Loading...
HomeMy WebLinkAboutFile Documents.754 Moore Dr.0193.2019 (17).ARBK Page 1 of 1 MEMO Project: 21523.00 – Lot 12 (754 Moore Drive) Permit No.: 0034.2018.ARBK Subject: Supplemental Information for Building Comments 2 Date: 14 April 2020 To: John Barker, Lead Permit Coordinator From: Sara Upton, Rowland+Broughton Architecture & Urban Design Cc: Comment – Provide handrails at all stairs with more than 3 risers. 2015 IRC R311.7.8 Response – The 3 site stairs have been revised to have 3 risers and hence do not require the handrail. Please refer to the attached documents that illustrate this revision. Drawings – Civil: As requested, we are attaching the full set of Civil Documents for your records.  C6.0 o Revise BBQ patio drainage and grade o Revise steps from BBQ area to grass area (3 risers) o Revise grading at the grass area along the steps leading to the spa area o Revise steps from grass area to the spa/pool (3 risers) Landscape:  L3-02, L4-02, L6-02, L8-02, and L9-02 o Revised the site stairs at the grill area to have 3 risers o Revised the site stairs at the spa area to have 3 risers Comment - Outdoor Firepit - Install with clearances per manufacturer's instructions and must comply with manufacturer's installation instructions, including clearances to combustibles and structure. Response - The location of the outdoor firepit complies with the manufacture’s requirements. Please refer to the attached Firepit burner manufacturer manual. Documents - 103100-4.2 - Outdoor Fireplace Product Data Thank You, Sara Upton 04/15/2020