Loading...
HomeMy WebLinkAboutFile Documents.232 E Main St.0078-2020-BCHO (81)COMcheck Software Version 4.1.5.1 Mechanical Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Permit No..0132.2018.ACBK Permit Date:2018 Location:Aspen, Colorado Climate Zone:7 Construction Site: 232 E Main St Aspen, CO 81611 Owner/Agent: Brad Hribar Centaur Construction 1200 W Lake St Suite 200 Chicago, IL 60607 3127148519 bhribar@centaurco.com Designer/Contractor: Bryan Urban AEC 40801 US Hwy 6 Ste 214 Avon, CO 81620 970-748-8520 burban@aec-vail.com Project Information Energy Code: 232 E Main Core and Shell Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Additional Efficiency Package(s) Mechanical Systems List Quantity System Type & Description Heating: 1 each - Central Furnace, Gas, Capacity = 150 kBtu/h Proposed Efficiency = 80.00% Et, Required Efficiency: 80.00 % Et or 78% AFUE Cooling: 1 each - Single Package DX Unit, Capacity = 73 kBtu/h, Evaporatively Cooled Condenser, Air Economizer Proposed Efficiency = 12.80 EER, Required Efficiency: 11.90 EER + 12.1 IEER Fan System: RTU-1 FAN -- Compliance (Brake HP method) : Passes Fans: RTU 1 FAN Supply, Multi-Zone VAV, 3000 CFM, 5.0 motor nameplate hp, 2.4 design brake hp (2.4 max. BHP), 80.0 fan efficiency grade 1 RTU-1 (Multiple-Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 150 kBtu/h Proposed Efficiency = 80.00% Et, Required Efficiency: 80.00 % Et or 78% AFUE Cooling: 1 each - Single Package DX Unit, Capacity = 87 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 13.50 EER, Required Efficiency: 11.00 EER + 12.6 IEER Fan System: RTU-1 FAN -- Compliance (Brake HP method) : Passes Fans: RTU 1 FAN Supply, Multi-Zone VAV, 3000 CFM, 5.0 motor nameplate hp, 2.4 design brake hp (2.4 max. BHP), 80.0 fan efficiency grade 1 RTU-2 (Multiple-Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 72 kBtu/h Proposed Efficiency = 82.00% Et, Required Efficiency: 80.00 % Et or 78% AFUE Cooling: 1 each - Single Package DX Unit, Capacity = 30 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 15.50 SEER, Required Efficiency: 14.00 SEER Fan System: RTU-3 FAN -- Compliance (Brake HP method) : Passes Fans: RTU 3 FAN Supply, Multi-Zone VAV, 1380 CFM, 1.5 motor nameplate hp, 0.9 design brake hp (0.9 max. BHP), 80.0 fan efficiency grade 1 RTU-3 (Multiple-Zone): Project Title: Data filename: 232 E Main Core and Shell P:\Current Projects\18029.00 - 232 East Main Street\Calculations\COMcheck\Mechanical COMcheck 01-20-2021.cck 03/08/21Report date: 151 ofPage 4/14/2021 04/23/2021 nickt Quantity System Type & Description Heating: 1 each - Central Furnace, Gas, Capacity = 72 kBtu/h Proposed Efficiency = 82.00% Et, Required Efficiency: 80.00 % Et or 78% AFUE Cooling: 1 each - Single Package DX Unit, Capacity = 41 kBtu/h, Air-Cooled Condenser, Air Economizer Proposed Efficiency = 16.40 SEER, Required Efficiency: 14.00 SEER Fan System: RTU-4 FAN -- Compliance (Brake HP method) : Passes Fans: RTU 4 FAN Supply, Multi-Zone VAV, 2000 CFM, 3.0 motor nameplate hp, 1.8 design brake hp (1.8 max. BHP), 80.0 fan efficiency grade 1 RTU-4 (Multiple-Zone): Heating: 1 each - Unit Heater (UH-1), Electric, Capacity = 3 kBtu/h No minimum efficiency requirement applies Fan System: None 5 UH-1 (Single Zone): Heating: 1 each - Unit Heater (UH-2), Electric, Capacity = 5 kBtu/h No minimum efficiency requirement applies Fan System: None 4 UH-2 (Single Zone): Electric Storage Water Heater, Capacity: 7 gallons Proposed Efficiency: 2.00 SL, %/h (if > 12 kW), Required Efficiency: 4.16 SL, %/h (if > 12 kW) 1 WH-1: Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.5.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Project Title: Data filename: 232 E Main Core and Shell P:\Current Projects\18029.00 - 232 East Main Street\Calculations\COMcheck\Mechanical COMcheck 01-20-2021.cck 03/08/21Report date: 152 ofPage Bryan Urban 03-08-2021 4/14/2021