HomeMy WebLinkAboutSub Permit.404 S Galena St.0097.2019 (9).ARBKIndependence Unit 312 Scope
1.Remove existing kitchenette and install new (see photo of existing kitchenette below)
a.New microwave
b.New refrigerator
c.New sink, faucet with disposal
d.New induction mini cooktop (2 burners)
e.New cabinets
f.New countertop and backsplash
2.Install new tile in the sleeping area with new underlayment STC 50 or greater (see spec)
3.Paint throughout
4.2 new interior doors and hardware (replacing the slabs, not jambs or trim)
5.Removing faux stone behind the headboard
6.*retile bathroom floor and shower walls
7.*replace the shower door
8.*new bath vanity
Note: Minimal drywall removed less the amount to trigger an asbestos report. However testing
was done at the time of purchase. No asbestos was found.
* Due to water damage the owner had to fix the subfloor in the bathroom. Doing so the existing
bathtub was removed. Sink the tub was/is unique she is converting to shower
4/25/2019