HomeMy WebLinkAboutFile Documents.533 W Hallam St.0058-2020-BCHO (12)0058-2020-BCHO_588 W Hallam_BuildingComment1
Subject: PlanCheck
Page: 1
Author: justinh
Color:
File Name: 30.2015 IECC REMP Calcuations.20200811.pdf
The change order permit number
is 0058-2020-BCHO
30.2015 IECC REMP Calcuations.20200811.pdf (3)
Subject: PlanCheck
Page: 1
Author: justinh
Color:
File Name: 30.2015 IECC REMP Calcuations.20200811.pdf
You did not include a copy of the
GSHP worksheet tab to show
how this mitigation credit was
calculated. Provide a .pdf of that
worksheet tab. Ensure that the
information entered on that tab
matches what is shown on the
geothermal plans.
Currently I don't see that the
geothermal plan has all the info
needed to fill that form out
properly. Be sure that
everything listed on the GSHP
cert tab is filled out and that your
plans and documents provide
everything listed in I-III on the
GSHP REMP tab.
I suggest also including an excel
file of the change order REMP
worksheet so that I can make
needed edits to help get any
REMP issues resolved without
additional rounds of comments.
Subject: PlanCheck
Page: 1
Author: justinh
Color:
File Name: 30.2015 IECC REMP Calcuations.20200811.pdf
Enter the amount you previously
paid on the master so that the
form can correctly calculate your
refund.
Subject: PlanCheck
Page: A410 LIGHT WELL PLANS & ELEVATIONS
Author: justinh
Color:
File Name: 90.ARCHITECTURAL CO #1.20200811.pdf
The grille is shown at two
different elevations in these
details, revise one or the other
so that the grille elevation is
shown consistently.
90.ARCHITECTURAL CO #1.20200811.pdf (1)
OJECT ADDRESS:
Parcel ID #: Permit Number:
TACT INFORMATION :er:Name:City:Aspen
Address:State:CO
Email:Zip Code:81611
Phone: Cell Phone:
er's Representative :
Name:City:Aspen
Address:State:Colorado
Email:Zip Code:81611
Phone: Cell Phone:`A.RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAMSheets showing snowmelt, pool, spa, and solar/GSHP information:
2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAMCity of Aspen Version 11.3 UpdAted deCember 13, 2017533 West Hallam Aspen CO 81611
2735-124-32-001
Wlewis@BillPoss.com
Duncan Skihaus, LLC
William Lewis
605 East Main Street
G010, G007
(970) 925-4755
533 West Hallam St.
cduncan@duncancap.com
(713) 266-5045
The change orderpermit number is0058-2020-BCHO
Zip Code:81611
Cell Phone:
City:Aspen
State:Colorado
Zip Code:81611
Cell Phone:
SIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAMwmelt, pool, spa, and solar/GSHP information:r a spa that has been exempted by the buiding official?Hydro Snowmelt Electric Snowmelt Pool Spa0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft1102.47 sqft 0.00 sqft 0.00 sqft 0.00 sqft36.00 sqft 0.00 sqft 0.00 sqft1138.47 sqft 0.00 sqft 0.00 sqft 0.00 sqft1138.47 sqft 0.00 sqft 0.00 sqft 0.00 sqft
95.0%100%95.0%95.0%-$ -$ Total Payment for Mitigation:39,456.82$ N-SITE RENEWABLE CREDITS Supplemental System REMP CreditUse PV WorksheetPhotovoltaic System -$ Use Thermal WorksheetHot Water Panels -$ Use GSHP CertGround Source Heat Pump 28,840.00$ Other Approved System -$ Total Mitigation Credits:28,840.00$ nsite Renewable Offsets:How many KiloWatts of PV (solar electric) would I need? 5.75or How many square feet of SHW (solar hot water) would I need?175.64
R-REMP Payment:10,616.82$ Amount Previously Paid on This Permit:10,616.82$ Refund (includes minus $750):-$ EPARED BY:Date:8/11/2020Print Name:
Signature:
Phone & EMail:
VIEWED:Date:
Wlewis@BillPoss.com
970 748 8520
TOTAL R-REMP PAYMENT:
William Lewis
1138.47 sqft
605 East Main Street
Bryan Urban
G010, G007
(970) 925-4755
$39,456.82
cduncan@duncancap.com
(713) 266-5045
Yes (enter sqft below on the exempt row)No You did not include a copy of the GSHPworksheet tab to show how this mitigationcredit was calculated. Provide a .pdf of thatworksheet tab. Ensure that the informationentered on that tab matches what is shown onthe geothermal plans.
Currently I don't see that the geothermal planhas all the info needed to fill that form outproperly. Be sure that everything listed on theGSHP cert tab is filled out and that your plansand documents provide everything listed inI-III on the GSHP REMP tab.
I suggest also including an excel file of thechange order REMP worksheet so that I canmake needed edits to help get any REMPissues resolved without additional rounds ofcomments.
Hydro Snowmelt Electric Snowmelt Pool SpaExisting0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqftTo be Demoed 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqftExisting to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqftNew (non-exempt)1102.47 sqft 0.00 sqft 0.00 sqft 0.00 sqftNew (exempt)36.00 sqft 0.00 sqft 0.00 sqftTotal New 1138.47 sqft 0.00 sqft 0.00 sqft 0.00 sqftTotal on site 1138.47 sqft 0.00 sqft 0.00 sqft 0.00 sqftTotal Snowmelt on siteBoiler Efficiency 95.0%100%95.0%95.0%Mitigation Payment -$ -$ Total Payment for Mitigation:39,456.82$ B.ON-SITE RENEWABLE CREDITS Supplemental System REMP CreditUse PV WorksheetPhotovoltaic System -$ Use Thermal WorksheetHot Water Panels -$ Use GSHP CertGround Source Heat Pump 28,840.00$ Other Approved System -$ Total Mitigation Credits:28,840.00$ Onsite Renewable Offsets:How many KiloWatts of PV (solar electric) would I need? 5.75or How many square feet of SHW (solar hot water) would I need?175.64
R-REMP Payment:10,616.82$ Amount Previously Paid on This Permit:10,616.82$ Refund (includes minus $750):-$
C. PREPARED BY:Date:8/11/2020
Print Name:
Signature:
Phone & EMail:REVIEWED:Date:970 748 8520
TOTAL R-REMP PAYMENT:
1138.47 sqft
Bryan Urban
$39,456.82
Enter the amount youpreviously paid on themaster so that theform can correctlycalculate your refund.
910
L
A4105
2LIGHTWELL
OPENING4' - 0"
A036
W-4
W-4
W-7
4
A4051
A4101213A06
A053LIGHTWELL
2"3' - 6"4"
4"
OPENING3' - 4"
4"
B W-4
W-7
2'X2' MIN. CLEAR OPENING MECHANICAL ACCESS HATCH.
L
3
A04
4LIGHTWELL
A4108
OPENING4' - 0"
9
W-4
W-7
EL
910
T.O.F.F. @ LOWER LEVEL86' - 10"
A03OPENING6' - 6"
2' - 0"
OPENING4' - 0"
3 1/2"2' - 6"1' - 2 1/2"
6"
5' - 9"
3"
FRAMED WALL W/ STUCCO FINISH
CONCRETE WALL W/ STUCCO FINISH
F-9
W-4 W-4
WOOD TRIM
WOOD TRIM
4
T.O.F.F. @ LOWER LEVEL86' - 10"
T.O. CONC.@ PERIMETER CRAWL83' - 5"
A06
5' - 5"
OPENING6' - 6"
3"
5' - 9"
6"
9"2' - 6"5"
FRAMED WALL W/ STUCCO FINSH
CONCRETE WALL W/ STUCCO FINISH
F-9
W-4 W-4
WOOD TRIM
WOOD TRIM
SIM
CLEAR2' - 0 3/4"
MECHANICAL ACCESSGRILLE
4"2"
C
T.O.F.F. @ LOWER LEVEL86' - 10"
T.O. CONC.@ PERIMETER CRAWL83' - 5"
5' - 5"
OPENING6' - 6"
4"OPENING3' - 4"4"8 1/8"2' - 6"1 7/8"
6"
5' - 9"
3"
A05
FRAMED WALL W/ STUCCO FINISH
CONCRETE WALL W/ STUCCO FINISH
CONCRETE WALL W/ STUCCO FINISH
F-9
B
W-4 W-4
WOOD TRIM
SIM
CLEAR2' - 0 3/4"MECHANICAL ACCESSGRILLE
3
T.O.F.F. @ LOWER LEVEL86' - 10"
OPENING6' - 6"
2' - 0"
A04
OPENING4' - 0"
9"2' - 6"9"
6"
5' - 9"
3"
FRAMED WALL W/ STUCCO FINISH
CONCRETE WALL W/ STUCCO FINISH
F-9
W-4 W-4
WOOD TRIM
WOOD TRIM
LK
T.O.F.F. @ LOWER LEVEL86' - 10"F-9
A03
FRAMED WALL W/ STUCCO FINISH
4' - 0"
CONCRETE WALL W/ STUCCO FINISH
W-7 W-4
2' - 0"
OPENING6' - 6"
3"
5' - 9"
6"WOOD TRIM
WOOD TRIM
L K
T.O.F.F. @ LOWER LEVEL86' - 10"
3"
5' - 9"
6"
OPENING6' - 6"
2' - 0"F-9
4' - 0"
FRAMED WALL W/ STUCCO FINISH
CONCRETE WALL W/ STUCCO FINISHW-7W-4
WOOD TRIM
4
A4051
A4101213
B W-4
MECHANICAL GRILLE
Consultant
ARCHITECTUREPLANNING+
( T ) 9 7 0 / 9 2 5 4 7 5 5 ( F ) 9 7 0 / 9 2 0 2 9 5 06 0 5 E A S T M A I N S T R E E T, A S P E N, C O L O R A D O 8 1 6 1 1
SHEET TITLE
BILL POSS AND ASSOCIATES,ARCHITECTURE AND PLANNING, P.C.THE INFORMATION AND DESIGN INTENT CONTAINED ON THIS DOCUMENT IS THEPROPERTY OF BILL POSS AND ASSOCIATES, ARCHITECTURE AND PLANNING, P.C.NO PART OF THIS INFORMATION MAY BE USED WITHOUT THE PRIOR WRITTENPERMISSION OF BILL POSS AND ASSOCIATES, ARCHITECTURE AND PLANNING, P.C.BILL POSS AND ASSOCIATES, ARCHITECTURE AND PLANNING, P.C. SHALL RETAINALL COMMON LAW STATUTORY AND OTHER RESERVED RIGHTS, INCLUDINGCOPYRIGHT THERETO.
c2020
PROJECT NO:
Issue:
DUNCAN RESIDENCE
533 W HALLAM ST ASPEN, CO 81611
A410
LIGHT WELL PLANS &ELEVATIONS
21708.00
SCALE1/2" = 1'-0"4LIGHT WELL 2 PLAN SCALE1/2" = 1'-0"10LIGHT WELL 4 PLAN
SCALE1/2" = 1'-0"7 LIGHT WELL 3 PLAN
SCALE1/2" = 1'-0"5LIGHT WELL 2 - WEST
SCALE1/2" = 1'-0"12LIGHT WELL 4 - EAST
SCALE1/2" = 1'-0"13LIGHT WELL 4 - NORTH
SCALE1/2" = 1'-0"8 LIGHT WELL 3 - WEST
SCALE1/2" = 1'-0"6LIGHT WELL 2 NORTH SCALE1/2" = 1'-0"9 LIGHT WELL 3 SOUTH
SCALE1/2" = 1'-0"11LIGHT WELL 4 PLAN LOWER
15
15 15
15
5 05.28.2019 PRICING SET8 10.09.2019 COA COMMENTS RESPONSE11 01.08.2020 CHECK SET14 02.24.2020 PERMIT COMMENTS ROUND 215 05.15.2020 CHANGE ORDER #1
The grille is shown attwo different elevationsin these details, reviseone or the other sothat the grille elevationis shown consistently.
Permit Number Added
GSHP Worksheet Tab PDF and Excel
included
Additional information has been added
by Major Geothermal.
Previous paid amount included
The graphic on the sheet was updated to be shown in the proper location.
12/17/202012/22/2020
Used incorrect amt, I changed
on excel spreadsheet
Subject: PlanCheck
Page: [2] M110-M111
Author: justinh
Color:
File Name: 90.GEOTHERMAL CO#1.20200811.pdf
This table does not match what
is shown on the following plan.
Revise you plans so that
geothermal info is shown
consistently.
90.GEOTHERMAL CO#1.20200811.pdf (2)
Subject: PlanCheck
Page: [2] M110-M111
Author: justinh
Color:
File Name: 90.GEOTHERMAL CO#1.20200811.pdf
Remove not for construction
notes from all plans.
Subject: PlanCheck
Page: M-001 MECHANICAL LEGEND SPEC'S & SEQUENCE
Author: justinh
Color:
File Name: 90.MECHANICAL CO #1.20200811.pdf
Bubble all changes on the MEP
plans as is required for all
change order submittals.
90.MECHANICAL CO #1.20200811.pdf (1)
A1
MECHANICAL
ROOMA4
This table does notmatch what is shownon the following plan. Revise you plans sothat geothermal info isshown consistently.
COPYRIGHT 2018 A cNOT FOR CONSTRUCTION
SCAL
M-
GEO
SIT
1Remove not forconstruction notesfrom all plans.
Bubble all changes on the MEP
plans as is required for all change
order submittals.
Not For Construction Removed
Bubbles have been added to indicate
MEP Changes.
Both M-110 (Geothermal Site Plan) and M-112 (Geothermal Details) have been
corrected to have identical GHX detail tables describing 8 boreholes.
12/17/202012/22/2020
NOT REMOVED FROM
GEO PLANS