Loading...
HomeMy WebLinkAboutMaster Permit.993 Moore Dr.0322.2017.ARBKClose Window Print This Page Expand All | Collapse All 0322.2017.ARBK Number 0322.2017.ARBK Record Type Building - Imported 993 MOORE DR Owner Fernando Cruz Original Number 74788 Status Closed - Final Type Building Reason for Cancel or Compl. Review Fail Applicant SHANE B EVANS STRUCTURAL ASSOCIATES COMPANY INC. Required Bond Amount Project Land Use Planning Application Permit Contractor STRUCTURAL ASSOCIATES COMPANY INC. Master Building Permit Valid Business License on Account Bluebeam Project Id 723-847-228 Imported HPC-ZON-EH-UTIL Review Required Submissions HPC-ZON-EH-UTIL Review-2 Documents Resubmitted Eng Review Eng-CMP Rev,Eng-Dev Rev,Util-Dev Maj,Eng-ES Rev,Util Rev,Eng-Wtr Rev, Parks-Prkng-San Review Parks Rev,Parks Fee,Water-LSE Rev,San Rev, Conditional Inspections Parks Insp, Conditional Final Insp Eng-Dev Final,Eng-ES Final,Eng-Wtr Final,Util Final,Parks Final,Water-LSE Final,San Final, Action Items Hold Reason Major EDEN Conditional Flat Fee Formula FP,Applicant is a Nonprofit? Conditional Tiered Fee Formula Eligible for Small Lodge Program? Conditional Tiered SqFt Fee Formula MAR,Discount All Fees (%) Fee Discount Reason CO Status if Applicable In Laserfiche Address Aspen Internal? Account Total Available Bond Amount Is This Associated w/a Building Permit? Approved Covid-19 Plan Hold All Reviews Create Fees Create Fees 2 Utility Review Type Price Book CO/LOC? 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 1/30 Queue Score Queue Designation Queue Score 0 Milestone Current Days in City Hands Last Date Received from Applicant Milestone - Total Days in Applicant Hand Milestone - Total Days in City Hands Dates 11/22/2019 TCO Issuance Date Close/CO Issuance Date 11/12/2021 12/20/2017 Expiration Date 1/18/2022 8/31/2018 7/22/2021 Basic Information Description Applicant: Shane Evans Structural Associates Architect: Simon Elliot CCY NEW CONSTRUCTION OF SFR // JOHN // BLUEBEAM 723-847-228 Census Code 101 - Single Family Residences Use of Building Single Family Use Class Residential Class of Work New Job Location Address 993 MOORE DR, ASPEN : 273514111107 Lot 7 Site Address Display on Map Legal Description Historic Property?No 993 MOORE DR Historic District?No HPC - Planning - Zoning Details Zone District R-30 HOA/Covenant Is There an ADU?No HPC Certificate of Appropriateness? No ADU Sq Ft Work Involves a Land Use Approval? No Deed Restricted?No Located in a PD?Yes Milestone Current Days in Applicant Hand New Application Date Application Complete Date Application Accepted Date Issue Date Override Expiration Date Last Activity Date Interior Remodel Only Permit Comments Eden Address 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 2/30 # of Dwellings Yes Category of Zoning Fee Residential Yes Zoning Work Level Major Zoning Fee Yes Building Project Details $9,266,531.00 253,388 Reason for Valuation Change 16,690 11,547 16,690 0 11,547 0% 11,547 28,237 6,750 16,690 100% 11,547 Scope of Work Details Work Changes Building Footprint? Yes Yes Yes Located Within City Mall Boundaries? No No Adjacent to City Open Space? No Photovoltaic Installation Yes Impacts City Trails/Parks? No Yes Yes No Yes Change of Restaurant Ownership? No Prevents Access to Sewer Main? No No Sewer Easements Affected? No Building Description Code Editions 2015 IRC Required Special Inspections Energy Code Compliance Building Type (IRC) Total Snowmelt Sq Ft Construction Type VB Total Spa Sq Ft Occupancy Load Total Pool Sq Ft Adds/Changes Floor Area? Occupancy or Use Change? Work Affects Exterior of Building? Valuation Lot Size Sq. Ft. Soil Disturbance Sq Ft Unit Sq. Ft.Affected Area Sq Ft Building Footprint Sq Ft Existing Hardscape Footprint Sq Ft Sq Ft of Building Work Area Existing Hardscape % of Lot Building Fire Area Sq Ft Con Mit Sq Ft Total Utility Review Sq. Ft.Utility Review Sq Ft Total % of Interior being Altered New Sq. Ft. Work Affects Tree/Drip Line? Work Changes Fenestration/Thrml Envelop? Requires Asbestos Test? Work Adds/Removes/Changes Plumbing Fixt? Work Subject to Water Efficient L.O.? Restaurant/Food Service Involved? Involves Impact on Sewer? Affects Parking/Alleys/Loading? Other Code Editions 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 3/30 Fire Sprinkler Existing? Amount of Onsite Renewable Generation? Fire Sprinkler Required? Yes CO Description Fire Sprinkler Type Basement Fire Alarms Installed? 1st Floor # Wood Fireplaces 2nd Floor # Gas Log Fireplaces 3rd Floor # Gas Appliances Additional Open Text Field For Comments Financials $13,802.00 Total Payments $13,802.00 Total Balance $0.00 System Information Number 0322.2017.ARBK Community Visibility Created By Ruth Kinney, 7/27/2019 1:48 PM 0033s00000yMDOiAAO,0036A00000ZPoLhQAL,0033s000012SdVIAA0 IsTestData?Last Modified By Fernando Cruz, 12/1/2024 3:36 PM VIP Form Tool VIP Submitted VIP Template Status VIP Foreign Language VIP Form Template Permit Application Action Items View/Print Permit Link Attachment View GIS Map View Milestone Gantt Chart Activity History Email: Certificate of Occupancy 0322.2017.ARBK - 993 Moore Dr - Issued Type Billable Assigned To Renee Espinoza Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/19/2021 Days in Applicant's Hands Comments To: shane@structuralassoc.com CC: patrick@structuralassoc.com; phil@structuralassoc.com BCC: Attachment: 993 Moore Dr - 0322.2017.ARBK _ CO Final.pdf, 993 Moore - 0322.2017.ARBK - FRR to owner.pdf, 993 Moore - 0322.2017.ARBK - FRR to contractor.pdf, 1-City Final Return_Use Tax.pdf, 1- County Use Tax Final Return Template (PDF).pdf Total Fees Fees Due at Current Status Contact IDs 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 4/30 Subject: Certificate of Occupancy 0322.2017.ARBK - 993 Moore Dr - Issued Body: Good Afternoon, Please find attached the issued Certificate of Occupancy for the completed project at 993 Moore Dr. Additionally, please find attached the issued City use tax letters and tax reconciliation forms. Please distribute this information as necessary. If you have any questions please let us know. Kind regards, Lilly Culver Email: Certificate of Occupancy for 993 Moore Type Billable Assigned To Renee Espinoza Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/12/2021 Days in Applicant's Hands Comments To: shane@structuralassoc.com CC: BCC: Attachment: 993 Moore Dr - 0322.2017.ARBK _ CO Final.pdf, 993 Moore - 0322.2017.ARBK - FRR to owner.pdf, 993 Moore - 0322.2017.ARBK - FRR to contractor.pdf, 1-City Final Return_Use Tax.pdf, 1- County Use Tax Final Return Template (PDF).pdf Subject: Certificate of Occupancy for 993 Moore Body: Good Morning, Please find attached the certificate of occupancy and city use tax documents for 993 Moore. Warmest Regards, Lisa Guida Email: Certificate of Occupancy - 993 Moore Dr - 0322.2017.ARBK - Issued Type Billable Assigned To Renee Espinoza Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 5/5/2021 Days in Applicant's Hands Comments To: shane@structuralassoc.com CC: BCC: Attachment: Notice_to_Contractor_ 993 MOORE DR - 0322.2017.ARBK.pdf, City_Use_Tax_to_Owner_ 993 MOORE DR - 0322.2017.ARBK.pdf, 1-City Final Return_Use Tax.pdf, 1-County Use Tax Final Return Template (PDF).pdf, 993 Moore Dr - 0322.2017.ARBK _ CO Final.pdf Subject: Certificate of Occupancy - 993 Moore Dr - 0322.2017.ARBK - Issued Body: Good Morning, 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 5/30 Please find attached your issued Certificate of Occupancy for the completed project at 993 Moore Dr. Additionally you will find attached the Contractor's and the Owner of the property's City use tax letters and tax reconciliation forms. Please distribute these as necessary. If you have any questions or concerns please let us know. Kind regards Lilly Culver Email: Utility Connection Permit Final Type Billable Assigned To Steve Wilson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/22/2021 Days in Applicant's Hands Comments To: shane@structuralassoc.com CC: BCC: Attachment: UCP_Water_Final__20210322.docx.pdf Subject: Utility Connection Permit Final Body: Hello SHANE B EVANS, Attached is your review Utility Connection Permit for the completed project at 993 MOORE DR associated with permit #: 0322.2017.ARBK. After review, please print and have signed by owner and notarized. Once signed and notarized, please return with payment, if applicable, to the Finance Department window located on the first floor of City Hall at 130 S. Galena St. Please reach out with any questions or concerns. Thank you, Steve Wilson Email: 993 Moore Dr - Engineering Dev - TCO closeout Type Billable Assigned To Hailey Roedel - On Maternity Leave - please chatter @Kyla Smits Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/15/2021 Days in Applicant's Hands Comments To: shane@structuralassoc.com CC: Phil@structuralassoc.com; hailey.guglielmo@cityofaspen.com BCC: Attachment: 18066-MooreFamily-L7BG-As-Built-24X36-Color-Pg1-2-03-09-21_ENG COMMENTS.pdf Subject: 993 Moore Dr - Engineering Dev - TCO closeout Body: Phil, 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 6/30 A few minor comments on the asbuilt that need to be addressed. I have attached a marked up pdf. The asbuilt needs to show that the north pvc pipe ties in to the Silva Cell system. And the plan calls for riprap at the outfalls, the asbuilt needs to show these were installed. I also need a signed and notarized maintenance agreement from the property owner. The agreement template can be found here: https://www.cityofaspen.com/DocumentCenter/View/518/Stormwater- Maintenance-Agreement-PDF Once the above is addressed please upload documents to Salesforce and either email me or chatter me to let me know it's there. With these things incorporated I can then sign off on the Engineering Dev Inspection. Continue to work with Aaron Reed on the stabilization inspection component. Thanks. Hailey Guglielmo (970) 309-0771 Hailey Guglielmo, PE Project Manager Engineering Department 201 N Mill St. Ste 203 Aspen, CO 81611 p: 970.309-0771 Email: COVID-19 Safety Plan Approval Type Billable Assigned To Patrick Harris Out of Office for the season, message @TimRohe for help. Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/23/2020 Days in Applicant's Hands Comments To: shane@structuralassoc.com CC: BCC: Attachment: APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN__20200423.pdf Subject: COVID-19 Safety Plan Approval Body: Dear SHANE B EVANS, Thank you for submitting a COVID-19 Site Safety Plan for 0322.2017.ARBK at 993 MOORE DR. City staff has reviewed and approved the safety plan. Attached is the COVID-19 Approval Notice to re- commence construction. Please hang this Approval Notice on site so it is clearly visible for inspectors and law enforcement. Please adhere to all aspects of the plans to keep all employees and the community safe. Failure to adhere to the plan, as well as County requirements, will result in a site shut down. We thank you for your efforts to keep the community safe, and please let us know if you have any further questions. Email: Important! Your City of Aspen permit has been moved to new permitting system Type Billable Assigned To Rebecca Wallace Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/24/2019 Days in Applicant's Hands 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 7/30 Comments To: nomail@nomail.nm CC: BCC: Attachment: --none-- Subject: Important! Your City of Aspen permit has been moved to new permitting system Body: Dear SHANE B EVANS, As you may know, the City of Aspen has been transitioning to a new online-based permitting system, Salesforce. Thank you for your patience during this transition, which is now complete. Your permit is now operational in Salesforce. Your project located at 993 MOORE DR, ASPEN : 273514111107 will retain its original permit number, 0322.2017.ARBK and you will use this number to find your permit in Salesforce. If you have not already done so, you must register in Salesforce before you are able to access your permit information, upload new documents, request inspections, or otherwise track the status of your permit. Instructions on how to register and navigate the new permitting system can be found at this link: https://www.cityofaspen.com/1211/Salesforce-Applicant-Portal-Support TO REQUEST AN INSPECTION: You are no longer able to request an inspection via the old system. Instructions on how to request an inspection in Salesforce can be found at this link: https://www.cityofaspen.com/DocumentCenter/View/4254/Request-an-Inspection?bidId= If you have additional questions that are not addressed at the above links, you may reach out directly to City staff for assistance at sfsupport@cityofaspen.com. Sincerely, John Barker City of Aspen Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 10/8/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 7/29/2020 Days in Applicant's Hands Comments Permit Inspection 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 8/30 Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 5/23/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 2/4/2020 Days in Applicant's Hands Comments Conditions 0000257 Type Other Other Type Utility Development Review Fee Status Closed Date Resolved Last Modified Date 4/13/2021 Contacts Phillip Perry Account STRUCTURAL ASSOCIATES COMPANY INC. Type Contractor Active Contractor License Count 0.00 Number 0026552 Account STRUCTURAL ASSOCIATES COMPANY INC. Type Contractor Active Contractor License Count 0.00 Number 0011739 SHANE B EVANS Account STRUCTURAL ASSOCIATES COMPANY INC. Type Applicant Active Contractor License Count 0.00 Number 0022489 PATRICK GILSON Account STRUCTURAL ASSOCIATES COMPANY INC. Type Contractor Active Contractor License Count 0.00 Number 0028264 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 9/30 Fees 0044379 Type Utilities Development Review Fee Total $13,802.00 Waived/Refunded Amt Discount $ Outstanding $0.00 Fee Due At Ready for Closure; Issued Show in Cart Paid in Full Fee Paid Date/Time 0068961 Type Use Tax Deposit - City of Aspen Total $96,248.58 Waived/Refunded Amt $96,248.58 Discount $ Outstanding $0.00 Fee Due At Closed - Final Show in Cart Paid in Full Fee Paid Date/Time Files 993 Moore - 0322.2017.ARBK - FRR to owner Last Modified 11/12/2021 9:09 AM Created By Lisa Guida 993 Moore Dr - 0322.2017.ARBK _ CO Final Last Modified 11/12/2021 9:09 AM Created By Lisa Guida FW 993 Moore Drive Ski Easement from Ryan V Last Modified 6/16/2021 9:14 AM Created By David Radeck Notice_to_Contractor_ 993 MOORE DR - 0322.2017.ARBK Last Modified 5/5/2021 7:46 AM Created By Lilly Culver 1-City Final Return_Use Tax Last Modified 5/5/2021 7:45 AM Created By Lilly Culver City_Use_Tax_- __FRR_Transmittal_to_Owner__20210505.docx Last Modified 5/5/2021 7:40 AM Created By Lilly Culver IRC_TCO_Letter__20210330.docx Last Modified 3/30/2021 11:02 AM Created By Lilly Culver 993 Moore - 0322.2017.ARBK - FRR to contractor Last Modified 11/12/2021 9:09 AM Created By Lisa Guida RE 993 Moore Drive Ski Easement confirmation from Jim Korpela Last Modified 6/16/2021 9:46 AM Created By David Radeck City_Use_Tax_to_Owner_ 993 MOORE DR - 0322.2017.ARBK Last Modified 5/5/2021 7:47 AM Created By Lilly Culver 1-County Use Tax Final Return Template (PDF) Last Modified 5/5/2021 7:45 AM Created By Lilly Culver City_Use_Tax_- _FRR_Notice_to_Contractor__20210505.docx Last Modified 5/5/2021 7:40 AM Created By Lilly Culver 993 Moore Dr - 0322.2017.ARBK _ CO Final Last Modified 5/5/2021 7:39 AM Created By Lilly Culver 993 Moore Drive. FINAL Count Sheet Last Modified 3/22/2021 5:17 PM 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 10/30 993 Moore Drive. FINAL Count Sheet Last Modified 3/22/2021 1:44 PM Created By Steve Wilson 18066-MooreFamily-L7BG-As-Built-24X36-Color-Pg1-2- 03-09-21_ENG COMMENTS Last Modified 3/15/2021 1:11 PM Created By Hailey Roedel - On Maternity Leave - please chatter @Kyla Smits 0322.2017.ARBK inspections Last Modified 11/24/2019 5:44 AM Created By Rebecca Wallace Created By Steve Wilson UCP_Water_Final__20210322.docx Last Modified 3/22/2021 1:39 PM Created By Steve Wilson APPROVAL_NOTICE_COVID- 19_SITE_SAFETY_PLAN__20200423.pdf Last Modified 4/23/2020 12:44 PM Created By Patrick Harris Out of Office for the season, message @TimRohe for help. 0322.2017.ARBK fees Last Modified 11/24/2019 5:44 AM Created By Rebecca Wallace Inspections INS-0006307-19 Status Accepted as Noted Type Parks Subtype Requested Date 3/10/2021 11:40 AM Scheduled Start Date Completed Date 4/7/2021 Owner Last Name Radeck Permit Inspection Round Final Inspection Closed TRUE INS-0006312-19 Status Pass/Accepted Type Concrete Subtype Footings Requested Date 7/24/2020 9:30 AM Scheduled Start Date 7/24/2020 Completed Date 7/24/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0006319-19 Status Partial/Non-Complete Type Building Subtype Special Insp. Requested Date 8/10/2020 9:00 AM Scheduled Start Date 8/10/2020 Completed Date 8/10/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0006323-19 Status Partial/Non-Complete Type APECC Subtype Snowmelt 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 11/30 Requested Date 10/7/2020 1:00 PM Scheduled Start Date 10/7/2020 Completed Date 10/7/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0006326-19 Status Pass/Accepted Type Concrete Subtype Walls Requested Date 7/29/2020 9:30 AM Scheduled Start Date 7/29/2020 Completed Date 7/29/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0006328-19 Status Accepted as Noted Type Zoning Subtype Requested Date 3/10/2021 11:53 AM Scheduled Start Date 3/12/2021 Completed Date 3/12/2021 Owner Last Name Pomeroy Permit Inspection Round Final Inspection Closed TRUE INS-0006329-19 Status Pass/Accepted Type APECC Subtype Spa Requested Date 9/14/2020 10:00 AM Scheduled Start Date 9/14/2020 Completed Date 9/14/2020 Owner Last Name Parry Permit Inspection Round Initial Inspection Closed TRUE INS-0006332-19 Status Pass/Accepted Type APECC Subtype Insulation Requested Date 5/22/2020 9:30 AM Scheduled Start Date 5/22/2020 Completed Date 5/22/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0006333-19 Status Pass/Accepted 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 12/30 Type Electric Subtype Underground Requested Date 7/8/2020 12:00 PM Scheduled Start Date 7/9/2020 Completed Date 7/9/2020 Owner Last Name Parry Permit Inspection Round Initial Inspection Closed TRUE INS-0006334-19 Status Partial/Non-Complete Type Concrete Subtype Structural Slabs Requested Date 2/4/2020 7:08 AM Scheduled Start Date 2/4/2020 Completed Date 2/4/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0006335-19 Status Pass/Accepted Type Fire Subtype Requested Date 3/10/2021 5:13 PM Scheduled Start Date Completed Date 3/9/2021 Owner Last Name Legersky Permit Inspection Round Final Inspection Closed TRUE INS-0013930-20 Status Closed - Not Needed Type Water Efficient Landscaping Subtype Requested Date 3/10/2021 5:12 PM Scheduled Start Date Completed Date 3/22/2021 Owner Last Name Magill Permit Inspection Round Final Inspection Closed TRUE INS-0013931-20 Status Pass/Accepted Type Sanitation Subtype Requested Date 3/3/2021 10:00 AM Scheduled Start Date Completed Date 3/10/2021 Owner Last Name Strait Permit Inspection Round Final Inspection Closed TRUE 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 13/30 INS-0013932-20 Status Pass/Accepted Type Engineering Water Subtype Requested Date 3/3/2021 10:00 AM Scheduled Start Date Completed Date 3/18/2021 Owner Last Name Wilson Permit Inspection Round Final Inspection Closed TRUE INS-0013933-20 Status Pass/Accepted Type Engineering Dev Subtype Requested Date 3/11/2021 9:47 AM Scheduled Start Date Completed Date 3/18/2021 Owner Last Name Roedel - On Maternity Leave - please chatter @Kyla Smits Permit Inspection Round Final Inspection Closed TRUE INS-0013934-20 Status Accepted as Noted Type Engineering Erosion & Sediment Subtype Requested Date Scheduled Start Date Completed Date 4/8/2021 Owner Last Name Reed Permit Inspection Round Final Inspection Closed TRUE INS-0002663-21 Status Pass/Accepted Type Engineering Water Subtype Requested Date Scheduled Start Date Completed Date 3/22/2021 Owner Last Name Permit Inspection Round Re-Inspection Closed TRUE INS-0002866-21 Status Pass/Accepted Type Engineering Water Subtype Requested Date Scheduled Start Date Completed Date 4/12/2021 Owner Last Name Permit Inspection Round Re-Inspection 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 14/30 Closed TRUE INS-0003379-21 Status Pass/Accepted Type Building Subtype Final Building Requested Date 4/13/2021 10:00 AM Scheduled Start Date 4/13/2021 Completed Date 4/15/2021 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0004550-21 Status Pass/Accepted Type Engineering Erosion & Sediment Subtype Requested Date Scheduled Start Date Completed Date 7/12/2021 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0004552-21 Status Pass/Accepted Type Parks Subtype Requested Date 6/14/2021 9:00 AM Scheduled Start Date Completed Date 7/22/2021 Owner Last Name Radeck Permit Inspection Round Final Inspection Closed TRUE INS-0004557-21 Status Pass/Accepted Type Zoning Subtype Requested Date 6/14/2021 10:30 AM Scheduled Start Date Completed Date 6/16/2021 Owner Last Name Pomeroy Permit Inspection Round Final Inspection Closed TRUE MEP Permit Inspections INS-0006338-19 Type Plumbing Subtype Final Plumbing Status Pass/Accepted Permit 0011.2019.ASPL Due Date Priority 2 Normal Owner Alias steve f 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 15/30 Closed TRUE INS-0006342-19 Type Plumbing Subtype Plumbing Waste & Vent Status Accepted as Noted Permit 0011.2019.ASPL Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0006345-19 Type Fire Subtype Status Pass/Accepted Permit 0041.2019.afsr Due Date Priority 2 Normal Owner Alias jlage Closed TRUE INS-0006352-19 Type Mechanical Subtype Final Mechanical Status Pass/Accepted Permit 0054.2019.AMEC Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0006356-19 Type Fire Subtype Status Pass/Accepted Permit 0075.2019.afsr Due Date Priority 2 Normal Owner Alias jlage Closed TRUE INS-0006357-19 Type Electric Subtype Rough Electrical Status Partial/Non-Complete Permit 0099.2019.AELE Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0006359-19 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 16/30 Type Electric Subtype Permanent Service Status Accepted as Noted Permit 0099.2019.AELE Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0006360-19 Type Electric Subtype Special Electrical Status Partial/Non-Complete Permit 0099.2019.AELE Due Date Priority 2 Normal Owner Alias TParr Closed TRUE INS-0006361-19 Type Electric Subtype Underground Status Partial/Non-Complete Permit 0099.2019.AELE Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0006362-19 Type Electric Subtype Final Electrical Status Accepted as Noted Permit 0099.2019.AELE Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0006369-19 Type Electric Subtype Final Electrical Status Pass/Accepted Permit 0112.2019.AELE Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0006376-19 Type Electric Subtype Final Electrical Status Accepted as Noted 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 17/30 Permit 0185.2019.AELE Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0006380-19 Type Plumbing Subtype Final Plumbing Status Pass/Accepted Permit 0188.2018.ASPL Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0006412-19 Type Mechanical Subtype Mechanical Gas Pipe Status Pass/Accepted Permit 0291.2018.AMEC Due Date Priority 2 Normal Owner Alias TParr Closed TRUE INS-0006414-19 Type Mechanical Subtype Rough Mechanical Status Pass/Accepted Permit 0291.2018.AMEC Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0006415-19 Type Mechanical Subtype Mechanical Flues Status Failed/Rejected Permit 0291.2018.AMEC Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0006416-19 Type Mechanical Subtype Final Mechanical Status Pass/Accepted Permit 0291.2018.AMEC Due Date Priority 2 Normal 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 18/30 Owner Alias steve f Closed TRUE INS-0006419-19 Type Mechanical Subtype In-Floor Heat Status Partial/Non-Complete Permit 0291.2018.AMEC Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0002386-20 Type APECC Subtype Snowmelt Status Partial/Non-Complete Permit 0291.2018.AMEC Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0008495-20 Type Plumbing Subtype Final Plumbing Status Pass/Accepted Permit 0052-2020-PLUM Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0009609-20 Type Mechanical Subtype Rough Mechanical Status Pass/Accepted Permit 0291.2018.AMEC Due Date Priority 2 Normal Owner Alias TParr Closed TRUE INS-0010443-20 Type Electric Subtype Special Electrical Status Partial/Non-Complete Permit 0099.2019.AELE Due Date Priority 2 Normal Owner Alias MMill Closed TRUE 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 19/30 INS-0012179-20 Type APECC Subtype Snowmelt Status Partial/Non-Complete Permit 0291.2018.AMEC Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0014113-20 Type APECC Subtype Snowmelt Status Partial/Non-Complete Permit 0291.2018.AMEC Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0014508-20 Type APECC Subtype Snowmelt Status Partial/Non-Complete Permit 0291.2018.AMEC Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0016080-20 Type Mechanical Subtype Mechanical Flues Status Partial/Non-Complete Permit 0223-2020-MECH Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0016082-20 Type Mechanical Subtype Mechanical Gas log Status Pass/Accepted Permit 0223-2020-MECH Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0016189-20 Type Mechanical Subtype Final Mechanical 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 20/30 Status Pass/Accepted Permit 0223-2020-MECH Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0002200-21 Type Plumbing Subtype Final Plumbing Status Pass/Accepted Permit 0025-2021-PLUM Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0000266-22 Type Electric Subtype Rough Electrical Status Pass/Accepted Permit 0188.2019.AELE Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE Milestones Review Round 1 - 0322.2017.ARBK Status Approved Due Date Created Date 11/24/2019 Payments PY-008617 Related To 0322.2017.ARBK Amount $13,802.00 Created Date 4/20/2021 Payment Source R-0008255 Receipt - Amount Remaining R-0008255: $0 Permit History 12/1/2024 3:36 PM User Fernando Cruz Action Changed Owner from Lisa Guida to Fernando Cruz. Related Permits 0197.2018.AELE Type Electrical Address 993 MOORE DR Work Type New Status Closed - Final Applicant Kevin Messerschmidt Issue Date 9/5/2018 Last Activity Date 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 21/30 0099.2019.AELE Type Electrical Address 993 MOORE DR Work Type New Status Closed - Final Applicant Kevin Messerschmidt Issue Date 6/5/2019 Last Activity Date 3/19/2021 0112.2019.AELE Type Electrical Address 993 MOORE DR Work Type New Status Closed - Final Applicant DAVID RAIFE Issue Date 6/26/2019 Last Activity Date 3/9/2021 0041.2019.afsr Type Fire Address 993 MOORE DR Work Type New Status Closed - Final Applicant PETER MAZEN Issue Date 5/6/2019 Last Activity Date 3/15/2021 0075.2019.afsr Type Fire Address 993 MOORE DR Work Type New Status Closed - Final Applicant DENIS YEAGER Issue Date 7/23/2019 Last Activity Date 3/15/2021 0291.2018.AMEC Type Mechanical Address 993 MOORE DR Work Type New Status Closed - Final Applicant KALEN MAULDIN Issue Date 12/11/2018 Last Activity Date 3/2/2021 0054.2019.AMEC Type Mechanical Address 993 MOORE DR Work Type New Status Closed - Final Applicant ED VANDEVENTER Issue Date 4/3/2019 Last Activity Date 2/23/2021 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 22/30 0188.2018.ASPL Type Plumbing Address 993 MOORE DR Work Type New Status Closed - Final Applicant KALEN MAULDIN Issue Date 12/11/2018 Last Activity Date 3/2/2021 0011.2019.ASPL Type Plumbing Address 993 MOORE DR Work Type New Status Closed - Final Applicant KALEN MAULDIN Issue Date 11/24/2019 Last Activity Date 4/12/2021 19-1538 Type Electrical Address 993 MOORE DR Work Type New Status Cancelled Applicant BAILEY MATTHEWS Issue Date Last Activity Date 0192.2019.ARBK Type Change Order Address 993 MOORE DR Work Type New Status Closed - Final Applicant Issue Date 11/24/2019 Last Activity Date 0185.2019.AELE Type Electrical Address 993 MOORE DR Work Type New Status Closed - Final Applicant KYLER CARJE Issue Date 10/22/2019 Last Activity Date 3/10/2021 0188.2019.AELE Type Electrical Address 993 MOORE DR Work Type New Status Closed - Final Applicant BAILEY MATTHEWS Issue Date 12/24/2019 Last Activity Date 1/24/2022 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 23/30 0052-2020-PLUM Type Plumbing Address 993 MOORE DR Work Type New Status Closed - Final Applicant ROBERT DONNELLY Issue Date 6/19/2020 Last Activity Date 4/8/2021 0223-2020-MECH Type Mechanical Address 993 MOORE DR Work Type New Status Closed - Final Applicant RYAN PRIEST Issue Date 11/17/2020 Last Activity Date 4/14/2021 0025-2021-PLUM Type Plumbing Address 993 MOORE DR Work Type New Status Closed - Final Applicant ROBERT DONNELLY Issue Date 3/12/2021 Last Activity Date 3/30/2021 Reviews REV-009308 Milestone Review Round 1 - 0322.2017.ARBK Status Approved Type Parks Due Date Completed Date 11/24/2019 5:29 AM Owner Alias DRade On Hold Created Date 11/24/2019 REV-009309 Milestone Review Round 1 - 0322.2017.ARBK Status Approved Type Water Efficient Landscaping Due Date Completed Date 11/24/2019 5:32 AM Owner Alias rmagi On Hold Created Date 11/24/2019 REV-009310 Milestone Review Round 1 - 0322.2017.ARBK Status Approved Type Sanitation Due Date Completed Date 11/24/2019 5:37 AM 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 24/30 Owner Alias JBark On Hold Created Date 11/24/2019 REV-009311 Milestone Review Round 1 - 0322.2017.ARBK Status Approved Type Engineering Water Due Date Completed Date 11/24/2019 5:28 AM Owner Alias SWilson On Hold Created Date 11/24/2019 REV-009312 Milestone Review Round 1 - 0322.2017.ARBK Status Approved Type Engineering CMP Due Date Completed Date 11/24/2019 5:35 AM Owner Alias PHarr On Hold Created Date 11/24/2019 REV-009313 Milestone Review Round 1 - 0322.2017.ARBK Status Approved Type Engineering Dev Due Date Completed Date 11/24/2019 5:25 AM Owner Alias JForm On Hold Created Date 11/24/2019 REV-009314 Milestone Review Round 1 - 0322.2017.ARBK Status Approved Type Engineering Erosion & Sediment Due Date Completed Date 11/24/2019 5:33 AM Owner Alias AReed On Hold Created Date 11/24/2019 REV-009315 Milestone Review Round 1 - 0322.2017.ARBK Status Approved Type Fire Due Date Completed Date 11/24/2019 5:31 AM Owner Alias BMuhi On Hold Created Date 11/24/2019 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 25/30 REV-009316 Milestone Review Round 1 - 0322.2017.ARBK Status Approved Type Zoning Due Date Completed Date 11/24/2019 5:23 AM Owner Alias Zoning - Review On Hold Created Date 11/24/2019 REV-009317 Milestone Review Round 1 - 0322.2017.ARBK Status Approved Type Building Due Date Completed Date 11/24/2019 5:26 AM Owner Alias BMuhi On Hold Created Date 11/24/2019 Submissions COVID Site Safety Plan Revision.pdf Actions Submission Date 4/23/2020 9:42 AM Status Required Description COVID Site Safety Plan.pdf Actions Submission Date 4/22/2020 5:42 PM Status Required Description COVID Site Safety Plan.pdf Actions Submission Date 4/22/2020 6:47 PM Status Required Description 993 Moore Drive Lane Maintenance Plan 20210308.pdf Actions Submission Date 3/10/2021 9:54 AM Status Required Description 993 Moore Drive MEMO Asbuilt Drainage 20210308.pdf Actions Submission Date 3/10/2021 9:54 AM Status 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 26/30 Required Description 18066-MooreFamily-L7BG-As-Built-24X36-Color-Pg1-2-03-09-21.pdf Actions Submission Date 3/10/2021 9:54 AM Status Required Description 18066-MooreFamily-L7BG-ZoningCompliance-24X36-Color-03-05-21.pdf Actions Submission Date 3/10/2021 9:54 AM Status Required Description 2021.03.15 - 993 Moore Drive Maintenance Plan Agreement.pdf Actions Submission Date 3/16/2021 9:15 AM Status Required Description 18066-MooreFamily-L7BG-As-Built-24X36-Color-Pg1-03-17-21.pdf Actions Submission Date 3/18/2021 6:58 AM Status Required Description 18066-MooreFamily-L7BG-As-Built-24X36-Color-Pg2-03-17-21.pdf Actions Submission Date 3/18/2021 6:58 AM Status Required Description 0011.2019.ASPL _ Salesforce - Enterprise Edition.pdf Actions Submission Date 10/27/2021 6:03 AM Status Required Description 0025-2021-PLUM _ Salesforce - Enterprise Edition.pdf Actions Submission Date 10/27/2021 6:03 AM Status Required Description 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 27/30 0041.2019.afsr _ Salesforce - Enterprise Edition.pdf Actions Submission Date 10/27/2021 6:03 AM Status Required Description 0052-2020-PLUM _ Salesforce - Enterprise Edition.pdf Actions Submission Date 10/27/2021 6:03 AM Status Required Description 0054.2019.AMEC _ Salesforce - Enterprise Edition.pdf Actions Submission Date 10/27/2021 6:03 AM Status Required Description 0075.2019.afsr _ Salesforce - Enterprise Edition.pdf Actions Submission Date 10/27/2021 6:03 AM Status Required Description 0099.2019.AELE _ Salesforce - Enterprise Edition.pdf Actions Submission Date 10/27/2021 6:03 AM Status Required Description 0112.2019.AELE _ Salesforce - Enterprise Edition.pdf Actions Submission Date 10/27/2021 6:03 AM Status Required Description 0185.2019.AELE _ Salesforce - Enterprise Edition.pdf Actions Submission Date 10/27/2021 6:03 AM Status Required Description 0188.2018.ASPL _ Salesforce - Enterprise Edition.pdf Actions Submission Date 10/27/2021 6:03 AM 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 28/30 Status Required Description 0188.2019.AELE _ Salesforce - Enterprise Edition.pdf Actions Submission Date 10/27/2021 6:03 AM Status Required Description 0192.2019.ARBK _ Salesforce - Enterprise Edition.pdf Actions Submission Date 10/27/2021 6:03 AM Status Required Description 0197.2018.AELE _ Salesforce - Enterprise Edition.pdf Actions Submission Date 10/27/2021 6:03 AM Status Required Description 0223-2020-MECH _ Salesforce - Enterprise Edition.pdf Actions Submission Date 10/27/2021 6:03 AM Status Required Description 0291.2018.AMEC _ Salesforce - Enterprise Edition.pdf Actions Submission Date 10/27/2021 6:03 AM Status Required Description 0322.2017.ARBK _ Salesforce - Enterprise Edition.pdf Actions Submission Date 10/27/2021 6:03 AM Status Required Description 993 Moore Dr - 0322.2017.ARBK _ CO Final.pdf Actions Submission Date 11/12/2021 8:46 AM Status Required Description 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 29/30 Copyright © 2000-2024 salesforce.com, inc. All rights reserved. 12/1/24, 3:36 PM 0322.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdzAAC/p 30/30