Loading...
HomeMy WebLinkAboutFile Documents.210 S West End St.0011-2021-BCHO (17)Holesaw size (R) (diameter): 0 inches On Center Spacing (T): 0 inches % Open (30% minimum req'd): #DIV/0! Minimum required thickness of EPS/XPS insulation to get overall R-10:#DIV/0! inches Holesaw size (R) (diameter): 2.5 inches Vertical On Center Spacing (U1): 4 inches Horizontal On Center Spacing (U2): 4 inches % Open (30% minimum req'd): 30.7% Minimum required thickness of EPS/XPS insulation to get overall R-10: 2.61 inches City of Aspen V1 modified 1/25/2017 Pervious Snowmelt Insulation Perforation Calculator The City of Aspen has created and provided this software solely as a reference. Users should obtain assistance from a qualified professional to verify accuracy and applicability before proceeding. The City of Aspen makes no express or implied warranty with respect to this software or any information contained herein. To the full extent permissible by law, the City of Aspen disclaims all responsibility for any damages or losses (including, without limitation, structural damage, building defects, financial loss, damages for loss in business projects, loss of profits or other consequential losses) arising in contract, tort or otherwise from the use of or inability to use this software, or from any action or decision taken as a result of using this software. Sand with snowmelt tubing Pervious pavers 3" of insulation (R-15) with holes sized and spaced as calculated Screened rock below filter fabric example section detail Compacted road base 08/10/2021 SEE CIVIL SHEET C7 FOR CORRESPONDING DETAILING 08/31/2021 justinh