HomeMy WebLinkAboutFile Documents.728 W Bleeker St.0213.2019 (5).ARBK DATE: MASTER PERMIT:0065.201 9.ARBK PERMIT NUMBER:0213.2019.ARBK
•
COMMUNITY DEVELOPMENT DEPARTMENT ��
HO
BUILDING PERMIT APPLICATION 41.
` CITY OF ASPE N
PROPERTY INFORMATION
ADDRESS 728 West Bleeker Street, Aspen CO UNIT# PARCEL ID# 273512496002
LOT 5 BLOCK 17 TRsueolvlslON Kellner Duplex Condo Unit: East
OWNER NAME POSTON 2012 FAM TRUST CELL 214-738-7674 EMAIL pposton@wellingtoninsgroup.com
BEST CONTACT Kim Raymond CELL 970-379-8938 EMAIL kim@krai.us
NAME
PROJECT DETAILS (READ DEFINITIONS BELOW) THISSECTIONMUSTBE
COMPLETED IN ITS ENTIRETY
1
DESCRIPTION OF
WORK IN DETAIL Replace windows throughout. New windows in existing openings.
PROJECT $200,000 Use of Building Class of Work Fixture Counts Important Review Triggers
VALUATION
❑ Commerical ❑ New 5 Toilets,Bidets Major Engineering Review
SBQU IFTOF ❑■ Multi-Family 0 Addition 3 Bathtub •Projects involving less than 50%
WORK 0 0 Single Family ❑■ Alteration 7 Lavatory(Wash Basin) hardscape area and work affecting
0 Mixed-Use 0 Repair 2 Shower 75%or greater of unit sq ft
4,2022 Kitchen Sink(+Disposal) •Projects involving greater than
UNITSQFT 0 0 IFFR Dishwasher, 50%hardscape area and work
LOT SIZE 0 Tenant Finish Laundry Bar,Utility Sink affecting 50%or greater of unit
(SQ FT) 9,000 sq ft Will there be 0 Demolition
Clothes Washer sq ft
SC3FTOFSOIL any roof/wall ❑ Change Order a Floor Sink •Projects involving 1,000+sq ft of
DI TURBANCE 0 sq ft penetrations? 0 Floor Drain soil disturbance area
❑■ Yes Water Heater(Pan Req)
NEW SQ FT 0 sq ft 0 No 3 #Gas Outlets Water Efficient Landscaping
Water Treatment •Projects that trigger a major
BUILDING 3,956 sq ft Other engineering review
FOOTPRINT NOTICE: This permit becomes null and void if work •Projects involving interior
or construction authorized is not commenced within
HARDSCAPE alterations affecting 50%or more
AREA 1,035 sq ft 180 days,or if construction or work is suspended or
abandoned for a period of 180 days at any time after of exisiting gross square footage
ZONE R-6 work is commenced.
DISTRICT •. i
Project Valuation:Cost of project as defined in Valuation Affadavit.
2 Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration.
0 Unit Sq Ft:Gross square footage, not FAR,of permitted unit.
H Lot Size:Total surveyed square footage of property. APPROVALS
Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed Reviewing Needs Reviewer Date
Z New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review Sign-Off Approved
w Building Footprint:Grade floor square footage of the permitted structure. PC X LL 11/4/2019
0 Hardscape Area:Square footage of impervious lot surface.
Zone District:Underlying zone district of permitted parcel. Zoning x sv 11/20/2019
HPC
Building x TF 11/26/19
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire
Building Building Engineering
Review Permit Fee 25 00 Parks Impact
CMP
Engineering Zoning School Lands Water
Review Review(50%) 243.75-.75 HOURS Dedication
Stormwater
Zoning CMP(50%) TDM Impact Sanitation
Review(50%)
Energy Code REMP Pedestrian Env. Health
Review 3.75 Payment Amenity Parks
CMP(50%) GIS Housing Cash in Lieu Landscape
Parks Review City Use Water Tap Efficiency
Tax Approved 1
County Use To Issue
Utility Review Tax Sanitation
Issuance
/201,9
( CITY OF ASPEN January Z1/04
130 S. GALENA ST ASPEN, CO 81611J