HomeMy WebLinkAboutFile Documents.203 E Hallam St.0209.2019 (7).ARBKThese plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
SEE NOTES #1 PLANS
04/09/2020
Bonnie Muhigirwa 4/11/20
0174.2018.ARBK
04/09/2020
04/09/2020
04/09/2020
04/09/2020
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
External Energy Use Approved
RREMP CREMP
PERMIT #:0209.2019.ARBK DATE:_4/11/20
SNOWMELT:_1073 sf total____
POOL: __0____________________
SPA: __48 sf_____________
OFFSET:_______none_________________
REMP SHEET: ___L 1.05_______
REVIEWED BY: __BM 4/11/20____________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: __75%_________
0209.2019.ARBK
STYSLINGER
203 E HALLAM ST
273707316002
1
04/11/2020
bonniem
ALL OUTDOOR LIGHTING
MUST COMPLY WITH
THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150
05/26/2020
April 22, 2020
Craig Barnes
C. Barnes Construction, LLC
190 Riverdown Drive
Aspen, CO 81611
craig@cbcaspen.com
RE: Roof Access Hatch – 203 E Hallam, Aspen, CO 81611
Craig,
We reviewed the as-built framing configuration around the new access hatch opening through the roof in the
upstairs south-east bedroom, as shown in photographs received via email on April 7, 2020. The roof framing
utilizes the south interior wall of the stair to support the short span rafters north of the adjacent existing roof
beam. This interior wall bears down on the existing floor framing below. We understand a new parapet wall will
be framed around the hatch opening, approximately 3’-0” in height, to support the new hatch assembly.
Upon completion of our review of the as-built framing, we find that the roof framing around the hatch is
structurally acceptable as-constructed, and the south interior wall of the stair will provide adequate support for
the tributary roof load. Should you have any further questions regarding this matter, please feel free to contact
our office.
Sincerely,
Evolve Structural Design LLC
Steven R. Edmiston, P.E., S.E.
Senior Engineer
04/22/2020