HomeMy WebLinkAboutFile Documents.754 Moore Dr.0034.2018 (33).ARBK
Page 1 of 3
MEMO
Project: 21523.00 – Lot 12 (754 Moore Drive)
Permit No.: 0034.2018.ARBK
Subject: Supplemental Information
Date: 16 August 2019
To: John Barker, Lead Permit Coordinator
From: Mark Hardeman, Rowland+Broughton Architecture & Urban Design
Cc:
Narrative of Revisions:
Drawings –
Landscape:
▪ L6-01
o Drawing was a place holder in Building Permit
o Drawing is active now with site lighting information added
▪ L6-02
o Drawing was a place holder in Building Permit
o Drawing is active now with site lighting information added
▪ L7-07
o Previous sheet L7-07 in now sheet L7-08
o New cable rail light details and landscape outlet box details
o Add site lighting notes
▪ L7-08
o Previous sheet L7-08 is now sheet L7-09
o Add site lighting notes
▪ L7-09
o Previous sheet L7-09 is now sheet L7-10
o Add site lighting notes
o Revise details to show client approved BBQ
▪ L7-10
o Previous sheet L7-10 is now sheet L7-11
o Add site lighting notes
o Revise detail 2
▪ L7-11
o Previous sheet L7-11 is now sheet L7-12
o Add site lighting notes
08/19/2019
▪ L7-12
o Previous sheet L7-12 is now sheet L7-13
o Elevation 2 updated with cable railing post size changes
o Add site lighting notes
▪ L7-13
o Previous sheet L7-13 is now sheet L7-14
o Elevation 3 and 4 updated with cable railing post size changes
o Add site lighting notes
▪ L7-14
o Section 4 updated with spa stair changes
o Add site lighting notes
Architectural:
▪ A2.1
o Revised layout of Pantry 118, Powder 119 and Mud 120
o Removed plumbing from Wet Bar 104
o Removed dish washer from Pantry 118
o Moved refrigerator and freezer from Pantry 118 to Kitchen 117
o Moved undercounter ice maker from Pantry 118 to Bar 104
▪ A2.1A
o Revised dimensions of Pantry 118, Powder 119 and Mud 120
▪ A2.1F
o Revised layout of Pantry 118, Powder 119 and Mud 120
▪ A3.0
o Revised lighting layout
o Added dimensions to locate lighting
o Added toe kick lighting in Powder and Bathrooms
o Added mirror lighting in Bathrooms
▪ A3.1
o Revised lighting layout
o Added dimensions to locate lighting
o Added toe kick lighting in Powder and Bathrooms
o Added mirror lighting in Bathrooms
▪ A3.2
o Revised lighting layout
o Added dimensions to locate lighting
o Added toe kick lighting in Powder and Bathrooms
o Added mirror lighting in Bathrooms
▪ A8.7
o New sheet
o Add lighting schedule
▪ A8.13
o New sheet
o Add hollow metal door and frame details
▪ A8.14
o New sheet
o Add hollow metal door and frame details
▪ A8.16
o New sheet
o Add interior door details
08/19/2019
▪ A8.17
o New sheet
o Add hollow metal door and frame details
Structural:
▪ S2.0
o Add column footing at Grid G north of Grid 1
▪ S2.1
o Add structure and notes between Grid F to G+ and Grid 1 to 4
▪ S4.17
o New sheet
o Add details
▪ S6.0
o Revise pool foundation plan
▪ S6.3
o New sheet
o Add pool foundation details
Electrical:
▪ E0.0
o Update sheet index
▪ E0.2
o Update panel information
▪ E1.1
o Add receptacles in landscape west of parking area
▪ E2.0
o Revise outlet locations
o Add note for USB outlet spec
▪ E2.1
o Revise outlet locations
o Add note for USB outlet spec
▪ E2.2
o Revise outlet locations
o Add note for USB outlet spec
▪ EL2.0
o New sheet
o Basement Level Lighting Control and Circuiting
▪ EL2.1
o New sheet
o Main Level Lighting Control and Circuiting
▪ EL2.2
o New sheet
o Upper Level Lighting Control and Circuiting
Thank You,
Mark Hardeman
08/19/2019