HomeMy WebLinkAboutFile Documents.533 W Hallam St.0058-2020-BCHO (11)0285.2018.ARBK Description of work
Mechanical system has switched to a GeoThermal system. One sick tree was removed at the
request of the Parks Department allowing us to extend the patio by two rows of pavers where
that drip line was located. snowmelt increased into this paver area also. One door on the new
portion of the house changed from a full lite glass door to a dutch door. one light well got deeper
to accommodate mechanical air intake. some internal structural changes were made to
accommodate the mechanical systems.
08/12/2020