HomeMy WebLinkAboutSub Permit.533 W Hallam St.0285.2018 (16).ARBK 12/2/24,4:08 PM 0058-2020-BCHO—Salesforce-Enterprise Edition • Close Window • Print This Page • Expand All I Collapse All 0058-2020-BCHO Number 0058-2020-BCHO Record Type Change Order Address 533 W HALLAM ST Owner Sydney Fallon Original Number 20-2042 Status Closed-Final Type Change Order Reason for Cancel or Comp!. Review Fail Applicant WILLIAM LEWIS Aspen Internal? No Account POSS ARCHITECTURE&PLANNING Required Bond Amount Project Total Available Bond Amount Land Use Planning Application Bluebeam Project Id 830-490-320 Master Building Permit 0285.2018.ARBK HPC-ZON-EH-UTIL Review HPC Rev, Permit Contractor HANSEN CONSTRUCTION INC HPC-ZON-EH-UTIL Review-2 Valid Business License on Eng Review Eng-CMP Rev,Eng-Dev Rev,Util-Dev Maj,Eng-ES Rev, Account Imported Parks-Prkng-San Review Parks Rev,Parks Fee,Water-LSE Rev, Required Submissions Conditional Inspections Documents Resubmitted Conditional Final Insp Approved Covid-19 Plan ./ Action Items Hold All Reviews Create Fees Hold Reason Create Fees 2 ,/ Conditional Flat Fee Formula FP, Price Book 2020 Conditional Tiered Fee Formula Applicant is a Nonprofit? No Conditional Tiered SqFt Fee MIR, Discount All Fees(%) Formula Fee Discount Reason Queue Score Project Designation Milestone Current Days in Applicant Hand Queue Designation Milestone Current Days in City Hands Queue Score 0 Milestone-Total Days in Applicant Hand Last Date Received from Milestone-Total Days in City Applicant Hands Dates New Application Date 8/5/2020 TCO Issuance Date Application Complete Date 8/12/2020 Close/CO Issuance Date 12/29/2022 Application Accepted Date 8/12/2020 Last Activity Date Issue Date 3/8/2021 Expiration Date Days to Issue 208 Due Date Override Expiration Date Basic Information Description Mechanical system has switched to a GeoThermal Census Code **Change Order system.One sick tree was removed at the request of the Parks Department allowing us to extend the patio by two rows of pavers where that drip line was located.snowmelt increased into this paver area also.One door on the new portion of the house changed from a full lite glass door to a dutch door.one light well got deeper to accommodate mechanical air intake.some internal structural changes were made to accommodate the mechanical systems. Use of Building Single Family Use Class Residential Class of Work Addition https://cityofaspen.my.salesforce.com/a033s00000vRtEJAAO/p 1/14 12/2/24,4:08 PM 0058-2020-BCHO-Salesforce-Enterprise Edition Permit Comments Parks comments: This will be acceptable.The City Forester/Parks Dept.will oversee filling in the dripline of the closest Spruce and direct adjustments as needed to reduce fill over the roots.Also,as a condition I will require trunk injections for 2 years of Bark Beetle protection for the two Spruces to the North. Job Location Address 533 W HALLAM ST,ASPEN:273512432001 Lot A Site Address Display on Map Legal Description Subdivision:CITY AND TOWNSITE OF ASPEN Block:29 Lot:AAND:-Lot:B Historic Property? Yes Eden Address Historic District? No HPC-Planning-Zoning Details Zone District R-6 HOA/Covenant Property Not Subject to HOA or Covenant Is There an ADU? No HPC Certificate of No Appropriateness? ADU Sq Ft Work Involves a Land Use Yes Approval? Deed Restricted? No Located in a PD? No #of Dwellings 1 Adds/Changes Floor Area? Category of Zoning Fee Residential Occupancy or Use Change? No Zoning Work Level Minor Zoning Fee Work Affects Exterior of Building? Building Project Details Valuation $200,000.00 Lot Size Sq.Ft. 6,666 Reason for Valuation Change The change to a GeoThermal system.Reviewed rjw Soil Disturbance Sq Ft 6,000 Unit Sq.Ft. 7,227 Affected Area Sq Ft 6,000 Building Footprint Sq Ft Existing Hardscape Footprint Sq 3,034 Ft Sq Ft of Building Work Area 7,227 Existing Hardscape%of Lot 46% Building Fire Area Sq Ft Con Mit Sq Ft Total 13,227 Utility Review Sq.Ft. 0 Utility Review Sq Ft Total 6,000 %of Interior being Altered 100% New Sq.Ft. 3,809 Scope of Work Details Work Changes Building Yes Work Affects Tree/Drip Line? Yes Footprint? Work Changes Yes Located Within City Mall No Fenestration/Thrml Envelop? Boundaries? Requires Asbestos Test? Yes Adjacent to City Open Space? No Photovoltaic Installation No Impacts City Trails/Parks? No Work Adds/Removes/Changes No Work Subject to Water Efficient No Plumbing Fixt? L.O.? Restaurant/Food Service No Involves Impact on Sewer? No Involved? Change of Restaurant No Prevents Access to Sewer No Ownership? Main? Affects Parking/Alleys/Loading? No Sewer Easements Affected? No Utility Water Details Already on City Water? Class of Service Customer Utility Account Number Water Service Area Water Service Agreement Is There Well or Wells on the Required? Property? Common Building Name Abandon Existing Well Abandon Existing Tap Acre-feet of Water Currently by Well Date of Existing Tap Acre-feet of Water Rights to be Conveyed Existing Tap Modifications? Existing ECU Count New Tap? If Residential App,Estimated New ECUs Date of New Tap Final ECU Count Does Project Involve Outdoor Size of Existing Domestic Water Irrigation? Line Irrigated Area Sq Ft Number of Meters Proposed https://cityofaspen.my.salesforce.com/a033s00000vRtEJAAO/p 2/14 12/2/24,4:08 PM 0058-2020-BCHO—Salesforce-Enterprise Edition Identify ALL Sources of Water Size of Existing Fire Suppression Line Is There a Pool,Spa or Water Size of Proposed Domestic Feature? Water Line Summary of Prior Water Fees Size of Proposed Fire Paid Suppression Line Building Description Code Editions Required Special Inspections High-Strength Bolting;Epoxy Anchors;Structural Steel Welding;Permanent Micropiles;Sprayed Fire-Resistants Other Code Editions Energy Code Compliance Building Type(IRC) One family Total Snowmelt Sq Ft Construction Type VB Total Spa Sq Ft Fire Sprinkler Existing? No Total Pool Sq Ft Fire Sprinkler Required? Yes Amount of Onsite Renewable Generation? Fire Sprinkler Type NFPA 13 D CO Description Fire Alarms Installed? NFPA 72 Basement #Wood Fireplaces 1st Floor #Gas Log Fireplaces 2nd Floor #Gas Appliances 3rd Floor Open Text Field For Comments Additional Financials Total Fees $23,999.32 Total Payments $23,999.32 Total Balance $0.00 System Information Number 0058-2020-BCHO Community Visibility v/ Created By WILLIAM LEWIS,8/5/2020 12:43 PM Contact IDs 0033s000010gCN5AAM,0034000001gieLOAAY,0036A00000uYCuwQAG,0038X00003ajlOmQAI Last Modified By Aspen Avocette,9/28/2024 1:57 AM VIP Form Tool VIP 8/5/2020 VIP Permit Application Submitted 2:01 PM Form Template VIP VIP [{"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvPUAS"), Foreign Template ("parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvNUAS"), Language Status {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000iWidUAE"), ("parentCategoryld":null,"isSu bmit":null,"isCurrent":n u I I,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvVUAS"), {"parentCategoryld":null,"isSu bmit":n u l I,"isCurrent":n u l I,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvKUAs"), {"parentCategoryld":null,"isSu bmit":n u ll,"isCurrent":n u l I,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvXUAS"), {"parentCategoryld":null,"isSu bmit":null,"isCurrent":nu II,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvaUAC"), {"parentCategoryld":null,"isSu bmit":null,"isCurrent":nu ll,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvZUAS"), {"parentCategoryld":null,"isSu bmit":true,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Ux1 dUAC")] Action Items View/Print Permit Link Attachment Activity History Email:COA Building Department Staff Changes Type Billable Assigned To AnnMarie Prince Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/2/2022 Days in Applicant's Hands Comments To:wlewis@billposs.com CC: BCC: Attachment:--none-- Subject:COA Building Department Staff Changes Body: Dear Salesforce Applicant, https://cityofaspen.my.Salesforce.com/a033s00000VRtEJAAO/p 3/14 12/2/24,4:08 PM 0058-2020-BCHO—Salesforce-Enterprise Edition The Building Department has had a change of staffing and would like to let you know that your Permit Owner for permit number 0058-2020-BCHO may have changed. Emmy Garrigus has moved to the position of Plans Examiner and is no longer the owner of many permits.Sydney Fallon is now taking on much of this role as the new Building Support Specialist. Please contact the appropriate owner for questions related to this specific permit (the owner is identified under the permit details.) Moving forward,please contact Sydney Fallon,Building Support Specialist I (970)309-5894 I buildingsupport@aspen.gov for the following: All new applications Schedule a pre-submittal meeting Permit application requirements or completeness review questions Help submitting responses to comments and change orders Please contact your reviewers directly for any questions regarding their comments. Reviewers can be viewed in Salesforce following the instructions here. And remember,Permit Status information is available 24/7 via the Salesforce Portal.For instructions click here. Thank you. **DO NOT REPLY TO THIS EMAIL** Email:Building Permit 0058-2020-BCHO-533 W HALLAM ST,ASPEN:273512432001-Issued Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/8/2021 Days in Applicant's Hands To:wlewis@billposs.com CC: BCC: Attachment:--none-- Subject:Building Permit 0058-2020-BCHO-533 W HALLAM ST,ASPEN:273512432001-Issued Body: Dear WILLIAM LEWIS, Please find attached your issued building permit 0058-2020-BCHO for 533 W HALLAM ST,ASPEN:273512432001 and City use tax exemption letter& Covid-19 site safety plan approval notice(if applicable) Below is a link to your plans and information regarding inspections.Please print these 24x36 in color and keep them on site at all times.As a reminder these drop box links do expire so please download the plans as soon as you get them. Comments https://www.dropbox.com/sh/1hotxyin2hweshq/AABfp4hcxM1Ktj7k0Tv2v3Mca?d1=0 If you have any questions please let us know. Kind regards, Lisa Guida City of Aspen Community Development Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning,and/or applicable building code regulations which is subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email:Permit Fees Due https://cityofaspen.my.salesforce.com/a033s00000vRtEJAAO/p 4/14 12/2/24,4:08 PM 0058-2020-BCHO—Salesforce-Enterprise Edition Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 2/23/2021 Days in Applicant's Hands To:wlewis@billposs.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due Body: If you have not already paid the fees due on your permit 0058-2020-BCHO,at 533 W HALLAM ST,ASPEN:273512432001,please log into the Aspen Permitting Portal to pay them.If you pay online,be aware that credit card or e-check transaction fees will apply. If you would like to pay by check,you can mail payments to the following locations: •Building and related permits:Community Development,130 S Galena St.,3rd Floor •Parking Reservation permits:Parking Department,130 S Galena St,1st Floor •Pitkin County Water Permit:Utility Billing.,130 S Galena,1st Floor Comments •ROW and encroachments:201 N Mill St.,Suite 203 •Tree permits:Parks Dept.,585 Cemetery Lane Aspen •Utility Connection Permits:Utility Billing.,130 S Galena,1st Floor •Electric Community Investment Fee:Utility Billing.,130 S Galena,1st Floor Current Amount Due:$23,999.32 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com/applicantportal and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees"under Permit Fees Due At section and then click Apply button.) Thank you! City of Aspen Email:Building Comments-0058-2020-BCHO-533 W HALLAM ST Type Billable Assigned To Justin Hahn Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/2/2020 Days in Applicant's Hands Comments To:wlewis@billposs.com CC:denis.murray@cityofaspen.com;lauren.litchet@cityofaspen.com BCC:justin.hahn@cityofaspen.com Attachment:0058-2020-BCHO_588 W Hallam_BuildingComment1.pdf Subject:Building Comments-0058-2020-BCHO-533 W HALLAM ST Body: Hello WILLIAM LEWIS, I've reviewed your permit application;please see the attached comment list.Please contact me directly if you have any questions on the comments. You may resubmit your responses online when you have received comments or approval from all applicable review agencies.Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses.Once you have uploaded you comments online,please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Address:533 W HALLAM ST Permit Number:0058-2020-BCHO Permit Coordinator:Lauren Litchet These design documents have been reviewed for conformance to the International Codes as adopted and amended by the City of Aspen.State and Federal regulations are administered where applicable.You can find a copy of all adopted codes,ordinances,and policies on our website. The attached corrections are required to be addressed.Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list.Indicate which detail or specification page shows the required information. Responses such as"will comply with code"are not adequate.Revised drawings must clearly show code compliance. Building plan check is only one part of the often complex process by which projects are reviewed for approval.These parts are interrelated and are sometimes conflicting.It is ultimately the applicant's responsibility to coordinate these requirements. Thank you, Justin Hahn Community Development Plans Examiner/Inspector II 130 S Galena St. Aspen,CO 81611 p 970.429.2784 c 970.319.1610 https://cityofaspen.my.salesforce.com/a033s00000vRtEJAAO/p 5/14 12/2/24,4:08 PM 0058-2020-BCHO—Salesforce-Enterprise Edition Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are based on current zoning and/or applicable building code regulations,are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contained in the email are based on current zoning,which is subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email:Engineering Comments-0058-2020-BCHO-533 W HALLAM ST Type Billable Assigned To Halley Roedel-On Maternity Leave-please chatter @Kyla Smits Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 8/14/2020 Days in Applicant's Hands To:wlewis@billposs.com CC:jordank@sgm-inc.com;hailey.guglielmo@cityofaspen.com BCC: Attachment:--none-- Subject:Engineering Comments-0058-2020-BCHO-533 W HALLAM ST Body: Hello WILLIAM LEWIS, I've reviewed your permit application;please see the attached comment list.Please contact me directly if you have any questions on the comments. You may resubmit your responses online when you have received comments or approval from all applicable review agencies.Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses.Once you have uploaded your comments online,please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Address:533 W HALLAM ST Permit Number:0058-2020-BCHO Permit Coordinator:Lauren Litchet Comments These design documents have been reviewed for conformance to the Engineering Design Standards and URMP as adopted and amended by the City of Aspen.State and Federal regulations are administered where applicable.You can find a copy of all adopted codes,ordinances,and policies on our website. The attached corrections are required to be addressed.Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list.Indicate which detail or specification page shows the required information. Responses such as"will comply with code"are not adequate.Revised drawings must clearly show code compliance. Engineering Review is only one part of the often complex process by which projects are reviewed for approval.These parts are interrelated and are sometimes conflicting.It is ultimately the applicant's responsibility to coordinate these requirements. Hailey Guglielmo,PE Project Manager Engineering Department 201 N Mill St.Ste 203 Aspen,CO 81611 p:970.309-0771 www.cityofaspen.com Email:City of Aspen-Application Status:Completeness Review Failed Type Billable Assigned To Lauren Litchet Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 8/11/2020 Days in Applicant's Hands Comments To:wlewis@billposs.com CC: BCC: Attachment:--none-- Subject:City of Aspen-Application Status:Completeness Review Failed Body: Dear WILLIAM LEWIS, Your Permit Application#20-2042 for 533 W HALLAM ST,ASPEN:273512432001 is in the"Completeness Review Failed"Status because of the following: William, I have reviewed your application for completeness.The following items need to be addressed prior to accepting your application: -Provide an updated RREMP worksheet that reflects your new snowmelted area. -Provide a detailed narrative of the changes taking place. Please upload these items to your application and notify me when you have done so.Once I have received these items,your application will be routed for review. Please contact Lauren Litchet with any questions at lauren.litchet@services.cityofaspen.com. https://cityofaspen.my.salesforce.com/a033s00000vRtEJAAO/p 6/14 12/2/24,4:08 PM 0058-2020-BCHO—Salesforce-Enterprise Edition Thank you, City of Aspen Lauren Litchet Permit Coordinator Community Development 130 S Galena St 3rd Floor Aspen,CO 81611 p 970.429.2020 Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning and/or applicable building code regulations,which is subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email:Your Building Permit Application Has Been Received...Here's What to Expect Type Billable Assigned To Lauren Litchet Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 8/6/2020 Days in Applicant's Hands Comments To:wlewis@billposs.com CC: BCC: Attachment:--none-- Subject:Your Building Permit Application Has Been Received...Here's What to Expect Body: Dear WILLIAM LEWIS: I have received your permit application.I will be your Permit Coordinator.The City of Aspen permit process works as follows: Completeness Review:I will be reviewing your permit application for completeness in the next 5 business days.I will follow up with you directly if I need any additional information. Submittal Fees:Once your permit is deemed complete,I will provide you with a list of all permit submittal fees that are due.Your permit will not be placed into our review queue until payment of all submittal fees is received. Permit Review:Your permit will be placed in our review queue on the date that the submittal fee payment is received.Each review agency triggered for the review will either approve the permit or issue comments that you are required to address prior to their approval.You can see the status of all reviews by going into your permit on the portal,clicking on'Related,'and scrolling down to'Reviews.' Comment Response:Once you have addressed all agency comments,both in writing and on your plans,you will resubmit all documents via the portal.Just go into your permit,scroll down to the bottom of the page,and use the'Add more'button.You must notify me when you have uploaded your files for me to know that you have resubmitted.You can use the portal's Chatter feature(see below). Issuance:Once all agencies have approved your permit,you will be notified that it is time to pay your permit issuance fees.Once you do so,your approved plans and permit documents will be sent to you electronically. Additional Important Information: Only after I perform a completeness review and submittal fees are paid will your permit be accepted into our system as a formal submission.At that time,it will be put into the permit work queue. I may need to meet with you—either in person,over the phone,or via a virtual meeting—before I can finish my completeness review to ensure that I have a full understanding of your project's scope. If you need to contact me about your permit,I encourage you to use the Chatter feature on your permit on the applicant portal.When you use Chatter, I get an email,but it also gets attached to the permit record in the back office.So,anyone looking at the permit can see the conversations.This will be very helpful if someone else needs to get involved with your permit.To use Chatter: Open your permit on the portal. In the'Share an update...'box,type @,then start typing my name.My name will appear.Just click on it then add your message. Please let me know if you have any questions. Regards, Lauren Litchet City of Aspen Community Development Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning,and/or applicable building code regulations which is subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. https://cityofaspen.my.salesforce.com/a033s00000vRtEJAAO/p 7/14 12/2/24,4:08 PM 0058-2020-BCHO—Salesforce-Enterprise Edition Lauren Litchet Permit Coordinator Community Development 130 S Galena St 3rd Floor Aspen,CO 81611 p 970.429.2020 Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning and/or applicable building code regulations,which is subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Permit Review Type Engineering Billable Assigned To Hailey Roedel-On Maternity Leave-please chatter @Kyla Smits Number of Hours 11.00 Total Cost $3,575.00 Fee Generated Date Start Date Completed Date 9/20/2021 Days in Applicant's Hands Comments Permit Review Type Building Billable ✓ Assigned To Justin Hahn Number of Hours 6.50 Total Cost $2,112.50 Fee Generated Date 2/22/2021 Start Date Completed Date 2/22/2021 Days in Applicant's Hands Comments Permit Review Type Building Billable Assigned To Justin Hahn Number of Hours 3.00 Total Cost $975.00 Fee Generated Date Start Date Completed Date 2/19/2021 Days in Applicant's Hands Comments Permit Review Type Engineering Billable Assigned To Hailey Roedel-On Maternity Leave-please chatter @Kyla Smits Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 1/21/2021 Days in Applicant's Hands Comments Permit Review Type Building Billable Assigned To Justin Hahn Number of Hours 3.00 Total Cost $975.00 Fee Generated Date Start Date Completed Date 11/2/2020 Days in Applicant's Hands Comments https://cityofaspen.my.salesforce.com/a033s00000vRtEJAAO/p 8/14 12/2/24,4:08 PM 0058-2020-BCHO—Salesforce-Enterprise Edition Permit Review Type Zoning Billable ✓ Assigned To Sophie Varga Number of Hours 1.00 Total Cost $325.00 Fee Generated Date 8/26/2020 Start Date Completed Date 8/25/2020 Days in Applicant's Hands Comments Contacts WILLIAM LEWIS Account POSS ARCHITECTURE&PLANNING Type Applicant Active Contractor License Count 0.00 Number 0029480 PAUL BONIN Account HANSEN CONSTRUCTION INC Type Contractor Active Contractor License Count 1.00 Number 0029481 BRIAN GARY Account Type Representative Active Contractor License Count 0.00 Number 0041982 Karl Kroner Account Type Architect Active Contractor License Count 0.00 Number 0049574 Fees 0051205 Type Change Order Fee Total $25.00 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0051206 Type GIS Fee Total $500.00 Waived/Refunded Arid $500.00 Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0052540 Type Zoning Hourly Fee Total $325.00 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0056270 Type REMP Fee Total $21,536.82 https://cityofaspen.my.salesforce.com/a033s00000vRtEJAAO/p 9/14 12/2/24,4:08 PM 0058-2020-BCHO—Salesforce-Enterprise Edition Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart / Paid in Full ✓ Fee Paid Date/Time 0056294 Type Building Hourly Review Fee Total $2,112.50 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time Files 0058-2020-BCHO_588 W Hallam_BuildingCommentl Engineering 1-533 W Hallam-0058.2020 Last Modified 11/2/2020 12:53 PM Last Modified 8/14/2020 3:43 PM Created By Justin Hahn Created By Hailey Roedel-On Maternity Leave-please chatter @Kyla Smits Permit Application 2020-08-05 20:01:15.pdf Last Modified 8/5/2020 2:01 PM Created By WILLIAM LEWIS Milestones Review Round 1 -0058-2020-BCHO Status Not Approved Due Date Created Date 8/12/2020 Review Round 2-0058-2020-BCHO Status Approved Due Date Created Date 11/16/2020 Payments PY-008084 Related To 0058-2020-BCHO Amount $23,999.32 Created Date 3/8/2021 Payment Source R-0007690 Receipt-Amount Remaining R-0007690:$0 Related Permits 0136-2021-FIRE Type Fire Address 533 W HALLAM ST Work Type New Status Closed-Final Applicant JOE HOSACK Issue Date 11/12/2021 Last Activity Date Reviews REV-016601 Milestone Review Round 2-0058-2020-BCHO Status Approved Type Building Due Date Completed Date 2/22/2021 9:03 AM Owner Alias JHahn On Hold Created Date 12/22/2020 REV-016602 Milestone Review Round 2-0058-2020-BCHO Status Approved Type Engineering Dev Due Date Completed Date 1/21/2021 9:50 AM Owner Alias HGugl https://cityofaspen.my.salesforce.com/a033s00000vRtEJAAO/p 10/14 12/2/24,4:08 PM 0058-2020-BCHO—Salesforce-Enterprise Edition On Hold Created Date 12/22/2020 REV-014464 Milestone Review Round 1-0058-2020-BCHO Status Approved with Conditions Type Parks Due Date Completed Date 9/25/2020 7:26 AM Owner Alias DRade On Hold Created Date 8/12/2020 REV-014466 Milestone Review Round 1-0058-2020-BCHO Status Approved Type HPC Due Date Completed Date 11/13/2020 3:14 PM Owner Alias syoon On Hold Created Date 8/12/2020 REV-014468 Milestone Review Round 1-0058-2020-BCHO Status Closed-Not Needed Type Fire Due Date Completed Date 10/30/2020 9:33 AM Owner Alias JHahn On Hold Created Date 8/12/2020 REV-014469 Milestone Review Round 1-0058-2020-BCHO Status Approved Type Zoning Due Date Completed Date 8/25/2020 12:45 PM Owner Alias SVarg On Hold Created Date 8/12/2020 REV-014470 Milestone Review Round 1-0058-2020-BCHO Status Closed-Re-Review Created Type Building Due Date Completed Date 11/2/2020 12:53 PM Owner Alias JHahn On Hold Created Date 8/12/2020 REV-014471 Milestone Review Round 1-0058-2020-BCHO Status Closed-Re-Review Created Type Engineering Dev Due Date Completed Date 8/14/2020 3:45 PM Owner Alias HGugl On Hold Created Date 8/12/2020 Submissions 0285.2018.ARBK_533 W HALLAM ARCHITECTURAL CO#1.pdf Actions Submission Date 8/5/2020 1:58 PM Status Required Description 0285.2018.ARBK_533 W HALLAM ELECTRICAL CD Set-072720.pdf Actions Submission Date 8/5/2020 1:58 PM https://cityofaspen.my.salesforce.com/a033s00000vRtEJAAO/p 11/14 12/2/24,4:08 PM 0058-2020-BCHO—Salesforce-Enterprise Edition Status Required Description 0285.2018.ARBK_533 W HALLAM GEOTHERMAL M110-M112.pdf Actions Submission Date 8/5/2020 1:58 PM Status Required Description 0285.2018.ARBK_533 W HALLAM MECHANICAL CD Set-080320.pdf Actions Submission Date 8/5/2020 1:58 PM Status Required Description 0285.2018.ARBK_533 W HALLAM STRUCTURAL 200626_Duncan Skihaus_Change Order 01_Sta Actions Submission Date 8/5/2020 1:58 PM Status Required Description 533 W HALLAM 0285_2018_ARBK PACKET-f.pdf Actions Submission Date 8/5/2020 1:58 PM Status Required Description Duncan Skihaus LLC_533 W Hallam_Asbestos Report+Lab Data&Certs.pdf Actions Submission Date 8/5/2020 1:58 PM Status Required Description 0285.2018.ARBK_533 W HALLAM CIVIL.pdf Actions Submission Date 8/7/2020 1:32 PM Status Required Description 2015 IECC REMP Calcuations Premit Response 081120.pdf Actions Submission Date 8/11/2020 4:29 PM Status Required Description Description of Work.pdf Actions Submission Date 8/11/2020 4:29 PM Status Required Description 10.Civil Drainage Memo_533 W Hallam_2020.12.pdf Actions Submission Date 12/2/2020 6:07 PM Status Required Description 10.RREMP Calculations_533 W Hallam_2020.12.pdf Actions Submission Date 12/2/2020 6:07 PM Status Required Description https://cityofaspen.my.salesforce.com/a033s00000vRtEJAAO/p 12/14 12/2/24,4:08 PM 0058-2020-BCHO—Salesforce-Enterprise Edition 0058-2020-BCHO_588 W Hallam_BuildingCommentl.pdf Actions Submission Date 12/2/2020 6:07 PM Status Required Description 90.Architectural_A410_533 W Hallam_2020.12.pdf Actions Submission Date 12/2/2020 6:07 PM Status Required Description 90.Mechanical Drawings_533 W Hallam_2020.12.pdf Actions Submission Date 12/2/2020 6:07 PM Status Required Description 90.Plumbing Drawings_533 W Hallam_2020.12.pdf Actions Submission Date 12/2/2020 6:07 PM Status Required Description 2015 IECC REMP Calcuations Premit Response 112320.xls Actions Submission Date 12/2/2020 6:07 PM Status Required Description 90.Structural Clarifications_533 W Hallam_2020.12.pdf Actions Submission Date 12/2/2020 6:07 PM Status Required Description 90.Architectural_A410_533 W Hallam_2020.12.pdf Actions Submission Date 12/2/2020 6:08 PM Status Required Description 0058-2020-BCHO_588 W Hallam_BuildingCommentl-AEC 20201203-Poss 12-4 Revised.pdf Actions Submission Date 12/4/2020 1:30 PM Status Required Description 90.ARCHITECTURAL CO#1.20200811.pdf Actions Submission Date 12/4/2020 1:30 PM Status Required Description 90.GEOTHERMAL CO#1.20200811.pdf Actions Submission Date 12/4/2020 1:30 PM Status Required Description 90.GEOTHERMAL CO#1.20210219.pdf Actions Submission Date 2/19/2021 2:59 PM https://cityofaspen.my.salesforce.com/a033s00000vRtEJAAO/p 13/14 12/2/24,4:08 PM 0058-2020-BCHO-Salesforce-Enterprise Edition Status Required Description Copyright©2000-2024 salesforce.com,inc.All rights reserved. https://cityofaspen.my.salesforce.com/a033s00000vRtEJAAO/p 14/14