Loading...
HomeMy WebLinkAboutMaster Permit.1322 Snowbunny Ln.0291.2018.ARBKClose Window Print This Page Expand All | Collapse All 0291.2018.ARBK Number 0291.2018.ARBK Record Type Building - Imported 1322 SNOWBUNNY LN Owner Fernando Cruz Original Number 76918 Status Closed - Final Type Building Reason for Cancel or Compl. Review Fail Applicant BRAD CRAWFORD No CRAWFORD DESIGN BUILD LLC Required Bond Amount Project Land Use Planning Application Permit Contractor GLENN Master Building Permit Valid Business License on Account Bluebeam Project Id 322-592-046 Imported HPC-ZON-EH-UTIL Review Required Submissions HPC-ZON-EH-UTIL Review- 2 Documents Resubmitted Eng Review Eng-CMP Rev,Eng-Dev Rev,Util-Dev Maj,Eng-ES Rev,Util Rev,Eng-Wtr Rev, Parks-Prkng-San Review Parks Rev,Parks Fee,Water-LSE Rev,San Rev, Conditional Inspections Parks Insp, Conditional Final Insp Eng-Dev Final,Eng-ES Final,Eng-Wtr Final,Util Final,Parks Final,Water-LSE Final,San Final, Action Items Hold Reason Major EDEN Conditional Flat Fee Formula FP,Applicant is a Nonprofit?No Conditional Tiered Fee Formula Eligible for Small Lodge Program? No Conditional Tiered SqFt Fee Formula MAR,Discount All Fees (%) Fee Discount Reason CO Status if Applicable Issued Queue Score Queue Designation Queue Score 0 Milestone Current Days in City Hands Last Date Received from Applicant Milestone - Total Days in Applicant Hand Milestone - Total Days in City Hands Dates 12/13/2018 TCO Issuance Date 12/13/2018 Close/CO Issuance Date 12/29/2022 Address Aspen Internal? Account Total Available Bond Amount Is This Associated w/a Building Permit? Approved Covid-19 Plan Hold All Reviews Create Fees Create Fees 2 Utility Review Type Price Book CO/LOC? Milestone Current Days in Applicant Hand New Application Date Application Complete Date 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 1/23 12/13/2018 Expiration Date 7/23/2022 7/24/2019 12/29/2022 Basic Information Description Applicant: Brad Crawford Crawford Design Build NEW DUPLEX BUILDING - UNIT A; UNIT B 0290.2018.ARBK //LAUREN//BLUEBEAM 322- 592-046 Census Code 103 - Two Family Residences Use of Building Duplex Use Class Residential Class of Work New The final WELS inspection/approval will not be considered by the City until all landscaping and irrigation is completed according to approved plans. A third-party irrigation audit and other documentation (WELS Sections 5.7, 5.8 and 6) shall be submitted to the WELS Plans Reviewer for review and approval prior to scheduling an inspection. Job Location Address 1322 SNOWBUNNY LN, ASPEN : 273501363002 Lot Site Address Display on Map Legal Description Historic Property?No 1322 SNOWBUNNY LN Historic District?No HPC - Planning - Zoning Details Zone District R-15 HOA/Covenant HOA/Covenant Approval Acquired Is There an ADU?No HPC Certificate of Appropriateness? No ADU Sq Ft Work Involves a Land Use Approval? No Deed Restricted?No Located in a PD?No # of Dwellings Yes Category of Zoning Fee Residential Yes Zoning Work Level Major Zoning Fee Yes Building Project Details $1,304,219.00 7,500 Reason for Valuation Change 7,500 7,500 7,500 0 7,500 0% 8,071 15,000 7,500 7,500 100% 7,500 Scope of Work Details Work Changes Building Footprint? Yes Yes Yes Located Within City Mall Boundaries? No Yes Adjacent to City Open Space? No Application Accepted Date Issue Date Override Expiration Date Last Activity Date Interior Remodel Only Permit Comments Eden Address Adds/Changes Floor Area? Occupancy or Use Change? Work Affects Exterior of Building? Valuation Lot Size Sq. Ft. Soil Disturbance Sq Ft Unit Sq. Ft.Affected Area Sq Ft Building Footprint Sq Ft Existing Hardscape Footprint Sq Ft Sq Ft of Building Work Area Existing Hardscape % of Lot Building Fire Area Sq Ft Con Mit Sq Ft Total Utility Review Sq. Ft.Utility Review Sq Ft Total % of Interior being Altered New Sq. Ft. Work Affects Tree/Drip Line? Work Changes Fenestration/Thrml Envelop? Requires Asbestos Test? 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 2/23 Photovoltaic Installation No Impacts City Trails/Parks?No Yes Yes No Yes Change of Restaurant Ownership? No Prevents Access to Sewer Main? No No Sewer Easements Affected? No Building Description Code Editions 2015 IRC Required Special Inspections Energy Code Compliance Building Type (IRC) Total Snowmelt Sq Ft Construction Type VB Total Spa Sq Ft Occupancy Load Total Pool Sq Ft Fire Sprinkler Existing? Amount of Onsite Renewable Generation? Fire Sprinkler Required?Yes CO Description Fire Sprinkler Type Basement Fire Alarms Installed? 1st Floor # Wood Fireplaces 2nd Floor # Gas Log Fireplaces 3rd Floor # Gas Appliances Additional Open Text Field For Comments The final WELS inspection/approval will not be considered by the City until all landscaping and irrigation is completed according to approved plans. A third-party irrigation audit and other documentation (WELS Sections 5.7, 5.8 and 6) shall be submitted to the WELS Plans Reviewer for review and approval prior to scheduling an inspection. Financials $0.00 Total Payments Total Balance $0.00 System Information Number 0291.2018.ARBK Community Visibility Created By Ruth Kinney, 7/27/2019 1:50 PM 0033s000010f2ZZAAY,0036A00000ZPzftQAD,0033s000011OxQUAA0,0036A00000cuuxcQAA,0034o00001iILJtAAO IsTestData?Last Modified By Fernando Cruz, 12/2/2024 3:30 PM VIP Form Tool VIP Submitted VIP Template Status VIP Foreign Language VIP Form Template Permit Application Action Items View/Print Permit Link Attachment View GIS Map View Milestone Gantt Chart Activity History Email: Certificate of Occupancy for 1322 Snowbunny ln - 0291.2018.ARBK - Issued Type Billable Work Adds/Removes/Changes Plumbing Fixt? Work Subject to Water Efficient L.O.? Restaurant/Food Service Involved? Involves Impact on Sewer? Affects Parking/Alleys/Loading? Other Code Editions Total Fees Fees Due at Current Status Contact IDs 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 3/23 Assigned To Renee Espinoza Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 2/3/2022 Days in Applicant's Hands Comments To: crawforddesignbuild@comcast.net CC: BCC: Attachment: 1-County Use Tax Final Return Template (PDF).pdf, 1322 Snowbunny ln - 0291.2018.ARBK _ CO Final.pdf, 1322 Snowbunny ln - 0291.2018.ARBK _ City_Use_Tax_to_Owner.pdf, 1-City Final Return_Use Tax.pdf, 1322 Snowbunny ln - 0291.2018.ARBK - Notice_to_Contractor.pdf Subject: Certificate of Occupancy for 1322 Snowbunny ln - 0291.2018.ARBK - Issued Body: Good Afternoon, Please find attached your issued Certificate of Occupancy for 1322 Snowbunny ln. Additionally you will find attached the Owner and the Contractor's City use tax letters and tax reconciliation forms. Please distribute these as necessary. If you have any questions please feel free to reach out. Kind regards, Lilly Culver Email: Utility Connection Permit Final Type Billable Assigned To Aaron Reed Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 12/14/2021 Days in Applicant's Hands Comments To: crawforddesignbuild@comcast.net CC: BCC: Attachment: 1322_UCP_Water_Final.pdf Subject: Utility Connection Permit Final Body: Hello BRAD CRAWFORD, Attached is your final Utility Connection Permit for the completed project at 1322 SNOWBUNNY LN associated with permit #: 0291.2018.ARBK. After review, please print, have signed by owner, and notarized. Once signed and notarized, please return UCP with payment, if applicable, to the Finance Department window located on the second floor of City Hall at 427 Rio Grande Place. Alternatively, you may upload the signed and notarized copy of the UCP as a SCANNED (not photographed) .pdf file and pay all fees due via Salesforce, but if submitting via Salesforce, please send a chatter to @Robert Gregor and @Cole Langford on the permit record once the document is uploaded and all fees are paid to serve as a “push” notification that these permit requirements are complete. Please reach out with any questions or concerns. Email: Temporary Certificate of Occupancy - 0291.2018.ARBK - 1322 Snowbunny ln- Issued Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/5/2021 Days in Applicant's Hands Comments To: crawforddesignbuild@comcast.net CC: BCC: Attachment: 1322 Snowbunny ln - 0291.2018.ARBK _ TCO Final.pdf 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 4/23 Subject: Temporary Certificate of Occupancy - 0291.2018.ARBK - 1322 Snowbunny ln- Issued Body: Good Morning, Please find attached your issued Temporary Certificate of Occupancy for the project at 1322 Snowbunny ln. If you have any questions or concerns please let us know. Kind regards, Lilly Culver Email: Utility Connection Permit Final Type Billable Assigned To Aaron Reed Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 12/8/2020 Days in Applicant's Hands Comments To: crawforddesignbuild@comcast.net CC: BCC: Attachment: 1322_UCP_Water_Final.pdf Subject: Utility Connection Permit Final Body: Hello BRAD CRAWFORD, Attached is your review Utility Connection Permit for the completed project at 1322 SNOWBUNNY LN associated with permit #: 0291.2018.ARBK. After review, please print and have signed by owner and notarized. Once signed and notarized, please return with payment, if applicable, to the Finance Department window located on the first floor of City Hall at 130 S. Galena St. Please reach out with any questions or concerns. Thank you, Aaron Reed (970)920-5123 Email: COVID-19 Safety Plan Approval Type Billable Assigned To MITCH MILLER Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/27/2020 Days in Applicant's Hands Comments To: cdbsimon@comcast.net CC: BCC: Attachment: APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN__20200427.pdf Subject: COVID-19 Safety Plan Approval Body: Dear BRAD CRAWFORD, Thank you for submitting a COVID-19 Site Safety Plan for 0291.2018.ARBK at 1322 SNOWBUNNY LN. City staff has reviewed and approved the safety plan. Attached is the COVID-19 Approval Notice to re-commence construction. Please hang this Approval Notice on site so it is clearly visible for inspectors and law enforcement. Please adhere to all aspects of the plans to keep all employees and the community safe. Failure to adhere to the plan, as well as County requirements, will result in a site shut down. We thank you for your efforts to keep the community safe, and please let us know if you have any further questions. Email: Important! Your City of Aspen permit has been moved to new permitting system Type Billable Assigned To Sophie Varga 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 5/23 Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/16/2020 Days in Applicant's Hands Comments To: crawforddesignbuild@comcast.net CC: BCC: Attachment: --none-- Subject: Important! Your City of Aspen permit has been moved to new permitting system Body: Dear BRAD CRAWFORD, As you may know, the City of Aspen has been transitioning to a new online-based permitting system, Salesforce. Thank you for your patience during this transition, which is now complete. Your permit is now operational in Salesforce. Your project located at 1322 SNOWBUNNY LN, ASPEN : 273501311004 will retain its original permit number, 0291.2018.ARBK and you will use this number to find your permit in Salesforce. If you have not already done so, you must register in Salesforce before you are able to access your permit information, upload new documents, request inspections, or otherwise track the status of your permit. Instructions on how to register and navigate the new permitting system can be found at this link: https://www.cityofaspen.com/1211/Salesforce-Applicant-Portal-Support TO REQUEST AN INSPECTION: You are no longer able to request an inspection via the old system. Instructions on how to request an inspection in Salesforce can be found at this link: https://www.cityofaspen.com/DocumentCenter/View/4254/Request-an-Inspection?bidId= If you have additional questions that are not addressed at the above links, you may reach out directly to City staff for assistance at sfsupport@cityofaspen.com. Sincerely, Lauren Litchet City of Aspen Sophie Varga Zoning Enforcement Officer Community Development 130 S. Galena St. Aspen, CO 81611 p: 970.429.2778 c: 970.274.7256 www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contained in the email are based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 1/14/2022 Days in Applicant's Hands Comments Permit Review Type Zoning 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 6/23 Billable Assigned To Sophie Varga Number of Hours 1.00 Total Cost $325.00 Fee Generated Date Start Date Completed Date 10/1/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 8/19/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 7/7/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 7/7/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 1.00 Total Cost $325.00 Fee Generated Date Start Date Completed Date 6/22/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.25 Total Cost $81.25 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 7/23 Fee Generated Date Start Date Completed Date 5/27/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 5/8/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To MITCH MILLER Number of Hours 1.00 Total Cost $325.00 Fee Generated Date Start Date Completed Date 4/27/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/24/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/18/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To Steve Feder Number of Hours 1.00 Total Cost $325.00 Fee Generated Date Start Date Completed Date 3/10/2020 Days in Applicant's Hands 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 8/23 Comments Contacts JOEL CRAWFORD Account CRAWFORD DESIGN BUILD LLC Type Contractor Active Contractor License Count 0.00 Number 0025667 DON GLENN Account CRAWFORD DESIGN BUILD LLC Type Contractor Active Contractor License Count 0.00 Number 0025670 SIMON BENTLEY Account CRAWFORD DESIGN BUILD LLC Type Contractor Active Contractor License Count 0.00 Number 0025669 Account CRAWFORD DESIGN BUILD LLC Type Contractor Active Contractor License Count 0.00 Number 0012557 Account CRAWFORD DESIGN BUILD LLC Type Applicant Active Contractor License Count 0.00 Number 0023593 MARTIN MATA Account MATA DESIGN COMPANY Type Architect Active Contractor License Count 0.00 Number 0024315 PHIL LEHUE Account PHIL LEHUE Type Representative Active Contractor License Count 0.00 Number 0042845 Files 1-County Use Tax Final Return Template (PDF) Last Modified 2/3/2022 3:52 PM Created By Lilly Culver 1322 Snowbunny ln - 0291.2018.ARBK - Notice_to_Contractor Last Modified 2/3/2022 3:51 PM Created By Lilly Culver 1322 Snowbunny ln - 0291.2018.ARBK _ CO Final Last Modified 2/3/2022 3:46 PM Created By Lilly Culver City_Use_Tax_-__FRR_Transmittal_to_Owner__20220203.docx Last Modified 2/3/2022 3:39 PM Created By Lilly Culver UCP_Water_Final__20211213.docx Last Modified 12/13/2021 7:30 AM Created By Aaron Reed 1-City Final Return_Use Tax Last Modified 2/3/2022 3:52 PM Created By Lilly Culver 1322 Snowbunny ln - 0291.2018.ARBK _ City_Use_Tax_to_Owner Last Modified 2/3/2022 3:51 PM Created By Lilly Culver City_Use_Tax_-_FRR_Notice_to_Contractor__20220203.docx Last Modified 2/3/2022 3:40 PM Created By Lilly Culver Final UCP - Paid Receipt. 1322 Snowbunny Ln.20211215 Last Modified 12/16/2021 12:35 PM Created By Phil LeHue 1322 SNOWBUNNY LN_C-19-090_Final Last Modified 11/19/2021 2:06 PM Created By Phil LeHue 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 9/23 1322 Snowbunny ln - 0291.2018.ARBK _ TCO Final Last Modified 1/5/2021 10:51 AM Created By Lilly Culver 1322_UCP_Water_Final Last Modified 12/8/2020 1:05 PM Created By Aaron Reed 0291.2018.arbk inspections Last Modified 1/16/2020 10:25 AM Created By Sophie Varga IRC_TCO_Letter__20201222.docx Last Modified 12/22/2020 9:07 AM Created By Lilly Culver APPROVAL_NOTICE_COVID- 19_SITE_SAFETY_PLAN__20200427.pdf Last Modified 4/27/2020 11:54 AM Created By MITCH MILLER 0291.2018.arbk fees Last Modified 1/16/2020 10:25 AM Created By Sophie Varga Inspections INS-0000903-20 Status Pass/Accepted Type Parks Subtype Requested Date Scheduled Start Date Completed Date 12/22/2020 Owner Last Name Radeck Permit Inspection Round Initial Inspection Closed TRUE INS-0000906-20 Status Failed/Rejected Type APECC Subtype In-Floor Heat Requested Date 3/24/2020 10:30 AM Scheduled Start Date 3/24/2020 Completed Date 3/24/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0000908-20 Status Pass/Accepted Type Concrete Subtype Footings Requested Date 5/27/2020 10:00 AM Scheduled Start Date 5/27/2020 Completed Date 5/27/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0000909-20 Status Pass/Accepted Type Concrete Subtype Piers Requested Date 7/7/2020 9:00 AM Scheduled Start Date 7/7/2020 Completed Date 7/7/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0000910-20 Status Pass/Accepted Type Concrete Subtype Pads Requested Date 5/8/2020 8:30 AM Scheduled Start Date 5/8/2020 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 10/23 Completed Date 5/8/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0000911-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 3/9/2020 1:00 PM Scheduled Start Date 3/9/2020 Completed Date 3/9/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0000920-20 Status Partial/Non-Complete Type APECC Subtype Radon Requested Date 3/6/2020 11:00 AM Scheduled Start Date 3/6/2020 Completed Date 3/6/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0000924-20 Status Re-Inspection Required Type Zoning Subtype Requested Date Scheduled Start Date 12/22/2020 Completed Date 12/22/2020 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0000928-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 7/7/2020 9:00 AM Scheduled Start Date 7/7/2020 Completed Date 7/7/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0000931-20 Status Pass/Accepted Type Fire Subtype Requested Date 12/31/2020 8:30 AM Scheduled Start Date Completed Date 12/31/2020 Owner Last Name Legersky Permit Inspection Round Final Inspection Closed TRUE INS-0006510-20 Status Re-Inspection Required Type Covid-19 Plan Review Subtype Requested Date 4/23/2020 2:00 PM 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 11/23 Scheduled Start Date 4/23/2020 Completed Date 4/24/2020 Owner Last Name MILLER Permit Inspection Round Final Inspection Closed TRUE INS-0004195-20 Status Pass/Accepted Type APECC Subtype Radon Requested Date 3/17/2020 12:37 PM Scheduled Start Date 3/18/2020 Completed Date 3/18/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0004307-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 3/18/2020 8:00 AM Scheduled Start Date 3/18/2020 Completed Date 3/18/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0004858-20 Status Pass/Accepted Type Building Subtype Rough Framing Requested Date 6/22/2020 9:00 AM Scheduled Start Date 6/22/2020 Completed Date 6/22/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0005179-20 Status Partial/Non-Complete Type APECC Subtype In-Floor Heat Requested Date 5/8/2020 8:00 AM Scheduled Start Date 5/8/2020 Completed Date 5/8/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0006830-20 Status Pass/Accepted Type Covid-19 Plan Review Subtype Requested Date 4/24/2020 2:41 PM Scheduled Start Date 4/27/2020 Completed Date 4/27/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0011467-20 Status Partial/Non-Complete Type Building Subtype Rough Framing 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 12/23 Requested Date 8/18/2020 11:30 AM Scheduled Start Date 8/18/2020 Completed Date 8/18/2020 Owner Last Name MILLER Permit Inspection Round Closed TRUE INS-0011664-20 Status Pass/Accepted Type Building Subtype Rough Framing Requested Date 9/14/2020 10:00 AM Scheduled Start Date 9/14/2020 Completed Date 9/14/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0012841-20 Status Pass/Accepted Type Parks Subtype Requested Date Scheduled Start Date Completed Date 12/22/2020 Owner Last Name Radeck Permit Inspection Round Final Inspection Closed TRUE INS-0012842-20 Status Accepted as Noted Type Water Efficient Landscaping Subtype Requested Date 12/31/2020 4:15 PM Scheduled Start Date Completed Date 1/4/2021 Owner Last Name Magill Permit Inspection Round Final Inspection Closed TRUE INS-0012844-20 Status Pass/Accepted Type Engineering Water Subtype Requested Date 12/2/2020 10:30 AM Scheduled Start Date Completed Date 12/10/2020 Owner Last Name Reed Permit Inspection Round Final Inspection Closed TRUE INS-0012845-20 Status Pass/Accepted Type Engineering Dev Subtype Requested Date 12/31/2020 11:00 AM Scheduled Start Date Completed Date 1/21/2021 Owner Last Name Danneberg Permit Inspection Round Final Inspection Closed TRUE INS-0012846-20 Status Accepted as Noted Type Engineering Erosion & Sediment 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 13/23 Subtype Requested Date 12/23/2020 9:30 AM Scheduled Start Date Completed Date 1/26/2021 Owner Last Name Reed Permit Inspection Round Final Inspection Closed TRUE INS-0013259-20 Status Pass/Accepted Type Sanitation Subtype Requested Date Scheduled Start Date Completed Date 12/10/2020 Owner Last Name Strait Permit Inspection Round Final Inspection Closed TRUE INS-0016626-20 Status Pass/Accepted Type APECC Subtype Radon Requested Date 12/10/2020 11:00 AM Scheduled Start Date 12/10/2020 Completed Date 12/10/2020 Owner Last Name Feder Permit Inspection Round Closed TRUE INS-0000809-21 Status Re-Inspection Required Type Building Subtype Final Building Requested Date 1/13/2022 10:30 AM Scheduled Start Date 1/13/2022 Completed Date 1/13/2022 Owner Last Name Bennett Permit Inspection Round Final Inspection Closed TRUE INS-0006698-21 Status Pass/Accepted Type Water Efficient Landscaping Subtype Requested Date 10/7/2021 2:52 PM Scheduled Start Date Completed Date 10/7/2021 Owner Last Name Magill Permit Inspection Round Final Inspection Closed TRUE INS-0007332-21 Status Closed - Not Needed Type Water Efficient Landscaping Subtype Requested Date Scheduled Start Date Completed Date 12/8/2021 Owner Last Name Magill Permit Inspection Round Final Inspection Closed TRUE INS-0007333-21 Status Pass/Accepted 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 14/23 Type Engineering Erosion & Sediment Subtype Requested Date 12/10/2021 3:27 PM Scheduled Start Date Completed Date 12/13/2021 Owner Last Name Reed Permit Inspection Round Final Inspection Closed TRUE INS-0007334-21 Status Pass/Accepted Type Sanitation Subtype Requested Date Scheduled Start Date Completed Date 11/29/2021 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0007335-21 Status Pass/Accepted Type Parks Subtype Requested Date Scheduled Start Date Completed Date 11/23/2021 Owner Last Name Radeck Permit Inspection Round Final Inspection Closed TRUE INS-0007336-21 Status Pass/Accepted Type Engineering Water Subtype Requested Date 12/9/2021 3:24 PM Scheduled Start Date Completed Date 12/13/2021 Owner Last Name Reed Permit Inspection Round Final Inspection Closed TRUE INS-0007337-21 Status Pass/Accepted Type Engineering Dev Subtype Requested Date 12/10/2021 1:07 PM Scheduled Start Date Completed Date 12/23/2021 Owner Last Name Danneberg Permit Inspection Round Final Inspection Closed TRUE INS-0007338-21 Status Pass/Accepted Type Utilities Subtype Requested Date 12/10/2021 10:00 AM Scheduled Start Date Completed Date 12/17/2021 Owner Last Name Gregor Permit Inspection Round Final Inspection Closed TRUE INS-0007340-21 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 15/23 Status Failed/Rejected Type Zoning Subtype Requested Date 12/9/2021 9:00 AM Scheduled Start Date 12/9/2021 Completed Date 12/10/2021 Owner Last Name Varga Permit Inspection Round Final Inspection Closed TRUE INS-0007341-21 Status Pass/Accepted Type Fire Subtype Requested Date 12/9/2021 11:00 AM Scheduled Start Date Completed Date 12/13/2021 Owner Last Name Legersky Permit Inspection Round Final Inspection Closed TRUE INS-0007642-21 Status Failed/Rejected Type Zoning Subtype Requested Date 12/23/2021 4:00 PM Scheduled Start Date Completed Date 12/23/2021 Owner Last Name Varga Permit Inspection Round Re-Inspection Closed TRUE INS-0008156-21 Status Re-Inspection Required Type Zoning Subtype Requested Date 12/29/2021 5:06 PM Scheduled Start Date Completed Date 12/29/2021 Owner Last Name Varga Permit Inspection Round Re-Inspection Closed TRUE INS-0008173-22 Status Pass/Accepted Type Zoning Subtype Requested Date Scheduled Start Date Completed Date 1/7/2022 Owner Last Name Varga Permit Inspection Round Re-Inspection Closed TRUE INS-0000187-22 Status Pass/Accepted Type Building Subtype Final Building Requested Date 1/24/2022 10:00 AM Scheduled Start Date 1/24/2022 Completed Date 1/24/2022 Owner Last Name Bennett Permit Inspection Round Re-Inspection Closed TRUE 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 16/23 INS-0006187-22 Status Pending Type Building & Referral Inspection Status Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE MEP Permit Inspections INS-0003449-20 Type Plumbing Subtype Final Plumbing Status Pass/Accepted Permit 0016-2020-PLUM Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0003450-20 Type Plumbing Subtype Plumbing Gas Pipe Status Pass/Accepted Permit 0016-2020-PLUM Due Date Priority 2 Normal Owner Alias TParr Closed TRUE INS-0003452-20 Type Plumbing Subtype Plumbing Gas Pipe Status Partial/Non-Complete Permit 0016-2020-PLUM Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0003453-20 Type Plumbing Subtype Plumbing Waste & Vent Status Pass/Accepted Permit 0016-2020-PLUM Due Date Priority 2 Normal Owner Alias TParr Closed TRUE INS-0003454-20 Type Plumbing Subtype Check For Plumbing Status Re-Inspection Required Permit 0016-2020-PLUM Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0003455-20 Type Plumbing Subtype Plumbing Water Pipe 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 17/23 Status Pass/Accepted Permit 0016-2020-PLUM Due Date Priority 2 Normal Owner Alias TParr Closed TRUE INS-0008601-20 Type Mechanical Subtype Mechanical Gas log Status Pass/Accepted Permit 0110-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0008602-20 Type Mechanical Subtype Rough Mechanical Status Pass/Accepted Permit 0110-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0008673-20 Type Mechanical Subtype Final Mechanical Status Pass/Accepted Permit 0110-2020-MECH Due Date 12/31/2020 Priority 2 Normal Owner Alias MEPs - Inspection Closed TRUE INS-0009196-20 Type Electric Subtype Permanent Service Status Pass/Accepted Permit 0094-2020-ELEC Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0009198-20 Type Electric Subtype Underground Status Partial/Non-Complete Permit 0094-2020-ELEC Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0009199-20 Type Electric Subtype Final Electrical Status Pass/Accepted Permit 0094-2020-ELEC Due Date Priority 2 Normal Owner Alias MMill 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 18/23 Closed TRUE INS-0010486-20 Type Mechanical Subtype Mechanical Ventilation Status Pass/Accepted Permit 0141-2020-MECH Due Date 12/31/2020 Priority 2 Normal Owner Alias MEPs - Inspection Closed TRUE INS-0010535-20 Type Mechanical Subtype Final Mechanical Status Pass/Accepted Permit 0141-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0013166-20 Type Electric Subtype Rough Electrical Status Pass/Accepted Permit 0149-2020-ELEC Due Date Priority 2 Normal Owner Alias BClin Closed TRUE INS-0013171-20 Type Electric Subtype Final Electrical Status Pass/Accepted Permit 0149-2020-ELEC Due Date Priority 2 Normal Owner Alias BClin Closed TRUE INS-0014995-20 Type Plumbing Subtype Plumbing Gas Pipe Status Re-Inspection Required Permit 0016-2020-PLUM Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0017344-20 Type Plumbing Subtype Plumbing Gas Tag Status Pass/Accepted Permit 0016-2020-PLUM Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0004310-21 Type Mechanical 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 19/23 Subtype Rough Mechanical Status Partial/Non-Complete Permit 0110-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0005071-21 Type Electric Subtype Final Electrical Status Pass/Accepted Permit 0122-2021-ELEC Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE Milestones Review Round 1 - 0291.2018.ARBK Status Approved Due Date Created Date 1/16/2020 Permit History 12/2/2024 3:30 PM User Fernando Cruz Action Changed Owner from Lilly Culver to Fernando Cruz. Related Permits 0058.2019.afsr Type Fire Address 1322 SNOWBUNNY LN Work Type New Status Closed - Final Applicant PETER MAZEN Issue Date 6/5/2019 Last Activity Date 0016-2020-PLUM Type Plumbing Address 1322 SNOWBUNNY LN Work Type New Status Closed - Final Applicant RICHARD COLLER Issue Date 2/25/2020 Last Activity Date 12/21/2020 0024-2020-ELEC Type Electrical Address 1322 SNOWBUNNY LN Work Type New Status Cancelled Applicant JUAN VIGIL Issue Date 3/11/2020 Last Activity Date 3/11/2020 0098-2020-MECH Type Mechanical Address 1322 SNOWBUNNY LN Work Type New Status Closed - Final Applicant JAKE HEUER Issue Date 6/17/2020 Last Activity Date 12/21/2020 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 20/23 0110-2020-MECH Type Mechanical Address 1322 SNOWBUNNY LN Work Type New Status Closed - Final Applicant LINDSEY LATHAM Issue Date 6/8/2020 Last Activity Date 6/1/2021 0094-2020-ELEC Type Electrical Address 1322 SNOWBUNNY LN Work Type New Status Closed - Final Applicant FEDERICO VALENZUELA Issue Date 6/18/2020 Last Activity Date 12/28/2020 0141-2020-MECH Type Mechanical Address 1322 SNOWBUNNY LN Work Type New Status Closed - Final Applicant MIKE TIERNEY Issue Date 7/20/2020 Last Activity Date 12/22/2021 0082-2020-BCHO Type Change Order Address 1322 SNOWBUNNY LN Work Type New Status Closed - Final Applicant MARTIN MATA Issue Date 3/17/2021 Last Activity Date 0149-2020-ELEC Type Electrical Address 1322 SNOWBUNNY LN Work Type New Status Closed - Final Applicant MITCHELL HAGAN Issue Date 9/22/2020 Last Activity Date 1/13/2022 0122-2021-ELEC Type Electrical Address 1322 SNOWBUNNY LN Work Type New Status Closed - Final Applicant FEDERICO VALENZUELA Issue Date 6/1/2021 Last Activity Date 7/13/2021 0071-2021-BCHO Type Change Order Address 1322 SNOWBUNNY LN Work Type New Status Closed - Final Applicant MARTIN MATA Issue Date 11/16/2021 Last Activity Date 11/16/2021 Reviews REV-010884 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 21/23 Milestone Review Round 1 - 0291.2018.ARBK Status Approved Type Parks Due Date Completed Date 1/16/2020 10:59 AM Owner Alias DRade On Hold Created Date 1/16/2020 REV-010885 Milestone Review Round 1 - 0291.2018.ARBK Status Approved Type Water Efficient Landscaping Due Date Completed Date 5/28/2019 11:00 AM Owner Alias rmagi On Hold Created Date 1/16/2020 REV-010886 Milestone Review Round 1 - 0291.2018.ARBK Status Approved Type Sanitation Due Date Completed Date 1/16/2020 11:00 AM Owner Alias Sanitation - Review On Hold Created Date 1/16/2020 REV-010887 Milestone Review Round 1 - 0291.2018.ARBK Status Approved Type Engineering Water Due Date Completed Date 6/3/2019 11:01 AM Owner Alias SWilson On Hold Created Date 1/16/2020 REV-010888 Milestone Review Round 1 - 0291.2018.ARBK Status Approved Type Engineering CMP Due Date Completed Date 5/20/2019 11:02 AM Owner Alias AReed On Hold Created Date 1/16/2020 REV-010889 Milestone Review Round 1 - 0291.2018.ARBK Status Approved Type Engineering Dev Due Date Completed Date 6/18/2019 11:03 AM Owner Alias JDann On Hold Created Date 1/16/2020 REV-010890 Milestone Review Round 1 - 0291.2018.ARBK Status Approved Type Engineering Erosion & Sediment Due Date 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 22/23 Completed Date 1/16/2020 11:03 AM Owner Alias AReed On Hold Created Date 1/16/2020 REV-010891 Milestone Review Round 1 - 0291.2018.ARBK Status Approved Type Fire Due Date Completed Date 3/11/2019 11:04 AM Owner Alias JHahn On Hold Created Date 1/16/2020 REV-010892 Milestone Review Round 1 - 0291.2018.ARBK Status Approved Type Zoning Due Date Completed Date 6/25/2019 11:04 AM Owner Alias SVarg On Hold Created Date 1/16/2020 REV-010893 Milestone Review Round 1 - 0291.2018.ARBK Status Approved Type Building Due Date Completed Date 1/16/2020 11:05 AM Owner Alias JHahn On Hold Created Date 1/16/2020 Submissions COVID Site Safety Plan - 1322 Snowbunny - SIGNED.pdf Actions Submission Date 4/23/2020 1:58 PM Status Pending Required Description Covid Site Safety Plan - 1322 Snowbunny - Updated.pdf Actions Submission Date 4/24/2020 2:39 PM Status Pending Required Description Covid Site Safety Plan - 1322 Snowbunny - Updated.pdf Actions Submission Date 4/27/2020 9:27 AM Status Pending Required Description Copyright © 2000-2024 salesforce.com, inc. All rights reserved. 12/2/24, 3:30 PM 0291.2018.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrtKAAS/p 23/23