Loading...
HomeMy WebLinkAboutFile Documents.232 E Main St.0078-2020-BCHO (78)COMcheck Software Version 4.1.1.0 Exterior Lighting Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Permit No.0132.2018.ACBK Permit Date:2019 Construction Site: 232 East Main Street Aspen, CO 81611 Owner/Agent: Brad Hribar Centaur Construction 1200 W Lake St Ste 200 Chicago, IL 60607 3127148519 bhribar@centaurco.com Designer/Contractor: Zachary Gains AEC 9707488520 zach@aec-vail.com Project Information Energy Code: 232 East Main Street 4 (High activity metropolitan commercial district)Exterior Lighting Zone Allowed Exterior Lighting Power A Area/Surface Category B Quantity C Allowed Watts / Unit D Tradable Wattage E Allowed Watts (B X C) Main entry 90 ft of door 30 Yes 2700 Total Tradable Watts (a) = Total Allowed Watts = Total Allowed Supplemental Watts (b) = 2700 2700 1300 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 1300 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures Main entry (90 ft of door width): Tradable Wattage LED 1: FIXTURE A: Other:1 11 17 187 LED 2: FIXTURE B: Other:1 4 10 42 LED 3: FIXTURE H: Other:1 1 25 25 254Total Tradable Proposed Watts = Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Exterior Lighting PASSES: Design 94% better than code Project Title: Data filename: 232 East Main Street P:\Current Projects\18029.00 - 232 East Main Street\Calculations\COMcheck\Electrical COMcheck.cck 03/08/21Report date: 51 ofPage Zachary Gains 03/08/2021 4/14/2021 04/23/2021 nickt Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.1.0 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2015 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR8]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable C406 [PR9]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: 232 East Main Street P:\Current Projects\18029.00 - 232 East Main Street\Calculations\COMcheck\Electrical COMcheck.cck 03/08/21Report date: 52 ofPage 4/14/2021 Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions C405.2.5 [EL25]null Automatic lighting controls for exterior lighting installed. Controls will be daylight controlled, set based on business operation time-of-day, or reduce connected lighting > 30%. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: 232 East Main Street P:\Current Projects\18029.00 - 232 East Main Street\Calculations\COMcheck\Electrical COMcheck.cck 03/08/21Report date: 53 ofPage 4/14/2021 Section # & Req.ID Final Inspection Complies?Comments/Assumptions C405.5.1 [FI19]1 Exterior lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Exterior Lighting fixture schedule for values. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: 232 East Main Street P:\Current Projects\18029.00 - 232 East Main Street\Calculations\COMcheck\Electrical COMcheck.cck 03/08/21Report date: 54 ofPage 4/14/2021 Project Title: Data filename: 232 East Main Street P:\Current Projects\18029.00 - 232 East Main Street\Calculations\COMcheck\Electrical COMcheck.cck 03/08/21Report date: 55 ofPage 4/14/2021