviousness was less than zero, this meant that all Required WQCV (cf) was treated by grass buffer, pervious paver area, and grass buffer The Tree Canopy Credit was calculated following the recommendations in section 8.4.1 of the URMP. Detailed calculations for the Tree Canopy Credit can be found in Appendix C. In addition, a map showing the designated trees and their canopy areas is shown in Appendix B. Runoff from all impervious areas will be treated by directing the runoff over a grass buffer, no-infiltration pervious pavers, and a rain garden. All proposed runoff will leave the property as sheet flow and will flow over grass lawn located in the right of way before entering the curb and gutter system. 12/04/201810/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design 10 6.0 Maintenance 6.1 Grass Buffer Maintenance The following maintenance recommendations were found in the City of Aspen URMP. Mowing recommendations for grass buffers that are included in the Urban Drainage Flood Control District USDCM: Volume 3 Stormwater Quality are provided in the figure below. 12/04/201810/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design 11 6.2 Pervious Pavers The following maintenance recommendations were found in the Urban Drainage Flood Control District USDCM: Volume 3 Storm water Quality (page 6-15 to 6-17) and will be used as a guide for the maintenance of the proposed pervious pavers. An inspection of the condition and observation of infiltration should be completed annually. The pavers will lose infiltration capabilities over time and it is recommended to use ASTM C1707 Standard Test Method for Infiltration Rate of In Place Pervious Concrete to measure the infiltration rate of the pavers. A regenerative air or vacuumed sweeper should be used twice annually and after any significant site work, like landscaping, is done. However, the timing of vacuum sweeping is variable based on site conditions and biannual vacuuming may be more often than needed. Sand should never be applied to the pavers for snow removal as this will decrease the permeability of the pavers. The proposed pavers will have snowmelt capabilities, but if snow removal is necessary, mechanical snow removal should be done. If the surface of the paver system ever becomes completely clogged, remove and replacement of the first ½ to 1 inch of infill. The use of a push broom is recommended for the replacement of infill. 12/04/201810/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design 12 7.0 Conclusion The proposed BMPs (grass buffer, no-infiltration pervious pavers, and rain gardens) are expected to treat 100% of the required WQCV at the 533 W. Hallam Street project with room to spare. With proper maintenance and installation, these BMPs will meet the criteria outlined in the City of Aspen’s current Urban Runoff Management Plan. 12/04/201810/16/2019 Title: Basins & WQCV Re v i s i o n # Dwg No. Du n c a n S k i h a u s Ci t y o f A s p e n , C o l o r a d o Job No. Drawn by: Date: File: PE:QC: 2018-292.001 JB 10.30.2018 AE Dun-MajDrRep ---- 11 8 W e s t S i x t h S t r e e t , S u i t e 2 0 0 Gl e n w o o d S p r i n g s , C O 8 1 6 0 1 97 0 . 9 4 5 . 1 0 0 4 w w w . s g m - i n c . c o m Da t e By : Pr e l i m i n a r y N o t F o r C o n s t r u c t i o n Pr o j e c t M i l e s t o n e : APPENDIX A 2Of : Graphic Scale In Feet: 1" = 10' 0 5 10 20 12/04/2018 Show major Drainage Basins A, B, C and D on the Drainage Map. Each sub-basin should be labeled with its area and WQCV. Also show roof downspouts locations, and contours. Provide finished floor and grade at foundation elevations at all building corners or transitions. Also provide lot corner elevations and any grade break elevations critical to the grading concept. Hatching for no infiltration gravel is different in the legend than shown on the Drainage Map. What area drains to the raingarden? This drainage map show Basin 1 routed north and the underdrain from the gravel bed routed under the rain garden. 10/16/2019 12"18" 20" 10" 3" 2" 6" 18" 12" 12" 30" Title: Tree Canopy Credit Re v i s i o n # Dwg No. Du n c a n S k i h a u s Ci t y o f A s p e n , C o l o r a d o Job No. Drawn by: Date: File: PE:QC: 2018-292.001 JB 10.30.2018 AE Dun-MajDrRep ---- 11 8 W e s t S i x t h S t r e e t , S u i t e 2 0 0 Gl e n w o o d S p r i n g s , C O 8 1 6 0 1 97 0 . 9 4 5 . 1 0 0 4 w w w . s g m - i n c . c o m Da t e By : Pr e l i m i n a r y N o t F o r C o n s t r u c t i o n Pr o j e c t M i l e s t o n e : APPENDIX B 2Of : Graphic Scale In Feet: 1" = 10' 0 5 10 20 12/04/201810/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design Appendix Appendix C Water Quality Capture Volume Calculations Basin A % Then lookup Required WQCV from Figure 8.13, which is . ! " # and… $ % " &'() * .+ . ! , - . . ! , -/ 0 . 1 Now, find the effective impervious area (2 )… 345 46789:.598; < =988 >;?@7A >98BCD < E9;FF GHII89 598; < 2*K89:.K;:89 598;+ where… 46789:C@HF 598; 488 ID N E9;FF GHII89 598; 150 ID N K89:C@HF K;:89 598; 0 ID N and… =988 >;?@7A >98BCD 0.15 *R8SCBH@HF 598;+T 0.3 *>@?IC89@HF 598;+ where… R8SCBH@HF 598; 121 ID N >@?CI89@HF 598; 295 ID N so… 3II.467.598; 480 ID N < 0.15 *276 ID N +< 0.3 *295 ID N +< 150 ID N 3II.467.598; 230.93 ID N and… 3II.K89S8?D 46789:C@HF?8FF 17.0% Then lookup Required WQCV from Figure 8.13, which is . " # and… Y8D Z[>\ R87Dℎ 0.042 C?, 1 ID 12 C?- G;FC? 598; 0.042 C? ,1 ID 12 C?-*1356 ID N + 4.8 ID ^ Y@4?IC_D9;DC@? K89:.K;:89 \@_H68 598; B87Dℎ K89S8?D \@CB `7;S8 *0 ID N +*aC?.0.5 ID B87Dℎ+*33%+ 0 ID ^ b;C? E;9B8? \@_H68 6.50 ID ^ Finally… =98;D8B Z[>\ *Y8D Z[>\+<*Y@ < 4?IC_D9;DC@? K89:.K;:89 \@_.+< b;C? E;9B8? \@_. 4.8 ID ^< 0 ID ^< 6.5 ID ^ " &'() < .! Basin B 12/04/201810/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design Appendix 1 ! ! % Then lookup Required WQCV from Figure 8.13, which is . ! " # and… $ % " &'() * .+ . ! , - . . ! , -/ 0 . Now, find the effective impervious area (2 )… 345 46789:.598; < =988 >;?@7A >98BCD < E9;FF GHII89 598; < 2*K89:.K;:89 598;+ where… 46789:C@HF 598; 1921 ID N E9;FF GHII89 598; 0 ID N K89:C@HF K;:89 598; 0 ID N and… =988 >;?@7A >98BCD 0.15 *R8SCBH@HF 598;+T 0.3 *>@?IC89@HF 598;+ where… R8SCBH@HF 598; 28 ID N >@?CI89@HF 598; 0 ID N so… 3II.467.598; 1921 ID N < 0.15 *28 ID N +< 0.3 *0 ID N +< 0 ID N 3II.467.598; 1917 ID N and… 3II.K89S8?D 46789:C@HF?8FF 76% Then lookup Required WQCV from Figure 8.13, which is . ! " # and… Y8D Z[>\ R87Dℎ 0.157 C?, 1 ID 12 C?- G;FC? 598; 0.157 C? ,1 ID 12 C?-*2537 ID N + 33.2 ID ^ Y@4?IC_D9;DC@? K89:.K;:89 \@_H68 598; B87Dℎ K89S8?D \@CB `7;S8 *315 ID N +*0.5 ID B87Dℎ+*33%+ 52.0 ID ^ b;C? E;9B8? \@_H68 0 ID ^ Finally… =98;D8B Z[>\ *Y8D Z[>\+<*Y@ < 4?IC_D9;DC@? K89:.K;:89 \@_.+< b;C? E;9B8? \@_. 33.2 ID ^< 52.0 ID ^< 0 ID ^ " &'() < 1. 12/04/201810/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design Appendix Basin C 1 ! % Then lookup Required WQCV from Figure 8.13, which is . 1 " # and… $ % " &'() * .+ . 1 , - . . 1 , -/! 0 . Now, find the effective impervious area (2 )… 345 46789:.598; < =988 >;?@7A >98BCD < E9;FF GHII89 598; < 2*K89:.K;:89 598;+ where… 46789:C@HF 598; 259 ID N E9;FF GHII89 598; 0 ID N K89:C@HF K;:89 598; 0 ID N and… =988 >;?@7A >98BCD 0.15 *R8SCBH@HF 598;+T 0.3 *>@?IC89@HF 598;+ where… R8SCBH@HF 598; 23 ID N >@?CI89@HF 598; 257 ID N so… 3II.467.598; 756 ID N < 0.15*23 ID N +< 0.3*257 ID N +< 0 ID N 3II.467.598; 178 ID N and… 3II.K89S8?D 46789:C@HF?8FF 22% Then lookup Required WQCV from Figure 8.13, which is . 1 " # and… Y8D Z[>\ R87Dℎ 0.069 C?, 1 ID 12 C?- G;FC? 598; 0.069 C? ,1 ID 12 C?-*756 ID N + 3.4ID ^ Y@4?IC_D9;DC@? K89:.K;:89 \@_H68 598; B87Dℎ K89S8?D \@CB `7;S8 135 ID N *0.5 ID B87Dℎ+ *33%+ 22.57 ID ^ b;C? E;9B8? \@_H68 0 ID ^ Finally… =98;D8B Z[>\ *Y8D Z[>\+<*Y@ < 4?IC_D9;DC@? K89:.K;:89 \@_. +< b;C? E;9B8? \@_. 3.4 ID ^< 22.57 ID ^< 0 ID ^ " &'() < 1. 12/04/201810/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design Appendix Basin D ! % Then lookup Required WQCV from Figure 8.13, which is . ! " # and… $ % " &'() * .+ . ! , - . . ! , -/ 0 .! Now, find the effective impervious area (2 )… 345 46789:.598; < =988 >;?@7A >98BCD < E9;FF GHII89 598; < 2*K89:.K;:89 598;+ where… 46789:C@HF 598; 720 ID N E9;FF GHII89 598; 0 ID N K89:C@HF K;:89 598; 0 ID N and… =988 >;?@7A >98BCD 0.15 *R8SCBH@HF 598;+T 0.3 *>@?IC89@HF 598;+ where… R8SCBH@HF 598; 693 ID N >@?CI89@HF 598; 0 ID N so… 3II.467.598; 720 ID N < 0.15*0 ID N +< 0.3*693 ID N +< 0 ID N 3II.467.598; 616 ID N and… 3II.K89S8?D 46789:C@HF?8FF 47% Then lookup Required WQCV from Figure 8.13, which is . 1 " # and… Y8D Z[>\ R87Dℎ 0.0925 C?, 1 ID 12 C?- G;FC? 598; 0.0925 C? ,1 ID 12 C?-*756 ID N + 10.1 ID ^ Y@4?IC_D9;DC@? K89:.K;:89 \@_H68 598; B87Dℎ K89S8?D \@CB `7;S8 80.8 ID N *0.5 ID B87Dℎ+ *33%+ 13.47 ID ^ b;C? E;9B8? \@_H68 0 ID ^ Finally… =98;D8B Z[>\ *Y8D Z[>\+<*Y@ < 4?IC_D9;DC@? K89:.K;:89 \@_. +< b;C? E;9B8? \@_. 10.1 ID ^< 13.47 ID ^< 0 ID ^ " &'() < . 12/04/201810/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design Appendix Appendix D Peak Flow Calculations for Project Site – Proposed Conditions · Watershed Area, 5 . · Percent Imperviousness, C C 5cde5fgfhi 100 C 488 ID N T 1921 ID N T 259 ID N T 720 ID N 6000 ID N 100 . % · Maximum Watershed Length, jk l ,extent of property from South to North · Watershed Slope, `k `k 3_8:;DC@? ;D F@HDℎ 8?B < 3_8:;DC@? ;D ?@9Dℎ 8?B jk `k 7915.14 ID < 7912.54 ID 100 ID | . } · Runoff Coefficients, >~, >•k, & >•kk Expressions for the 5-, 10-, and 100-year storm return period runoff coefficients can be found in Table 6-4 in the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual (USDCM) >~ 0.86C k.^^ 0.4621 >•k 0.81C T 0.057 0.5147 >•kk 0.47C T 0.426 0.6916 · Computed Time of Concentration, =€ =€ =g T =• where… =g k.^‚~/•.•}ƒ„…†‡0 ˆ‡‡.‰‰ (Overland flow time, Equation 3-4 in COA URMP) =• †Š ‹kŒ…ˆŠ (Channelized flow time, Equation 3-5 in COA URMP) And since there’s no channelized flow, =• 0 so… =ƒ =g 0.395*1.1 < 0.4621+…100 ID *2.6 10 }N +k.^^ ( . · Design Time of Concentration, =• 12/04/2018 Use Figure 3.3 of the URMP as opposed to Urban Drainage Tables for runoff coefficients. 10/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design Appendix The design time of concentration, =•, is the lesser of the computed time of concentration, =€, and the regional time of concentration, =Ž , which is given by =Ž 10 T jk /180 10 T *100 ID/180+ 10.6 6C?HD8F so… " . · Peak Runoff for 10-year Storm Return Period, [•k [•k >•k 4•k 5 where >•k is the 10-year runoff coefficient, 4•k is the 10-year storm rainfall intensity (units of C?/ℎ9), and 5 is the watershed area in units of ;S98F 4•k ••.•‘’*•k“”•+’.‡„– (Equation 2-1 in COA URMP) and K• is the 1-hr precipitation intensity for a 10-year storm K• 0.77 C?/ℎ9 (Table 2.2 of the COA URMP) so… 4•k 88.8*0.77+ *10 T 8.4+•.k~N . 1 # then the 10-year peak runoff is given by.. [•k *0.5147+,3.19 C? ℎ9-*0.14 ;S98F+ ' . · Peak Runoff for 100-year Storm Return Period, [•kk [•kk >•kk4•k 05 where >•k is the 100-year runoff coefficient, 4•k is the 100-year storm rainfall intensity (units of C?/ℎ9 ), and 5 is the watershed area in units of ;S98F 4•kk ••.•‘’*•k“”•+’.‡„– (Equation 2-1 in COA URMP) and K• is the 1-hr precipitation intensity for a 100-year storm K• 1.23 C?/ℎ9 (Table 2.2 of the COA URMP) so… 4•kk 88.8*1.23+ *10 T 8.4 +•.k~N 12/04/201810/16/2019 533 W. Hallam Street, Aspen, Colorado November 28, 2018 Drainage Report for Major Design Appendix . # then the 100-year peak runoff is given by [•k *0.6916+,5.10 C? ℎ9-*0.14 ;S98F+ ' . 12/04/201810/16/2019