HomeMy WebLinkAboutFile Documents.533 W Hallam St.0285.2018 (87).ARBK0285-2018-ARBK_BuildingComment2
Subject: PlanCheck
Page: A801 ASSEMBLIES -FLOOR
Author: justinh
Color:
File Name: Architectural - Comment Response Drawings.pdf
If this is to be a pervious paver
snowmelt system then you will
need to drill holes through the
rigid insulation in order for it to
actually drain. If you are doing
that then you must detail a hole
pattern and call out the
insulation thickness so that you
still achieve a R10 weighted
average with the holes in the
insulation. This also applies to
detail 11/A811.
Discussion regarding this not
being applicable only applied to
the snowmelt systems over the
basement where it wasn't
actually a true pervious system
and we relied on the roof
insulation to meet the R10
requirement.
Architectural - Comment Response Drawings.pdf (6)
Subject: PlanCheck
Page: A802 ASSEMBLIES -EXTERIOR WALL
Author: justinh
Color:
File Name: Architectural - Comment Response Drawings.pdf
Providing the visqueen vapor
barrier on the outside of the
existing historic wall assemblies
with painted gypsum board on
the interior will most likely trap
moisture within the wall
assembly because the wall
cannot dry in either direction
now (latex paint on gypsum
board creates another vapor
barrier on the interior side). I
cannot require it to be removed,
but we do suggest it. I apologize
if my original comment confused
the issue. I wasn't trying to state
that you had to provide
waterproofing or a vapor barrier
behind the existing historic
siding, I just wanted the detail to
be accurate to what you're
actually able to do given the
historic restrictions on that
structure.
Subject: PlanCheck
Page: A802 ASSEMBLIES -EXTERIOR WALL
Author: justinh
Color:
File Name: Architectural - Comment Response Drawings.pdf
The new walls need to meet
current energy code
requirements, regardless of
whether they are being sided to
match existing historic siding.
The existing building code
exceptions do not apply to newly
constructed walls. Revise to
provide compliant insulation as
you show in W-9.
INTERIOR
CEILING FINISH
REF. INTERIOR FINISH SCHEDULE
CEILING HEIGHT, REF. REFLECTED CEILING PLANS
3/4" WOOD FLOORING,
REF. INTERIOR FINISH
SCHEDULE
GYPCRETE 1 1/2" MIN.
FLOOR FRAMING
REF. STRUCTURAL
T.O.FIN
RADIANT HEAT SYSTEM
REF. MECHANICAL
INTERIOR
SHEATHING
REF. STRUCTURAL
1/8" SOUND MAT & ADHESIVE
5/8" GYPSUM BOARD
(TYPE "X" GWB @ GARAGE )
T.O.SHTHGREF. PLAN
3"
5/8" SHEATHING
VARIES BLOW - IN SOUND ATTENUATION
INSULATION
2X UNDER FRAMING
SOUND BATT INSULATION
INTERIOR
CEILING FINISH
REF. INTERIOR FINISH SCHEDULE
CEILING HEIGHT, REF. REFLECTED
CEILING PLANS
MORTAR BED
T.O.FIN
INTERIOR
GYPCRETE 1 1/2" MIN.
SHEATHING
REF. STRUCTURAL
NOTE: REFER TO TCNA GUIDELINESFOR TILE INSTALLATION
RADIANT HEAT SYSTEMREF. MECHANICAL
FLOOR FRAMING
REF. STRUCTURAL
UNCOUPLING MEMBRANE
5/8" GYPSUM BOARD (TYPE "X"
GWB @ LOWER LEVEL FLOOR)
T.O.SHTHG
REF. PLAN
3"
VARIES
BLOW - IN SOUND ATTENUATION
INSULATION
2X UNDER FRAMING
SOUND BATT INSULATION
T.O. FINREF. PLAN
PATIO
ENGINEERED FILL
GRAVEL
CONCRETE PAVERS
TO MATCH APPROVED SAMPLE
COMPACTED SAND
RADIANT TUBING
FILTER FABRIC -
HYDRODRAIN AL
RIGID INSULATION
R-10 MIN.
4"
MIN.
4"
3"
1/4"
2"
2"
10/
8
/
2
0
1
9
3
:
3
4
:
1
6
P
M
SCALE 1 1/2" = 1'-0"F-7 WOOD FLOOR @ MAIN LEVEL
SCALE 1 1/2" = 1'-0"F-8 STONE TILE FLOOR @ MAIN LEVEL
SCALE 1 1/2" = 1'-0"F-10 PATIO PAVERS @ GRADE
If this is to be a pervious paver snowmelt
system then you will need to drill holes
through the rigid insulation in order for it to
actually drain. If you are doing that then
you must detail a hole pattern and call out
the insulation thickness so that you still
achieve a R10 weighted average with the
holes in the insulation. This also applies to
detail 11/A811.
Discussion regarding this not being
applicable only applied to the snowmelt
systems over the basement where it wasn't
actually a true pervious system and we
relied on the roof insulation to meet the R10
requirement.
COMPOSITE METAL PANEL PER MFR.
INTERIOR EXTERIORPER PLAN 1 5/8"1 1/2"
3 1/8"
LE
INTERIOR FINISH
REF. INTERIOR FINISH SCHED
WEATHER RESISTIVE
BARRIER
DRAINAGE MAT
SPRAYED FOAM INSULATION(R-20 MIN.)
2X WOOD FRAMING, REF STRUCTURAL
5/8" GYPSUM BOARD
INSULATED SHEATHING
PANEL (R-5 MIN.)
HORIZ. CHANNEL LAP
WOOD SIDING
3/4"
1/4"
1 1/2"
INTERIOR
EXTERIOR
PER PLAN5/8"
8 5/8"
3/4"
1/2"
9 7/8"
R-20 + 5
1/2" PLYWOOD SHEATHING, R
STRUCTURAL
(SIM) REFERENCE STRUCTURAL
INTERIOR FINISHREF. INTERIOR FINISH
SCHEDULE
SPRAYED FOAM INSULATION
(R-20 MIN.)
2X WOOD FRAMINGREF. STRUCTURAL
5/8" GYPSUM BOARD
NEW WOOD SIDING TO
MATCH EXISTING (PAINT PER APPROVED SAMPLE)
INTERIOR
EXTERIOR
INSULATED SHEATHING
PANEL (R-5 MIN.)
R-20 + 5
WEATHER RESISTIVE BARRIE
5 1/2"1"
DRAINAGE MAT
INTERIOR FINISH
5/8" GYPSUM BOARD
EXTERIOR
5/8"
1/2"
3 1/2"
1/2"1/4"
1"
4"
INTERIOR FINISH
REF. INTERIOR FINISH SCHEDULE
BATT INSUALTION (HIGH DENSITY)(R-15 MIN.)
EXISTING WOOD FRAMING,
REF STRUCTURAL
5/8" GYPSUM BOARD
EXISTING WOOD SIDING TO MATCH EXISTING (PAINT
PER APPROVED SAMPLE)
INTERIOR
EXTERIOR
R-15
SISTERED 2 X 4 FRAMING
LINE OF 2 X 4 FRAMING
VISQUEEN VAPOR BARRIER
5/8"3 1/2"1/2"
4"
SCALE 3" = 1'-0"W-8 WOOD CHANNEL LAP SIDING WALL
SCALE 3" = 1'-0"W-9 NEW HISTORIC WOOD SIDING WALL
SCALE 3" = 1'-0"W-11 EXISTING HISTORIC WOOD SIDING WALL
Providing the visqueen vapor barrier on
the outside of the existing historic wall
assemblies with painted gypsum board
on the interior will most likely trap
moisture within the wall assembly
because the wall cannot dry in either
direction now (latex paint on gypsum
board creates another vapor barrier on
the interior side). I cannot require it to be
removed, but we do suggest it. I
apologize if my original comment
confused the issue. I wasn't trying to
state that you had to provide
waterproofing or a vapor barrier behind
the existing historic siding, I just wanted
the detail to be accurate to what you're
actually able to do given the historic
restrictions on that structure.
COMPOSITE METAL PANEL
PER MFR.
WEATHER RESISTIVE BARR
COMPOSITE METAL PANEL
HANGERS PER MFR
SPRAYED FOAM INSULATIO
(R-20 MIN.)
2X WOOD FRAMING, REF
STRUCTURAL
INTERIOR FINISH
REF. INTERIOR FINISH SC
INSULATED SHEATHING
PANEL (R-5 MIN.)
ACCENT STRIP
PANEL FASTENER
PANEL ATTACHMENT CLIP
INTERIOR EXTERIORPER PLAN 1 5/8"1 1/2"
3 1/8"
PANEL MODULE
1/2"
PANEL MODULE
R-20 +
5/8" GYPSUM BOARD
2X WOOD FRAMING, REF
STRUCTURAL
R-20 +
1/2" PLYWOOD SHEATHIN
STRUCTURAL
(SIM) REFERENCE STRUCTURAL
INTERIOR FINISH
REF. INTERIOR FINISH SCHEDULE
BATT INSULATION (HIGH DENSITY)
(R-15 MIN.)
2X WOOD FRAMING
REF. STRUCTURAL
5/8" GYPSUM BOARD
NEW WOOD SIDING TO
MATCH EXISTING (PAINT
PER APPROVED SAMPLE)
INTERIOR
EXTERIOR
1/2" SHEATHING
R-15
WEATHER RESISTIVE BARRIER
5/8"
1/2"
3 1/2"
1/2"1/4"
1"
DRAINAGE MAT
(SIM) REFERENCE STRUCTURAL
1/2" PLYWD. (OMIT EXTRA
LAYER OF PLYWD. IF IT IS NOT
NEEDED TO ALIGN WITH
HISTORIC WALLS)
4"
EXISTING WOOD FRAMING,
REF STRUCTURAL
R-15
SISTERED 2 X 4 FRAMING
10
/
8
/
2
0
1
9
3
:
3
4
:
2
0
P
M
SCALE 3" = 1'-0"W-7 METAL PANEL SIDING WALL
SCALE 3" = 1'-0"W-8 WOOD CHANNEL LAP SIDING WALL
SCALE 3" = 1'-0"W-10 NEW HISTORIC WOOD SIDING WALL
SCALE 3" = 1'-0"W-11 EXISTING HISTORIC WOOD SIDING WALL The new walls need to meet
current energy code
requirements, regardless of
whether they are being sided to
match existing historic siding.
The existing building code
exceptions do not apply to newly
constructed walls. Revise to
provide compliant insulation as
you show in W-9.
Subject: PlanCheck
Page: A812 DETAILS -EXTERIOR
Author: justinh
Color:
File Name: Architectural - Comment Response Drawings.pdf
Provide the waterproofing
drawings that you are
referencing on almost every
foundation detail.
Subject: PlanCheck
Page: A901 INTERIOR & EXTERIOR DOOR SCHEDULE W/
DOOR
Author: justinh
Color:
File Name: Architectural - Comment Response Drawings.pdf
Provide the weighted average
documentation you reference.
Subject: PlanCheck
Page: G011 RREMP PLAN
Author: justinh
Color:
File Name: Architectural - Comment Response Drawings.pdf
You have an error in the REMP
total area number you show
(1092-36=1056 not 1065).
Revise your second total.
Subject: PlanCheck
Page: 1
Author: justinh
Color:
File Name: Building Comment 1 - Architectural Response.pdf
You've made that note at 2 of
the flat roofs, but there is no
such note on the flat roofs on the
non-historic addition. Clearly
note that requirement on all flat
roof sections so that there is no
confusion as to how you are
meeting that requirement.
The largest flat roof on the
addition is more than 8' from the
inlet to the edge in the long
dimension that is called out as
being 1/4" per foot slope, which
would mean that edge will be
greater than 2" above the drain
inlet. Revise or clarify how you
intend to provide compliant
secondary drainage at that
specific flat roof.
Building Comment 1 - Architectural Response.pdf (3)
W-1
T.O. CONC.
100' - 6"
MIN.
6
"
EXPANSION JOINT
NOTE:
REF. WATERPROOFING
DRAWINGS FOR
WATERPROOFING DETAILS
SIM
T.O. FIN. FLR @ GARAGE
100' - 2"
1 1/2
T.O. WALL
99' - 6 3/4"
PRESSURE TREATED PLATE W/
CAPILLARY BREAK (TYP.)
Provide the waterproofing
drawings that you are
referencing on almost
every foundation detail.
T.O. SHTHG @ MAIN LEVEL
EXTERIOR
2' - 6"
INTERIOR
2' - 6"
DOOR DIMENSIONS
GENERAL NOTES
1)REFERENCE FLOOR PLANS FOR DOOR HANDING. NOTIFY ARCHITECT OF ANY DISCREPENCIES.
2)REFERENCE ELEVATIONS FOR WINDOW HANDING AND OPERATION. NOTIFY ARCHITECT OF
ANY DISCREPENCIES.
3)ALL WINDOWS AND DOORS TO HAVE "LOW E" INSULATED GLAZING U.N.O. THEY SHOULD ALSO BE
RATED FOR HIGH ALTITUDES, PER MANUFACTORER'S SPECIFICATION.
4)PROVIDE WEATHERSTRIPPING AND ALUMINUM THRESHOLDS FOR ALL EXTERIOR DOORS, U.N.O.
5)VERIFY WINDOW AND DOOR HARDWARE FINISHES WITH OWNER PRIOR TO ORDERING.
6)TEMPERED GLASS MUST BE PROVIDED IN ALL HAZARDOUS AREAS PER SECTION R308 2015 IRC.
7)ALL WINDOWS TO COMPY WITH 2015 IECC CHAPTER 4, CLIMATE ZONE 7 & 8, FENESTRATION U-
FACTOR 0.28. WINDOW MANUFACTORER TO PROVIDE DOCUMENTATION FOR THE WINDOW
PACKAGE DEMONSTRATING A WEIGHTED AVERAGE OF U-VALUE 0.28 AND STICKER MARKING OF
UNITS FOR APPROVAL BY THE CITY OF ASPEN BUILDING DEPARTMENT.
8) INDICATES SAFETY GLASS.
9) INDICATES EGRESS.
10)R.O.'S ARE 1/2" BEYOND OVERALL FRAME DIMENSIONS.
11)FIELD VERIFY ALL R.O. DIMENSIONS BEFORE ORDERING.
12)PROVIDE SCREENS FOR OPERABLE WINDOWS. COORDINATE WITH ARCHITECT.
13)SEE REFLECTED CEILING PLANS FOR REFERENCED SHADE POCKET DETAILS & DESCRIPTION.
T
E
SHEE
THE INF
PROPER
NO PAR
c 2
PROJ
DU
533
A
INT
DO
TY
2170
Provide the weighted
average
documentation you
reference.
SNOWMELTED AREAS
SNOWMELTED AREAS IN
R.O.W. ON SEPERATE ZONE
15.33 SF
56.71 SF
16.00 SF
30.19 SF
44.75 SF
51.44 SF
1,092.06 SFAREAS TOTAL
THE CITY ALLOWS A 9 SF REDUCTION IN
CALCULATED AREA AT EACH LIGHTWELL.
9 SF X 4 = 36 SF
1,092.06 SF -36 SF = 1,056.06 SF
REMP TOTAL AREA 1,065.06 SF
Consultant
( T ) 9 7 0 / 9 2 5 4 7 5 5 ( F ) 9 7 0 / 9 2 0 2 9 5 0
6 0 5 E A S T M A I N S T R E E T A S P E N, C O L O R A D O 8 1 6 1 1
Issue:
1 02.04.2019 PRELIMINARY
PRICING
2 05.28.2019 PRICING SET
3 07.16.2019 UPDATED
PRICING
4 09.06.2019 COMMENT
RESPONSE
5 10.09.2019 COA COMMENT
RESPONSE
You have an error in
the REMP total area
number you show
(1092-36=1056 not
1065). Revise your
second total.
Subject: PlanCheck
Page Label: A101
Author: justinh
File Name: Architectural Plans. 533 W HALLAM.pdf
Color:
Identify patio materials, there is
a detail for permeable pavers
and the site plan should clearly
show where this is proposed.
Subject: PlanCheck
Page Label: A203
Author: justinh
File Name: Architectural Plans. 533 W HALLAM.pdf
Color:
Show all electrical panel
locations on your architectural
floor plans.
Subject: PlanCheck
Page Label: A205
Author: justinh
File Name: Architectural Plans. 533 W HALLAM.pdf
Color:
Show your radon mitigation
system termination pipe on the
roof plan along with any other
venting that is not currently
shown.
Subject: PlanCheck
Page Label: A205
Author: justinh
File Name: Architectural Plans. 533 W HALLAM.pdf
Color:
Show compliant secondary roof
drainage per IRC 903.4.1, either
scuppers or secondary drains. If
secondary drains are used they
must discharge to a different
location than the primary drains
where they will be observed by
the building occupant per IPC
1108.2.
14
10' SETBACK
N14°50'49"E 100.00'
100' - 0"
LIGHT WELL LIGHT WELL LIGHT WELL LIGHT WELL BELOWBELOWBELOWBELOW
V.I.F
.
SETBACK
10' - 0"
PROPOSED 36" FENCE
LINE OF NO FOUNDATION / DIGGING ESTABLISHED BY PARKS IN PERSON MEETING ON 06.19.2018
Identify patio materials,there is a detail forpermeable pavers andthe site plan shouldclearly show wherethis is proposed.
A
PR
O
P
E
R
T
Y
L
I
N
B
4'
-
6
"
6"
12
'
-
2
3
/
8
"
Show all electrical panel locations on
your architectural floor plans.
NE OF OW
Show your radon mitigation
system termination pipe on theroof plan along with any other
venting that is not currently shown.
Show compliant secondary roof drainage per
IRC 903.4.1, either scuppers or secondarydrains. If secondary drains are used theymust discharge to a different location than the
primary drains where they will be observed bythe building occupant per IPC 1108.2.
You've made that note at 2 of the flat roofs, but
there is no such note on the flat roofs on the
non-historic addition. Clearly note that
requirement on all flat roof sections so that
there is no confusion as to how you are
meeting that requirement.
The largest flat roof on the addition is more
than 8' from the inlet to the edge in the long
dimension that is called out as being 1/4" per
foot slope, which would mean that edge will be
greater than 2" above the drain inlet. Revise
or clarify how you intend to provide compliant
secondary drainage at that specific flat roof.
Subject: PlanCheck
Page: 2
Author: justinh
Color:
File Name: Building Comment 1 - Architectural Response.pdf
You are not showing any utility
meters on the east elevation,
which is where they should be
per the main level floor plan.
Comment unresolved.
Subject: PlanCheck
Page: 4
Author: justinh
Color:
File Name: Building Comment 1 - Architectural Response.pdf
If you are proposing to protect
from decay by using treated
lumber, waterproofing a
minimum of 6" above grade, and
a capillary break you need to
also use treated sheathing within
6" of grade to fully protect the
wall framing that is less than 6"
above grade. ZIP panels (which
is what I'm assuming you are
referring to when your details
call out insulated sheathing) are
not approved to be installed less
than 6" above grade per the
manufacturer, what you propose
does not work.
Comment unresolved. Revise
details to comply with R404.1.6
by either raising the height of the
foundation walls, revising
exterior grade, or calling out
treated sheathing for the first
course above grade in addition
to the other notes you added.
Structural should be updated to
allow and/or note the
requirements for pressure
treated sheathing for the first
course.
Subject: PlanCheck
Page: 7
Author: justinh
Color:
File Name: Building Comment 1 - Mechanical Response.pdf
Are you still planning on using
an approved fabricator for shop
welds as this response implies,
or will you be using custom
structural steel as an inspected
fabricator for both shop and field
welds. Please clarify, I can
accept either but any shop welds
done by the inspected fabricator
must still be inspected by your
special inspector.
Building Comment 1 - Mechanical Response.pdf (1)
Subject: PlanCheck
Page Label: A404
Author: justinh
File Name: Architectural Plans. 533 W HALLAM.pdf
Color:
Please dimension the height and
opening size on your guard to
show compliance with IRC 312
Subject: PlanCheck
Page Label: A404
Author: justinh
File Name: Architectural Plans. 533 W HALLAM.pdf
Color:
Please show utility meters on
your elevations.
Subject: PlanCheck
Page Label: A702
Author: justinh
File Name: Architectural Plans. 533 W HALLAM.pdf
Color:
Show a compliant handrail and
guard on the lower level stairs.
Subject: PlanCheck
Page Label: A702
Author: justinh
Please add dimensions to show
that both the guard and open
04
03
GUARDRAIL PER CODE
LIGHTWELL
Please dimension theheight and opening
size on your guard toshow compliance withIRC 312
04
DRYER VENT
UARDRAIL PER CODE
LIGHTWELL Please show utilitymeters on yourelevations.
T.O. F.F. @ MAIN100' - 0"
T.O. F.F. @ UPPER110' - 4 1/2"
T.O. PLY @ MAIN99' - 9"
T.O. PLY @ UPPER110' - 1 1/2"
6' - 8"MIN. HEAD HEIGHT
MIN. HEAD
HEIGHT
10 3/4"
7"
T.O. PLY @ BASEMENT86' - 4"
T.O. F.F. @ BASEMENT86' - 7"
T.O. CONC. @ CRAWL SPACE79' - 6 3/8"
6' - 8"6' - 8"
3' - 0"
001
FAMILY /FAMILY /FAMILY /FAMILY /GAMEGAMEGAMEGAME
M01
MECHANICALMECHANICALMECHANICALMECHANICALCRAWLSPACECRAWLSPACECRAWLSPACECRAWLSPACE
106LIVINGLIVINGLIVINGLIVING
STAIRSTAIRSTAIRSTAIR
MECHANICAL ACCESS HATCH
6' - 8"
MIN. HEAD HEIGHT
MIN. HEAD HEIGHT
11 3/4"
7"
6' - 8"
M01
MECHANICALMECHANICALMECHANICALMECHANICALCRAWLSPACECRAWLSPACECRAWLSPACECRAWLSPACE
STAIRSSTAIRSSTAIRSSTAIRS
STAIRSSTAIRSSTAIRSSTAIRS
004STO.STO.STO.STO.001
FAMILY /FAMILY /FAMILY /FAMILY /GAMEGAMEGAMEGAME
ANICAL S HATCH
SCALE 1/4" = 1'-0"1 STAIR SECTION - NORTHSOUTH
Show a complianthandrail and guard onthe lower level stairs.
ELEVCSTAIRSTAIRSTAIRSTAIR
You are not showing
any utility meters on
the east elevation,
which is where they
should be per the
main level floor plan.
Comment unresolved.
Subject: PlanCheck
Page Label: A812
Author: justinhFile Name: Architectural Plans. 533 W HALLAM.pdfColor:
Revise all drawings(architecturals, structurals, civils)so grade is 6” or more below thetop of each foundation wall per
2015 IRC R404.1.6 (clearly
dimensioned in the architectural
details). Alternatively, the City
will accept a lesser distance if all
of the following are provided.
Note this requirement at all
applicable wall sections and
details:
1.All wood materials within 6” of
grade to be protected from
decay per R317.1 5.
2.Waterproof membrane
extending up wall a minimum of
6” above grade.
3.Capillary break separating
concrete from wood materials.
If you go that route you will also
need to have the structural plan
revised to show treated lumber
as a specified material and have
them list the proper fasteners for
treated wood as the chemicals
used to treat lumber can
degrade typical fasteners.
Subject: PlanCheck
Page Label: A815
Author: justinh
File Name: Architectural Plans. 533 W HALLAM.pdf
Color:
Indicate how you will accomplish
the air sealing requirements of
2015 IECC table R402.4.1.1
using notes and details. Indicate
the continuity of the air barrier
and where it is locatedthroughout the building. Notelocations that require caulking,sealing, taping, etc. Note whichcomponents are included in the
air barrier such as spray foam,
gypsum, housewrap, and/or
exterior insulation. You may
have all of the above but you
need to pick one continuous
barrier and stick to it. It needs to
follow the thermal barrier. The
better detail you provide, the
easier it will be for the contractor
and inspector to be successful.
This is a new 2015 code
requirement in lieu of a blower
door test. I've attached our
standard air sealing detail sheets
to this comment letter as an
W-1
T.O. CONC. @ CRAWL SPACE79' - 6 3/8"F-1
WATERPROOFINGHYDRODUCT COIL 600
WRAP HYDRODUCT 220 PERMANUFACTURER'S RECOMMENDATIONS.
PER STRUCT.
PER STRUCT.T.O. CONC. @ BASEMENT83' - 2"
F-1 W-2SIM
MECHANICAL VOID SPACE
PER STRUCT.EXPANSION JOINTHYDRODUCT 220
HYDRODUCT COIL 600
PER STRUCT.
REFERENCE SOIL RETENSION PLANS FOR SYSTEM TO USE
A
T.O. PLY @ MAIN99' - 9"
B
T.O.F.F. @ PATIO & GARAGE99' - 11"R-1 R-4
WOOD CLAD STEEL COLUMN.PAINT TO MATCH SIDING.KEEP WOOD 1" UP FROM FIN. GRADE
1"
COLUMN BASE PER STRUCTURALWATERPROOFING PER WJECONCRETE DECKING PER STRUCTURALMICROPILE WALL DEMO CAP AS NECESSARY. VERIFY LOCATIONS WITH ENGINEER.STEEL PER STRUCTURAL
PER STRUCTURAL
T.O. F.F. @ MAIN100' - 0"
A
T.O. PLY @ MAIN99' - 9"
B
W-2
EXISTING HISTORIC STUDS AND SIDING VIF LOCATION AND CONNECTION TO NEW STRUCTURAL FOOTING WITH ARCHITECT AND STRUCTURAL ENGINEER DURING DEMO PHASE. W-111/2" DENSGLASS BACKER OVER WATERPROOFING.CONCRETE SCRACTH COAT TO MATCH EXISTING CONDITION. VIF COLOR WITH ARCHITECT.
PROPOSED GRADE TO MATCH RELATIONSHIP OF EXISTING GRADE TO HISTORIC HOUSE. REF CIVIL AND GRADING PLANRIGID INSULATION3"
DRAINAGE MAT
CONTINUE SPRAY INSULATION UP TO THE BOTTOM OF SHEATHING (TYP)
T.O. F.F. @ MAIN100' - 0"
LK
T.O. PLY @ MAIN99' - 9"
METAL FLASHING CONTINUOUSUNDER WINDOW 1/2" DENSGLASS OVER ZIP PANELFOR PROTECTION.WATERPROOFING PER WJECONCRETE TOPPING SLOPED 1/4" PER FOOT
CONTINUE SPRAY FOAM INSULUP TO UNDERSIDE OF SHEATHING(TYP)CONCRETE PER STRUCTURAL
W-3PER STRUCT.
PER STRUCT.
10
T.O. PLY @ MAIN99' - 9"T.O.F.F. @ PATIO & GARAGE99' - 11"F-2 EXPANSION JOINTCONC FILL AS NECESSARY VIF WITH STRUCTURALALLEY GRAVELCONCRETE DRIVE UP FROM PROPERTY LINE TO GARAGE ENTRY. GARAGE DOOR
MICROPILE WALL
PER STRUCT.STEEL PER STRUCTURALSTEEL DECKING AND GARAGE CONC PERSTRUCTURAL
LK
T.O. PLY @ MAIN99' - 9"T.O.F.F. @ PATIO & GARAGE99' - 11"
F-2
W-1
W-7 METAL FLASHING CONTINUOUSUNDER DRAINAGE MAT AND OVER FOUNDATION INSULATIONMETAL FLASHING WITH DRIP EDGE COLOR TO MATCHSIDING
CONTINUOUS METALFOUNDATION FLASHING. POWEDER COAT TO MATCHMETAL PANNEL SYSTEM.
SELF ADHERED FLASHINGTO OVERLAP ALL METAL FLASHING
PER STRUCT.PER STRUCT.
STEEL PER STRUCTURAL
T.O. F.F. @ MAIN100' - 0"
C
T.O. PLY @ MAIN99' - 9"T.O.F.F. @ PATIO & GARAGE99' - 11"R-1
SELF ADHERED FLASHINGTO OVERLAP ALL METAL FLASHINGMETAL FLASHING CONTINUOUSUNDER DRAINAGE MAT AND OVER FOUNDATION INSULATIONMETAL FLASHING WITH DRIP EDGE COLOR TO MATCH SIDING. W-7
WATERPROOFING PER WJE3" RIGID INSULATION1/2" DENSGLASSCONC PER STRUCTURALSTEEL PER STRUCTURAL
T.O. F.F. @ MAIN100' - 0"T.O. PLY @ MAIN99' - 9"
W-7SIM
W-1
SELF ADHERED FLASHINGTO OVERLAP ALL METAL FLASHINGMETAL FLASHING CONTINUOUSUNDER DRAINAGE MAT AND OVER FOUNDATION INSULATIONMETAL FLASHING WITH DRIP EDGE COLOR TO MATCHSIDING
FLOOR FRAMING. REF STRUCT.CONTINUOUS METALFOUNDATION FLASHING. POWEDER COAT TO MATCHMETAL PANNEL SYSTEM.
A
T.O. F.F. @ UPPER110' - 4 1/2"T.O. PLY @ UPPER110' - 1 1/2"
F-3 W-7
METAL FLASHING W/ DRIP EDGE,COLOR TO MATCH SIDING
WOOD FASCIA TO MATCH SIDING
CONTINUOUS SPRAY FOAM INSULATION
STEEL BEAM, REF. STRUCT.
SAW-CUT DRIP EDGE
WOOD WRAPPED COLUMN
SELF-ADHERED FLASHING TO OVERLAP METAL FLASHING
WEATHER RESISTANT BARRIER
SCALE 1 1/2" = 1'-0"A8124DTL_Foundation @ Office West
SCALE 1 1/2" = 1'-0"A8126FOUNDATION WALL @ STAIR HALL
SCALE 1 1/2" = 1'-0"A8127DTL_Foundation Wall @ Garage DoorSCALE 1 1/2" = 1'-0"A8128FOUNDATION WALL @ GARAGE SLAB - EAST
SCALE 1 1/2" = 1'-0"A8129PATIO @ EXTERIOR WALLSCALE 1 1/2" = 1'-0"A81210TYPICAL FOUNDATION WALL @ WOOD JOIST SCALE 1 1/2" = 1'-0"A8125COLUMN @ MASTER BATH
Revise all drawings (architecturals, structurals, civils) sograde is 6” or more below the top of each foundation wallper 2015 IRC R404.1.6 (clearly dimensioned in thearchitectural details). Alternatively, the City will accept alesser distance if all of the following are provided. Note thisrequirement at all applicable wall sections and details:1.All wood materials within 6” of grade to be protected fromdecay per R317.1 5.2.Waterproof membrane extending up wall a minimum of 6”above grade.3.Capillary break separating concrete from wood materials.If you go that route you will also need to have the structuralplan revised to show treated lumber as a specified materialand have them list the proper fasteners for treated wood asthe chemicals used to treat lumber can degrade typicalfasteners.
Indicate how you will accomplish the air sealingrequirements of 2015 IECC table R402.4.1.1 usingnotes and details. Indicate the continuity of the airbarrier and where it is located throughout the building.Note locations that require caulking, sealing, taping, etc.Note which components are included in the air barriersuch as spray foam, gypsum, housewrap, and/orexterior insulation. You may have all of the above butyou need to pick one continuous barrier and stick to it. Itneeds to follow the thermal barrier. The better detail youprovide, the easier it will be for the contractor andinspector to be successful. This is a new 2015 coderequirement in lieu of a blower door test. I've attachedour standard air sealing detail sheets to this commentletter as an example of the type of detailing we'relooking for.
If you are proposing to protect from decay by
using treated lumber, waterproofing a minimum
of 6" above grade, and a capillary break you
need to also use treated sheathing within 6" of
grade to fully protect the wall framing that is
less than 6" above grade. ZIP panels (which is
what I'm assuming you are referring to when
your details call out insulated sheathing) are
not approved to be installed less than 6" above
grade per the manufacturer, what you propose
does not work.
Comment unresolved. Revise details to comply
with R404.1.6 by either raising the height of the
foundation walls, revising exterior grade, or
calling out treated sheathing for the first course
above grade in addition to the other notes you
added.
Structural should be updated to allow and/or
note the requirements for pressure treated
sheathing for the first course.
Subject: PlanCheck
Page Label: 8
Author: justinh
File Name: Mechanical Plans. 533 W HALLAM.pdf
Color:
Snowmelt square footages
shown here and on the
snowmelt schedule do not match
what is shown on the
architectural REMP sheet.
Revise one or the other so that
the snowmelt quantities and
locations are consistent. You
may exempt 9 SF of snowmelt
for each window well (minimum
size required for an emergency
escape egress well) but you
must include any additional
square footage for each window
well in your REMP calculation.
Subject: PlanCheck
Page Label: 1
Author: justinh
File Name: RREMP Documents.533 W Hallam.pdf
Color:
Please fill out the contact info
portion of this form. If the site
plan/REMP plan are revised per
discussions with HPC and
building regarding the light well
guards, please be sure to update
the square footages on this
sheet accordingly.
RREMP Documents.533 W Hallam.pdf (1)
Subject: PlanCheck
Page Label: 3
Author: justinh
File Name: Special Inspection Agreement.533 W Hallam.pdf
Color:
You need an approved
fabricator's signature for the
shop welds shown in the
structural plans. Please
resubmit the agreement. You
may resubmit responses without
this if you have yet to decide on
your welder/steel fabricator but
building will not be able to sign
off on your permit until this
agreement has been fully
executed.
Special Inspection Agreement.533 W Hallam.pdf (1)
Subject: PlanCheck
Page Label: 1
Author: justinh
File Name: Structural Plans. 533 W HALLAM.pdf
Color:
Our wind speed design criteria is
89 MPH, please revise.
Structural Plans. 533 W HALLAM.pdf (3)
S
T
T
T
T
T
T
2
2
5
5
6
6
7
7
8
8
9
9
10
10
LL KK
JJ
FFGG
DDCC
AA
3
3
4
4
EE
HH
1
1
BB
5BRZ30 SQFT
7ARZ435 SQFT
7BRZ125 SQFT
6BRZ35 SQFT
6ARZ1050 SQFT5ARZ495 SQFT
8RM
9RM 7RM
GARAGE103
MUD ROOM102 ENTRY101
LIVING106
STAIR73
STAIRS49
PDR105 KITCHEN107
CASUAL DINING109
ENTRY HALL110 ENTRY111
DINING113
OFFICE114
BIKES104
1/2"ø HWS1/2"ø HWR
3/4"ø HWR UP3/4"ø HWS UP
3/4"ø HWS1"ø HWR
3/4"ø HWS3/4"ø HWR1"ø HWS DN1"ø HWR DN
1SZ635 SQFT2SZ235 SQFT
3SZ185 SQFT5SZ10 SQFT
4SZ30 SQFT
3SM
2
3
1
4
5
TO FC-4 &RZ-6A
TO FC-5,MD-5B &RZ-7A
TO FC-5,MD-5A &RZ-7B
TO RZ-5B
TO RZ-5A
TO RZ-6B
www.aec-
v
a
i
l
.
c
o
m
of
Drawn By:Checked By:
AEC PROJECT #:
COPYRIGHT 2018 ARCHITECTURAL ENGINEERING CONSULTANTS, INC.c
cae
PO Box 8
4
8
9
,
4
0
8
0
1
U
S
H
w
y
6
&
2
4
,
S
t
e
2
1
4
,
A
v
o
n
,
C
o
lorado,
8
1
6
2
0
Mechanic
a
l
,
E
l
e
c
t
r
i
c
a
l
&
L
i
g
h
t
i
n
g
D
e
s
i
g
n
S
e
r
v
i
c
e
s
Archi
t
e
c
t
u
r
a
l
E
n
g
i
n
e
e
r
i
n
g
C
o
n
s
u
l
t
a
n
t
s
Telephon
e
:
9
7
0
-
7
4
8
-
8
5
2
0
F
a
x
:
9
7
0
-
7
4
8
-
8
5
2
1
An Office
w
i
t
h
L
E
E
D
™
A
c
c
r
e
d
i
t
e
d
P
r
o
f
e
s
s
i
o
n
a
l
s
DATE: ISSUE:
SCALE 1/4" = 1'-0"
18032.00
DUN
C
A
N
S
K
I
H
A
U
S
533 W
E
S
T
H
A
L
L
A
M
ASPE
N
,
C
O
L
O
R
A
D
O
,
8
1
6
1
1
M-122
FIRST FLOORMECHANICALPIPING
10 14
BLU TOC
11/23/18PERMIT/PRICING
1/4" = 1'-0"1MECHANICAL PIPING - 1ST FLOOR
SHEET NOTES:1 CONNECT 1/2" SMS/R TO SM-3.2 CONNECT 1/2" HWS/R TO RM-9.3 CONNECT 3/4" HWS/R TO RM-8.4 CONNECT 3/4" HWS/R TO RM-7.5 INSTALL SNOW & ICE SENSOR IN THE SNOWMELT ZONE AS SHOWN.COORDINATE EXACT LOCATION WITH G.C. ENSURE THE SENSOR ISEQUIDISTANT BETWEEN TUBING & NOT UNDER OVERHANGS OR INWIND EDDIES.6 SEE ARCH SITE PLAN FOR CONTINUATION
1. OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE STRUCTURAL ENGINEER.2. ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY.3. VERIFY FINAL LOCATIONS OF ALL MANIFOLDS WITH THE G.C. CONTACT ENGINEER IF MANIFOLDS MOVE MORE THAN 10' FROM LOCATIONS SHOWN ON PLANS.4. LOCATION OF ALL THERMOSTATS AND FLOOR SENSORS ARE APPROXIMATE, COORDINATE EXACT LOCATIONS WITH THE ARCHITECT. LOCATE FLOOR SENSORS EQUIDISTANT BETWEEN RADIANT LOOPS, AND DO NOT LOCATE WHERE THEY MAY LIKELY BE COVERED BY FUTURE RUGS OR FURNITURE.5. ALL PIPING SIZED FOR TYPE L COPPER. CONTACT ENGINEER FOR ANY CHANGE TO PEX FOR NECESSARY PIPE SIZING AND/OR PUMP CHANGES.6. INSULATE ALL PIPE LEADERS PASSING THROUGH ADJACENT ZONES.
GENERAL NOTES:
Snowmelt square footages shown here andon the snowmelt schedule do not matchwhat is shown on the architectural REMPsheet. Revise one or the other so that thesnowmelt quantities and locations areconsistent. You may exempt 9 SF ofsnowmelt for each window well (minimumsize required for an emergency escapeegress well) but you must include anyadditional square footage for each windowwell in your REMP calculation.
PROJECT ADDRESS:Parcel ID #: Permit Number:
CONTACT INFORMATION :Owner:Name:City:
Address:State:Email:Zip Code:
Phone: Cell Phone:Owner's Representative :
Name:City:AspenAddress:State:Colorado
Email:Zip Code:81611
Phone: Cell Phone:`A.RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAMSheets showing snowmelt, pool, spa, and solar/GSHP information: Do you have snowmelt or a spa that has been exempted by the buiding official?Hydro Snowmelt Electric Snowmelt Pool SpaExisting0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqftTo be Demoed 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqftExisting to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqftNew (non-exempt)1128.63 sqft 0.00 sqft 0.00 sqft 0.00 sqftNew (exempt)0.00 sqft 0.00 sqft 0.00 sqftTotal New 1128.63 sqft 0.00 sqft 0.00 sqft 0.00 sqftTotal on site 1128.63 sqft 0.00 sqft 0.00 sqft 0.00 sqftTotal Snowmelt on siteBoiler Efficiency 95.0%100%95.0%95.0%Mitigation Payment -$ -$ Total Payment for Mitigation:40,393.07$ B.ON-SITE RENEWABLE CREDITS Supplemental System REMP CreditUse PV WorksheetPhotovoltaic System -$ Use Thermal WorksheetHot Water Panels -$
2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAMCity of Aspen Version 11.3 UpdAted deCember 13, 2017533 West Hallam Aspen CO 81611
Wlewis@BillPoss.com
William Lewis
1128.63 sqft
605 East Main Street
G007
(970) 925-4755
$40,393.07
Yes (enter sqft below on the exempt row)No
Please fill out the contact infoportion of this form. If the siteplan/REMP plan are revised perdiscussions with HPC andbuilding regarding the light wellguards, please be sure toupdate the square footages onthis sheet accordingly.
You need an approved fabricator'ssignature for the shop weldsshown in the structural plans. Please resubmit the agreement. You may resubmit responseswithout this if you have yet todecide on your welder/steelfabricator but building will not beable to sign off on your permit untilthis agreement has been fullyexecuted.
Wind LoadingBasic Wind Speed Vult= 115 MPH Vasd= 90 MPHExposure Category BGCpi0.18Wind Base Shear - Ultimate 21.9 K
Wind Design Pressure Components & Cladding - Ultimate 50ft2
East/WestNorth/South
Local Jurisdiction: City of AspenBuilding Code: 2015 International Building Code
-34.4 PSFInterior Roof Zone (Zone 1)-47.0 PSFRoof End Zone (Zone 2)
STRUCTURAL DESIGN CRITERIA
Risk Category: II
20ft2
-42.3 PSF-54.1 PSF
100ft2
-28.4 PSF-41.7 PSF
(Note 1)
19.8 K
SURANCEactor is responsible for quality assurance, including ship and materials furnished by subcontractors and suppliers. n or testing by the Owner does not relieve the Contractor of his ility to perform the work in accordance with the Contract ts. nship: The Contractor is responsible and shall bear the cost of g work which does not conform to the specified requirements. eficient work by means acceptable to the Architect. The cost of k incurred by the Architect to approve corrective work shall be the Contractor.
NTROLer's Testing Agency shall perform testing and special inspections by the structural documents, building code and the local The Testing Agency shall comply with ASTM E329 and upon on of work, the Testing Agency shall furnish a certificate of ce, signed by the professional engineer overseeing special
ABBRE AB anchor ADDNL addition AFF above f ALT alternat ARCH architec
BLDG buildingBM beamBOT, B/, BOx bottom BRG bearingBS both si BTWN between
CIP cast-in CJ constru CJP complet CLR clearCMU concret COL column
Our wind speeddesign criteria is 89MPH, please revise.
Are you still planning on using an approved fabricator
for shop welds as this response implies, or will you be
using custom structural steel as an inspected
fabricator for both shop and field welds. Please
clarify, I can accept either but any shop welds done by
the inspected fabricator must still be inspected by
your special inspector.
Subject: PlanCheck
Page: [5] C2 Site Plan
Author: justinh
Color:
File Name: Civil - Comment Response Drawings.pdf
Civil plans are calling out
snowmelt in areas that are not
shown as being snowmelted in
the REMP plan, revise one or
the other so that they match.
You are also still showing patio
around window wells that was
removed on the architectural site
plan to avoid needing guards.
Revise all plans to match.
Civil - Comment Response Drawings.pdf (2)
Subject: PlanCheck
Page: [5] C2 Site Plan
Author: justinh
Color:
File Name: Civil - Comment Response Drawings.pdf
REMP plan shows this as being
a snowmelted area, and it is not
above the basement roof.
Details on C7 do not show
snowmelt. If this is pervious
snowmelt provide a detail
showing the proposed hole
pattern and insulation thickness
for the pervious snowmelt that
still obtains a weighted average
of R10.
Subject: PlanCheck
Page: 1
Author: justinh
Color:
File Name: Mechanical - 2015 IECC REMP Calcuations -
Response.pdf
Sign the REMP worksheet.
Mechanical - 2015 IECC REMP Calcuations - Response.pdf (1)
Subject: PlanCheck
Page: M-111A LOWER LEVEL HVAC FLOOR PLAN
Author: justinh
Color:
File Name: Mechanical - Comment Response Drawing.pdf
Where is your outdoor air intake
located? I'm realizing I was not
looking at the correct item
previously and I just want to
clarify the issue so that I can
verify it meets the requirements
for intake location.
Mechanical - Comment Response Drawing.pdf (1)
Civil plans are calling out snowmelt in areas that are
not shown as being snowmelted in the REMP plan,revise one or the other so that they match.
You are also still showing patio around window wells
that was removed on the architectural site plan toavoid needing guards. Revise all plans to match.
REMP plan shows this as being a snowmelted area, and
it is not above the basement roof. Details on C7 do not
show snowmelt. If this is pervious snowmelt provide a
detail showing the proposed hole pattern and insulation
thickness for the pervious snowmelt that still obtains a
weighted average of R10.
Hydro Snowmelt Electric Snowmelt Pool Spa
Existing 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
To be Demoed 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
Existing to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
New (non-exempt)1056.06 sqft 0.00 sqft 0.00 sqft 0.00 sqft
New (exempt)36.00 sqft 0.00 sqft 0.00 sqft
Total New 1092.06 sqft 0.00 sqft 0.00 sqft 0.00 sqft
Total on site 1092.06 sqft 0.00 sqft 0.00 sqft 0.00 sqft
Total Snowmelt on site
Boiler Efficiency 95.0%100%95.0% 95.0%
Mitigation Payment -$ -$
Total Payment for Mitigation:37,795.83$
B.ON-SITE RENEWABLE CREDITS
Supplemental System REMP Credit
Use PV Worksheet Photovoltaic System -$
Use Thermal Worksheet Hot Water Panels -$
Use GSHP Cert Ground Source Heat Pump -$
Other Approved System -$
Total Mitigation Credits:-$
Onsite Renewable Offsets: How many KiloWatts of PV (solar electric) would I need? 5.51
or How many square feet of SHW (solar hot water) would I need? 168.24
R-REMP Payment:37,795.83$
Amount Previously Paid on This Permit:
37,795.83$
Refund (includes minus $750): -$
C. PREPARED BY:Date: 9/9/2019
Print Name:
Signature:
Phone & EMail:
REVIEWED:Date:
970 748 8520
TOTAL R-REMP PAYMENT:
1092.06 sqft
Bryan Urban
$37,795.83
Sign the REMP
worksheet.
89
Where is your outdoor air intake
located? I'm realizing I was not looking
at the correct item previously and I just
want to clarify the issue so that I can
verify it meets the requirements for
intake location.