Loading...
HomeMy WebLinkAboutFile Documents.754 Moore Dr.0034.2018 (34).ARBK Page 1 of 3 MEMO Project: 21523.00 – Lot 12 (754 Moore Drive) Permit No.: 0034.2018.ARBK Subject: Supplemental Information Date: 16 August 2019 To: John Barker, Lead Permit Coordinator From: Mark Hardeman, Rowland+Broughton Architecture & Urban Design Cc: Narrative of Revisions: Drawings – Landscape: ▪ L6-01 o Drawing was a place holder in Building Permit o Drawing is active now with site lighting information added ▪ L6-02 o Drawing was a place holder in Building Permit o Drawing is active now with site lighting information added ▪ L7-07 o Previous sheet L7-07 in now sheet L7-08 o New cable rail light details and landscape outlet box details o Add site lighting notes ▪ L7-08 o Previous sheet L7-08 is now sheet L7-09 o Add site lighting notes ▪ L7-09 o Previous sheet L7-09 is now sheet L7-10 o Add site lighting notes o Revise details to show client approved BBQ ▪ L7-10 o Previous sheet L7-10 is now sheet L7-11 o Add site lighting notes o Revise detail 2 ▪ L7-11 o Previous sheet L7-11 is now sheet L7-12 o Add site lighting notes 08/19/2019 ▪ L7-12 o Previous sheet L7-12 is now sheet L7-13 o Elevation 2 updated with cable railing post size changes o Add site lighting notes ▪ L7-13 o Previous sheet L7-13 is now sheet L7-14 o Elevation 3 and 4 updated with cable railing post size changes o Add site lighting notes ▪ L7-14 o Section 4 updated with spa stair changes o Add site lighting notes Architectural: ▪ A2.1 o Revised layout of Pantry 118, Powder 119 and Mud 120 o Removed plumbing from Wet Bar 104 o Removed dish washer from Pantry 118 o Moved refrigerator and freezer from Pantry 118 to Kitchen 117 o Moved undercounter ice maker from Pantry 118 to Bar 104 ▪ A2.1A o Revised dimensions of Pantry 118, Powder 119 and Mud 120 ▪ A2.1F o Revised layout of Pantry 118, Powder 119 and Mud 120 ▪ A3.0 o Revised lighting layout o Added dimensions to locate lighting o Added toe kick lighting in Powder and Bathrooms o Added mirror lighting in Bathrooms ▪ A3.1 o Revised lighting layout o Added dimensions to locate lighting o Added toe kick lighting in Powder and Bathrooms o Added mirror lighting in Bathrooms ▪ A3.2 o Revised lighting layout o Added dimensions to locate lighting o Added toe kick lighting in Powder and Bathrooms o Added mirror lighting in Bathrooms ▪ A8.7 o New sheet o Add lighting schedule ▪ A8.13 o New sheet o Add hollow metal door and frame details ▪ A8.14 o New sheet o Add hollow metal door and frame details ▪ A8.16 o New sheet o Add interior door details 08/19/2019 ▪ A8.17 o New sheet o Add hollow metal door and frame details Structural: ▪ S2.0 o Add column footing at Grid G north of Grid 1 ▪ S2.1 o Add structure and notes between Grid F to G+ and Grid 1 to 4 ▪ S4.17 o New sheet o Add details ▪ S6.0 o Revise pool foundation plan ▪ S6.3 o New sheet o Add pool foundation details Electrical: ▪ E0.0 o Update sheet index ▪ E0.2 o Update panel information ▪ E1.1 o Add receptacles in landscape west of parking area ▪ E2.0 o Revise outlet locations o Add note for USB outlet spec ▪ E2.1 o Revise outlet locations o Add note for USB outlet spec ▪ E2.2 o Revise outlet locations o Add note for USB outlet spec ▪ EL2.0 o New sheet o Basement Level Lighting Control and Circuiting ▪ EL2.1 o New sheet o Main Level Lighting Control and Circuiting ▪ EL2.2 o New sheet o Upper Level Lighting Control and Circuiting Thank You, Mark Hardeman 08/19/2019