Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Sub Permit.232 E Main St.0132.2018 (18).ACBK
Close WindowPrint This PageExpand All | Collapse All 0078-2020-BCHO Number 0078-2020-BCHO Record Type Change Order 232 E MAIN ST Owner Sydney Fallon Original Number 20-2809 Status Expired Type Change Order Reason for Cancel or Compl.Review Fail Applicant MIKE WARNES No MODIF ARCHITECTURE Required Bond Amount Project Land Use Planning Application Bluebeam Project Id 014-541-453 Master Building Permit 0132.2018.ACBK HPC-ZON-EH-UTIL Review HPC Rev,EH-Rcyl Rev, Permit Contractor CENTAUR CONSTRUCTION COMPANY INC HPC-ZON-EH-UTIL Review-2 Valid Business License onAccount Eng Review Eng-CMP Rev,Eng-Dev Rev,Util-Dev Maj,Eng-ES Rev,Util Rev,Eng-Wtr Rev, Imported Parks-Prkng-San Review Parks Rev,Parks Fee,Water-LSE Rev,Parking Rev,San Rev, Required Submissions Conditional Inspections Documents Resubmitted Conditional Final Insp Action Items Hold Reason Conditional Flat Fee Formula FP,2020 Conditional Tiered Fee Formula Applicant is a Nonprofit?No Conditional Tiered SqFt FeeFormula Discount All Fees (%) Fee Discount Reason Queue Score 0 Queue Designation Milestone Current Days in CityHands 0 Queue Score 0 Milestone - Total Days in ApplicantHand 2 Last Date Received from Applicant Milestone - Total Days in CityHands 55 Dates 10/9/2020 TCO Issuance Date 10/21/2020 Close/CO Issuance Date 10/21/2020 5/24/2021 5/24/2021 Expiration Date 215 Basic Information Description Additional Info: Sheet 1.0 - revised hydraulic calculations. Sheet 1.1 - updated domestic water entry detail. Sheet 2.0 - updated underground pipe routing for drywell, downspouts, and sanitary. Sheet 2.1 - revised roof drainage. Census Code ** Change Order Use of Building Commercial Use Class Commercial Class of Work New Job Location Address 232 E MAIN ST 101, ASPEN : 273707320008 Lot R Site Address Display on Map Legal Description Subdivision: CITY AND TOWNSITE OF ASPEN Block: 73 Lot: R AND:- Lot: S CONOCO Historic Property?No Address Aspen Internal? Account Total Available Bond Amount Approved Covid-19 Plan Hold All Reviews Create Fees Create Fees 2 Price Book Project Designation Milestone Current Days inApplicant Hand New Application Date Application Complete Date Application Accepted Date Last Activity Date Issue Date Days to Issue Due Date Override Expiration Date Permit Comments Eden Address 12/3/24, 3:02 PM 0078-2020-BCHO ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSciCAAS/p 1/14 Historic District?Yes HPC - Planning - Zoning Details Zone District MU HOA/Covenant HOA/Covenant Approval Not Required Is There an ADU?No HPC Certificate ofAppropriateness?Yes ADU Sq Ft Work Involves a Land UseApproval?Yes Deed Restricted?No Located in a PD?No # of Dwellings 0 Category of Zoning Fee Change Order Yes Zoning Work Level Building Project Details $0.00 6,666 Reason for Valuation Change 5,981 9,036 5,981 5,981 9,036 90% 15,017 0 5,981 100% 9,036 Scope of Work Details Work Changes Building Footprint?Yes Yes Yes Located Within City MallBoundaries?No Yes Adjacent to City Open Space?No Photovoltaic Installation No Impacts City Trails/Parks?No Yes Yes No Yes Change of Restaurant Ownership?No Prevents Access to Sewer Main?No Yes Sewer Easements Affected?No Utility Water Details Already on City Water? Class of Service Customer Water Service Area Water Service AgreementRequired? Is There Well or Wells on theProperty? Common Building Name Abandon Existing Well Abandon Existing Tap Date of Existing Tap Existing Tap Modifications? Existing ECU Count New Tap? Date of New Tap Final ECU Count Does Project Involve OutdoorIrrigation? Irrigated Area Sq Ft Number of Meters Proposed Is There a Pool, Spa or WaterFeature? Summary of Prior Water Fees Paid Building Description Code Editions 2015 IBC Required Special Inspections High-Strength Bolting; Structural Steel Welding; Sprayed Fire- Resistants Energy Code Compliance COMCheck UA Alternative Building Type (IRC) Total Snowmelt Sq Ft Construction Type VB Total Spa Sq Ft Fire Sprinkler Existing? Total Pool Sq Ft Fire Sprinkler Required?Yes Amount of Onsite RenewableGeneration? Adds/Changes Floor Area? Occupancy or Use Change? Work Affects Exterior of Building? Valuation Lot Size Sq. Ft. Soil Disturbance Sq Ft Unit Sq. Ft.Affected Area Sq Ft Building Footprint Sq Ft Existing Hardscape Footprint SqFt Sq Ft of Building Work Area Existing Hardscape % of Lot Building Fire Area Sq Ft Con Mit Sq Ft Total Utility Review Sq. Ft.Utility Review Sq Ft Total % of Interior being Altered New Sq. Ft. Work Affects Tree/Drip Line? Work Changes Fenestration/ThrmlEnvelop? Requires Asbestos Test? Work Adds/Removes/ChangesPlumbing Fixt?Work Subject to Water EfficientL.O.? Restaurant/Food ServiceInvolved?Involves Impact on Sewer? Affects Parking/Alleys/Loading? Utility Account Number Acre-feet of Water Currently byWell Acre-feet of Water Rights to beConveyed If Residential App, Estimated NewECUs Size of Existing Domestic WaterLine Identify ALL Sources of Water Size of Existing Fire SuppressionLine Size of Proposed Domestic WaterLine Size of Proposed Fire SuppressionLine Other Code Editions 12/3/24, 3:02 PM 0078-2020-BCHO ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSciCAAS/p 2/14 Fire Sprinkler Type NFPA 13 CO Description Fire Alarms Installed?NFPA 72 Basement # Wood Fireplaces 1st Floor Two empty tenant white box spaces (A and B), mechanical room, trash room # Gas Log Fireplaces 2nd Floor Tenant B white box space, roof deck # Gas Appliances 3rd Floor Open Text Field For Comments CLT core and shell building. Tenant finishes to come on laterpermits Additional Financials $9,912.50 Total Payments $9,912.50 Total Balance $0.00 System Information Number 0078-2020-BCHO CommunityVisibility CreatedBy MIKEWARNES, 10/9/2020 9:40 AM 0033s000011PraHAAS,0036A00000sd3teQAA,0036A00000ZPoCGQA1,0036A00000scyhlQAA,0033s000013htSDAAY,0033s0000107YuZAAU,0033s000010e9HpAAI LastModifiedBy Aspen Avocette, 9/28/2024 1:34 AM VIP Form Tool VIPSubmitted 10/9/202012:58 PM VIP FormTemplate Permit Application VIP ForeignLanguage VIPTemplateStatus [{"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvPUAS"},{"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvNUAS"},{"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000iWidUAE"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvVUAS"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvKUAS"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvXUAS"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvaUAC"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvZUAS"}, {"parentCategoryId":null,"isSubmit":true,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000Ux1dUAC"}] Action Items View/Print Permit Link Attachment Activity History Email: Building Permit 0078-2020-BCHO - 232 E MAIN ST, ASPEN : 273707320008 - Issued Type Billable Assigned To Renee Espinoza Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 5/24/2021 Days in Applicant's Hands Comments To: michael.warnes@modifarchitecture.com CC: BCC: Attachment: --none-- Subject: Building Permit 0078-2020-BCHO - 232 E MAIN ST, ASPEN : 273707320008 - IssuedBody:Dear MIKE WARNES, Below is a link to your plans and information regarding inspections. Please print these 24x36 in color and keep them on site at all times. As a reminder these drop box links do expire so please download the plans as soon as you get them. https://www.dropbox.com/sh/e1emplhna45fnxd/AACSyc8zOWagBd5ikt7Otb6Na?dl=0 If you have any questions please let us know. Kind regards, John BarkerCity of AspenCommunity Development Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosurepursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contain in the email are based on current zoning, and/or applicable building code regulations which is subject to change in the future, and upon factual representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email: Permit Fees Due Total Fees ContactIDs 12/3/24, 3:02 PM 0078-2020-BCHO ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSciCAAS/p 3/14 Type Billable Assigned To Renee Espinoza Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 5/14/2021 Days in Applicant's Hands Comments To: michael.warnes@modifarchitecture.com CC: BCC: Attachment: --none-- Subject: Permit Fees DueBody:If you have not already paid the fees due on your permit 0078-2020-BCHO, at 232 E MAIN ST, ASPEN : 273707320008 , please log into the Aspen Permitting Portalto pay them. If you pay online, be aware that credit card or e-check transaction fees will apply. If you would like to pay by check, you can mail payments to the following locations: • Building and related permits: Community Development, 130 S Galena St., 3rd Floor • Parking Reservation permits: Parking Department, 130 S Galena St, 1st Floor • Pitkin County Water Permit: Utility Billing., 130 S Galena, 1st Floor • ROW and encroachments: 201 N Mill St., Suite 203 • Tree permits: Parks Dept., 585 Cemetery Lane Aspen • Utility Connection Permits: Utility Billing., 130 S Galena, 1st Floor • Electric Community Investment Fee: Utility Billing., 130 S Galena, 1st Floor Current Amount Due: $9,912.50 Instructions to see detail of fees due:- Log in to the Portal here: https://cityofaspen.force.com/applicantportal and click on Permits menu- Open the permit by clicking on the permit number link - Click on the Related tab (next to Details tab) and scroll down to Fees section - If all fees are not visible, click the “View All” link - To filter fees, click on the black funnel icon at the top right. (Example: to only see the fees due at permit submission, select “Complete Pending Submittal Fees” under Permit Fees Due At section and then click Apply button.) Thank you! City of Aspen Email: Building Comments - 0078-2020-BCHO - 232 E MAIN ST Type Billable Assigned To Nick Thompson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/4/2021 Days in Applicant's Hands Comments To: michael.warnes@modifarchitecture.comCC: denis.murray@cityofaspen.com; john.barker@cityofaspen.comBCC:Attachment: 0078-2020-BCHO_BuildingComments_2.pdf Subject: Building Comments - 0078-2020-BCHO - 232 E MAIN STBody:Hello MIKE WARNES, I’ve reviewed your responses; please see the attached comment list. Please contact me directly if you have any questions on the comments. You may resubmit your responses online when you have received comments or approval from all applicable review agencies. Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses. Once you have uploaded you comments online, please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Address: 232 E MAIN ST Permit Number: 0078-2020-BCHOPermit Coordinator: John Barker These design documents have been reviewed for conformance to the International Codes as adopted and amended by the City of Aspen. State and Federalregulations are administered where applicable. You can find a copy of all adopted codes, ordinances, and policies on our website. The attached corrections are required to be addressed. Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list. Indicate which detail or specification page shows the required information. Responses such as “will comply with code” are not adequate. Revised drawings must clearly show code compliance. Building plan check is only one part of the often complex process by which projects are reviewed for approval. These parts are interrelated and are sometimes conflicting. It is ultimately the applicant’s responsibility to coordinate these requirements. Nick Thompson Plans Examiner Community Development 130 S Galena St.Aspen, CO 81611 p: 970.429.2757c: 970.456.5165 www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contain in the email are based on current zoning and/or applicable building code regulations which are subject to change in the future, and upon factual 12/3/24, 3:02 PM 0078-2020-BCHO ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSciCAAS/p 4/14 representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimentalreliance. Email: Building Comments - 0078-2020-BCHO - 232 E MAIN ST Type Billable Assigned To Nick Thompson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/13/2021 Days in Applicant's Hands Comments To: michael.warnes@modifarchitecture.comCC: denis.murray@cityofaspen.com; john.barker@cityofaspen.comBCC:Attachment: 0078-2020-BCHO_BuildingComments_1.pdf Subject: Building Comments - 0078-2020-BCHO - 232 E MAIN ST Body: Hello MIKE WARNES, I’ve reviewed your permit application; please see the attached comment list. Please contact me directly if you have any questions on the comments. You may resubmit your responses online when you have received comments or approval from all applicable review agencies. Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses. Once you have uploaded you comments online, please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Address: 232 E MAIN STPermit Number: 0078-2020-BCHOPermit Coordinator: John Barker These design documents have been reviewed for conformance to the International Codes as adopted and amended by the City of Aspen. State and Federalregulations are administered where applicable. You can find a copy of all adopted codes, ordinances, and policies on our website. The attached corrections are required to be addressed. Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list. Indicate which detail or specification page shows the required information. Responses such as “will comply with code” are not adequate. Revised drawings must clearly show code compliance. Building plan check is only one part of the often complex process by which projects are reviewed for approval. These parts are interrelated and are sometimes conflicting. It is ultimately the applicant’s responsibility to coordinate these requirements. Nick ThompsonPlans ExaminerCommunity Development 130 S Galena St.Aspen, CO 81611 p: 970.429.2757 c: 970.456.5165 www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinionscontain in the email are based on current zoning and/or applicable building code regulations which are subject to change in the future, and upon factualrepresentations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimentalreliance. Email: Building Comments - 0078-2020-BCHO - 232 E MAIN ST Type Billable Assigned To Nick Thompson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/6/2020 Days in Applicant's Hands Comments To: michael.warnes@modifarchitecture.comCC: denis.murray@cifyofaspen.com; john.barker@cityofaspen.comBCC: Attachment: --none-- Subject: Building Comments - 0078-2020-BCHO - 232 E MAIN ST Body: Hello MIKE WARNES, I've taken a quick look at your proposed changes submitted as additional information. The scope appears to be great enough that this will be considered as a change order. Please provide the following for a full review: 1. Updated architectural set with all changes clouded to revise the design to work with the new mass timber design. 2. Cloud all changes in the new plumbing set. 3. Provide updated and clouded sheets for any other sets that have changed. 4. Consider working with Engineering and John to provide an updated design in reaction to the new slab elevation. If you have any questions, please contact myself, John, or Denis. thank you, Nick Thompson 12/3/24, 3:02 PM 0078-2020-BCHO ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSciCAAS/p 5/14 Address: 232 E MAIN STPermit Number: 0078-2020-BCHOPermit Coordinator: John Barker Nick ThompsonPlans ExaminerCommunity Development 130 S Galena St. Aspen, CO 81611 p: 970.429.2757 c: 970.456.5165 www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer:This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosurepursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinionscontain in the email are based on current zoning and/or applicable building code regulations which are subject to change in the future, and upon factualrepresentations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Permit Review Type Building Billable Assigned To Nick Thompson Number of Hours 30.00 Total Cost $9,750.00 Fee Generated Date 5/14/2021 Start Date Completed Date 5/13/2021 Days in Applicant's Hands Comments Permit Review Type Zoning Billable Assigned To Jim Pomeroy Number of Hours 0.50 Total Cost $162.50 Fee Generated Date 11/13/2020 Start Date Completed Date 11/12/2020 Days in Applicant's Hands Comments Contacts Linda Manning Account M DEVELOPMENT Type Owner Active Contractor License Count 0.00 Number 0031486 MIKE WARNES Account MODIF ARCHITECTURE Type Applicant Active Contractor License Count 0.00 Number 0031480 BRAD HRIBAR Account CENTAUR CONSTRUCTION COMPANY INC Type Contractor Active Contractor License Count 0.00 Number 0031481 ROB AVILA Account MODIF ARCHITECTURE Type Architect Active Contractor License Count 0.00 Number 0031482 MARTIN RUBIO Account CENTAUR CONSTRUCTION COMPANY INC Type Contractor Active Contractor License Count 0.00 Number 0031485 LUCIANA TESCARI Account CENTAUR CONSTRUCTION COMPANY INC Type Contractor Active Contractor License Count 0.00 Number 0031483 12/3/24, 3:02 PM 0078-2020-BCHO ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSciCAAS/p 6/14 RYAN SUTTON Account CENTAUR CONSTRUCTION COMPANY INC Type Contractor Active Contractor License Count 0.00 Number 0031484 Fees 0054475 Type Zoning Hourly Fee Total $162.50 Waived/Refunded Amt Discount $ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart Paid in Full Fee Paid Date/Time 0059767 Type Building Hourly Review Fee Total $9,750.00 Waived/Refunded Amt Discount $ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart Paid in Full Fee Paid Date/Time Files 0078-2020-BCHO_BuildingComments_2 Last Modified 3/4/2021 4:47 PM Created By Nick Thompson Permit Application 2020-10-09 18:58:43.pdf Last Modified 10/9/2020 12:58 PM Created By MIKE WARNES 0078-2020-BCHO_BuildingComments_1 Last Modified 1/13/2021 3:48 PM Created By Nick Thompson Inspections INS-0004198-21 Status Pending Type Building & Referral Inspection Status Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE Milestones Review Round 1 - 0078-2020-BCHO Status Not Approved Due Date Created Date 10/21/2020 Review Round 2 - 0078-2020-BCHO Status Not Approved Due Date Created Date 3/1/2021 Review Round 3 - 0078-2020-BCHO Status Approved Due Date Created Date 5/6/2021 Payments PY-009037 Related To 0078-2020-BCHO Amount $9,912.50 Created Date 5/24/2021 Payment Source R-0008615 Receipt - Amount Remaining R-0008615: $0 Reviews REV-018562 Milestone Review Round 3 - 0078-2020-BCHO Status Approved Type Building Due Date 12/3/24, 3:02 PM 0078-2020-BCHO ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSciCAAS/p 7/14 Completed Date 5/12/2021 1:41 PM Owner Alias NThom On Hold Created Date 5/6/2021 REV-017410 Milestone Review Round 2 - 0078-2020-BCHO Status Closed - Re-Review Created Type Building Due Date Completed Date 3/4/2021 4:48 PM Owner Alias NThom On Hold Created Date 3/1/2021 REV-017411 Milestone Review Round 2 - 0078-2020-BCHO Status Approved Type Engineering Dev Due Date Completed Date 3/1/2021 2:53 PM Owner Alias Engineering Dev - Review On Hold Created Date 3/1/2021 REV-015763 Milestone Review Round 1 - 0078-2020-BCHO Status Closed - Re-Review Created Type Building Due Date Completed Date 1/13/2021 3:45 PM Owner Alias NThom On Hold Created Date 10/21/2020 REV-016038 Milestone Review Round 1 - 0078-2020-BCHO Status Closed - Re-Review Created Type Engineering Dev Due Date Completed Date 12/21/2020 2:34 PM Owner Alias JDann On Hold Created Date 11/9/2020 REV-016039 Milestone Review Round 1 - 0078-2020-BCHO Status Approved Type Zoning Due Date Completed Date 11/12/2020 10:08 AM Owner Alias JPome On Hold Created Date 11/9/2020 REV-016116 Milestone Review Round 1 - 0078-2020-BCHO Status Approved Type HPC Due Date Completed Date 2/3/2021 6:47 PM Owner Alias ASimo On Hold Created Date 11/12/2020 Submissions 90.Plumbing Plans.20201009.pdf Actions Submission Date 10/9/2020 10:35 AM Status Required Description 90.Plumbing Plans.20201009.pdf Actions Submission Date 10/9/2020 12:56 PM Status Required Description 12/3/24, 3:02 PM 0078-2020-BCHO ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSciCAAS/p 8/14 90.Architectural Plans.20201106.pdf Actions Submission Date 11/11/2020 10:04 AM Status Required Description 90.Civil Plans.20201103.pdf Actions Submission Date 11/11/2020 10:05 AM Status Required Description 90.Electrical Plans.20201109.pdf Actions Submission Date 11/11/2020 10:05 AM Status Required Description 90.Irrigation Plans.20201105.pdf Actions Submission Date 11/11/2020 10:05 AM Status Required Description 90.Landscape Plans.20201105.pdf Actions Submission Date 11/11/2020 10:06 AM Status Required Description 90.Mechanical Plans.20201110.pdf Actions Submission Date 11/11/2020 10:06 AM Status Required Description 90.Plumbing Plans.20201110.pdf Actions Submission Date 11/11/2020 10:07 AM Status Required Description 90.Structural Plans.20201026.pdf Actions Submission Date 11/11/2020 10:07 AM Status Required Description 30.Change Order Summary.20201103.pdf Actions Submission Date 11/11/2020 10:07 AM Status Required Description 30.Building Round 1 Comments.20210209.pdf Actions Submission Date 2/10/2021 12:47 PM Status Required Description 30.Envelope ComCheck.20210209.pdf Actions Submission Date 2/10/2021 12:47 PM Status Required Description 30.Mechanical ComCheck.20210209.pdf 12/3/24, 3:02 PM 0078-2020-BCHO ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSciCAAS/p 9/14 Actions Submission Date 2/10/2021 12:47 PM Status Required Description 30.Structural Calculations.20210209.pdf Actions Submission Date 2/10/2021 12:48 PM Status Required Description 30.Structural Comments.20210209.pdf Actions Submission Date 2/10/2021 12:48 PM Status Required Description 30.Structural Compliance.20210203.pdf Actions Submission Date 2/10/2021 12:48 PM Status Required Description 30.Structural Verification Letter.20200910.pdf Actions Submission Date 2/10/2021 12:49 PM Status Required Description 90.Architectural Plans.20210209.pdf Actions Submission Date 2/10/2021 12:49 PM Status Required Description 90.Electrical Plans.20210209.pdf Actions Submission Date 2/10/2021 12:49 PM Status Required Description 90.Mechanical Plans.20210209.pdf Actions Submission Date 2/10/2021 12:50 PM Status Required Description 90.Plumbing Plans.20210209.pdf Actions Submission Date 2/10/2021 12:50 PM Status Required Description 90.Structural Details.20210209.pdf Actions Submission Date 2/10/2021 12:50 PM Status Required Description 90.Structural Notes.20210209.pdf Actions Submission Date 2/10/2021 12:50 PM Status Required Description 30.Building Comments Round 2 Responses.20210310.pdf Actions 12/3/24, 3:02 PM 0078-2020-BCHO ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSciCAAS/p 10/14 Submission Date 3/10/2021 2:56 PM Status Required Description 30.Building Envelope ComCheck.20210310.pdf Actions Submission Date 3/10/2021 2:57 PM Status Required Description 30.CLT Fire Rating.20210310.pdf Actions Submission Date 3/10/2021 2:58 PM Status Required Description 30.Exterior Lighting ComCheck.20210310.pdf Actions Submission Date 3/10/2021 2:58 PM Status Required Description 30.Mechanical ComCheck.20210310.pdf Actions Submission Date 3/10/2021 2:58 PM Status Required Description 90.Architectural Plans.20210310.pdf Actions Submission Date 3/10/2021 2:59 PM Status Required Description 90.Electrical Plans.20210310.pdf Actions Submission Date 3/10/2021 2:59 PM Status Required Description 90.Mechanical Plans.20210310.pdf Actions Submission Date 3/10/2021 3:00 PM Status Required Description 30.Building Envelope ComCheck.20210318.pdf Actions Submission Date 3/26/2021 9:43 AM Status Required Description 30.CLT Fire Rating.20210317.pdf Actions Submission Date 3/26/2021 9:43 AM Status Required Description 30.Round 2 Permit Responses.20210326.pdf Actions Submission Date 3/26/2021 9:44 AM Status Required Description 30.Steel Connection Fire Rating.20210317.pdf Actions Submission Date 3/26/2021 9:45 AM 12/3/24, 3:02 PM 0078-2020-BCHO ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSciCAAS/p 11/14 Status Required Description 30.Wall Roof Assembly Calculations.20210318.pdf Actions Submission Date 3/26/2021 9:46 AM Status Required Description 90.Architectural Plans.20210326.pdf Actions Submission Date 3/26/2021 9:47 AM Status Required Description 90.Mechanical Plans.20210326.pdf Actions Submission Date 3/26/2021 9:48 AM Status Required Description 90.Structural Plans_As-Builts.20210322.pdf Actions Upload Submission Date Status Required Description 90.Structural Plans_As-Builts.20210322.pdf Actions Submission Date 3/26/2021 9:50 AM Status Required Description 30.Exterior Lighting ComCheck.20210406.pdf Actions Submission Date 4/6/2021 1:20 PM Status Required Description 30.Mechanical ComCheck.20210406.pdf Actions Submission Date 4/6/2021 1:20 PM Status Required Description 90.Electrical Plans.20210406.pdf Actions Submission Date 4/6/2021 1:21 PM Status Required Description 90.Architectural Plans.20210413.pdf Actions Submission Date 4/13/2021 3:03 PM Status Required Description 30.Column Fire Rating.20210409.pdf Actions Submission Date 4/13/2021 3:03 PM Status Required Description 30.Intumescent Paint Calculations.20210413.pdf Actions Submission Date 4/13/2021 3:04 PM Status 12/3/24, 3:02 PM 0078-2020-BCHO ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSciCAAS/p 12/14 Required Description 30.Fire Resistance Ratings UL 263.20210413.pdf Actions Submission Date 4/13/2021 3:04 PM Status Required Description 90.Structural Plans_As-Builts.20210409.pdf Actions Submission Date 4/13/2021 3:05 PM Status Required Description 30.Round 2 Permit Responses.20210413.pdf Actions Submission Date 4/13/2021 3:05 PM Status Required Description 90.Architectural Plans.20210414.pdf Actions Upload Submission Date Status Required Description 90.Architectural Plans.20210414.pdf Actions Submission Date 4/14/2021 7:51 AM Status Required Description 30.Intumescent Paint Calculations.20210414.pdf Actions Submission Date 4/14/2021 7:52 AM Status Required Description 90.Structural Plans_As-Builts.20210504.pdf Actions Upload Submission Date Status Required Description 90.Structural Plans_As-Builts.20210504.pdf Actions Upload Submission Date Status Required Description 90.Structural Plans_As-Builts.20210504.pdf Actions Upload Submission Date Status Required Description 90.Structural Plans.20210429.pdf Actions Upload Submission Date Status Required Description 90.Structural Plans.20210429.pdf Actions Upload Submission Date Status Required 12/3/24, 3:02 PM 0078-2020-BCHO ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSciCAAS/p 13/14 Description 90.Structural Plans.20210429.pdf Actions Upload Submission Date Status Required Description TREE PLANTING STANDARDS DETAIL-8.5X11.pdf Actions Upload Submission Date Status Required Description Copyright © 2000-2024 salesforce.com, inc. All rights reserved. 12/3/24, 3:02 PM 0078-2020-BCHO ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSciCAAS/p 14/14