Loading...
HomeMy WebLinkAboutFile Documents.728 W Bleeker St.0213.2019 (5).ARBK DATE: MASTER PERMIT:0065.201 9.ARBK PERMIT NUMBER:0213.2019.ARBK • COMMUNITY DEVELOPMENT DEPARTMENT �� HO BUILDING PERMIT APPLICATION 41. ` CITY OF ASPE N PROPERTY INFORMATION ADDRESS 728 West Bleeker Street, Aspen CO UNIT# PARCEL ID# 273512496002 LOT 5 BLOCK 17 TRsueolvlslON Kellner Duplex Condo Unit: East OWNER NAME POSTON 2012 FAM TRUST CELL 214-738-7674 EMAIL pposton@wellingtoninsgroup.com BEST CONTACT Kim Raymond CELL 970-379-8938 EMAIL kim@krai.us NAME PROJECT DETAILS (READ DEFINITIONS BELOW) THISSECTIONMUSTBE COMPLETED IN ITS ENTIRETY 1 DESCRIPTION OF WORK IN DETAIL Replace windows throughout. New windows in existing openings. PROJECT $200,000 Use of Building Class of Work Fixture Counts Important Review Triggers VALUATION ❑ Commerical ❑ New 5 Toilets,Bidets Major Engineering Review SBQU IFTOF ❑■ Multi-Family 0 Addition 3 Bathtub •Projects involving less than 50% WORK 0 0 Single Family ❑■ Alteration 7 Lavatory(Wash Basin) hardscape area and work affecting 0 Mixed-Use 0 Repair 2 Shower 75%or greater of unit sq ft 4,2022 Kitchen Sink(+Disposal) •Projects involving greater than UNITSQFT 0 0 IFFR Dishwasher, 50%hardscape area and work LOT SIZE 0 Tenant Finish Laundry Bar,Utility Sink affecting 50%or greater of unit (SQ FT) 9,000 sq ft Will there be 0 Demolition Clothes Washer sq ft SC3FTOFSOIL any roof/wall ❑ Change Order a Floor Sink •Projects involving 1,000+sq ft of DI TURBANCE 0 sq ft penetrations? 0 Floor Drain soil disturbance area ❑■ Yes Water Heater(Pan Req) NEW SQ FT 0 sq ft 0 No 3 #Gas Outlets Water Efficient Landscaping Water Treatment •Projects that trigger a major BUILDING 3,956 sq ft Other engineering review FOOTPRINT NOTICE: This permit becomes null and void if work •Projects involving interior or construction authorized is not commenced within HARDSCAPE alterations affecting 50%or more AREA 1,035 sq ft 180 days,or if construction or work is suspended or abandoned for a period of 180 days at any time after of exisiting gross square footage ZONE R-6 work is commenced. DISTRICT •. i Project Valuation:Cost of project as defined in Valuation Affadavit. 2 Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration. 0 Unit Sq Ft:Gross square footage, not FAR,of permitted unit. H Lot Size:Total surveyed square footage of property. APPROVALS Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed Reviewing Needs Reviewer Date Z New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review Sign-Off Approved w Building Footprint:Grade floor square footage of the permitted structure. PC X LL 11/4/2019 0 Hardscape Area:Square footage of impervious lot surface. Zone District:Underlying zone district of permitted parcel. Zoning x sv 11/20/2019 HPC Building x TF 11/26/19 SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire Building Building Engineering Review Permit Fee 25 00 Parks Impact CMP Engineering Zoning School Lands Water Review Review(50%) 243.75-.75 HOURS Dedication Stormwater Zoning CMP(50%) TDM Impact Sanitation Review(50%) Energy Code REMP Pedestrian Env. Health Review 3.75 Payment Amenity Parks CMP(50%) GIS Housing Cash in Lieu Landscape Parks Review City Use Water Tap Efficiency Tax Approved 1 County Use To Issue Utility Review Tax Sanitation Issuance /201,9 ( CITY OF ASPEN January Z1/04 130 S. GALENA ST ASPEN, CO 81611J