Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.395 Thunderbowl Ln.0002-2020-BCHO (14)
0002-2020-BCHO_BuildingComments_1 Subject: PlanCheck Page: A-7.22 ELECTRICAL EQUIPMENT ENCLOSURE AND CONDENSER ENCLOSURE Page Index: 2 Author: nickt Color: File Name: 395 Thunderbowl Ln - CHANGE ORDER 2 - ARCHITECTURAL.pdf Electric meters and means of disconnect may not be enclosed unless you can clearly detail the enclosure to not encroach on the working space and dedicated equipment space requirements of 2017 NEC 110.26. 395 Thunderbowl Ln - CHANGE ORDER 2 - ARCHITECTURAL.pdf (4) Subject: PlanCheck Page: A-7.22 ELECTRICAL EQUIPMENT ENCLOSURE AND CONDENSER ENCLOSURE Page Index: 2 Author: nickt Color: File Name: 395 Thunderbowl Ln - CHANGE ORDER 2 - ARCHITECTURAL.pdf At all equipment screens, provide and dimension the following per 2015 IMC 306: 1. 30"x30" clear working space in front of the control side of each piece of equipment for service access. 306.1 2. Provide a door that when opened, provides a minimum 24" clearance, provided the equipment can be removed without dismantling the screen. Otherwise, make the door wide enough to remove the appliance. 306.2 3. Provide clearances as required by manufacturer's installation instructions. Subject: PlanCheck Page: A-7.29 NORTH PATIO AND POOL PLAN Page Index: 6 Author: nickt Color: File Name: 395 Thunderbowl Ln - CHANGE ORDER 2 - ARCHITECTURAL.pdf Provide pool and spa drawings complying with the 2015 ISPSC (International swimming pool and spa code). Provide completed APSP-15 worksheets for the pool and spa. Worksheet can be found here: https://www.apsp.org/portals/0/Fi leDownloads/APSP-15%20Com pliance%20Information%20Shee t.pdf Subject: PlanCheck Page: A-7.29 NORTH PATIO AND POOL PLAN Page Index: 6 Author: nickt Color: File Name: 395 Thunderbowl Ln - CHANGE ORDER 2 - ARCHITECTURAL.pdf Treads must be the same dimension unless broken up by a landing (landing minimum depth 36"). Stairways with 4 or more risers must have at least one handrail (with ends returning). 2015 IRC R311.7.5.2, R311.7.6, R311.7.8 4'-81/2" 51/2" 6'- 9 " 51/2" 7'-11/4" 1'- 3 " 3'- 1 " 5'- 6 " 5'- 6 " 6'- 6 " 1'- 1 0 " 7" DIAMETER CUT OUT AT METERS WOOD SIDING DOORS TO BE CLAD WITHWOOD SIDING, FLUSH TOWALL SIDING SIDING JOINTS TO ALIGN ONDOORS AND WALLS ELECTRICAL EQUIPMENTMOUNTED ON WALLS(SHOWN DASHED BEYOND) WOOD SOFFIT TYPICAL WOOD SIDING LEVER HANDLES, TBD PV METERHOUSEMETER PVDISCONNECT GENERATOR+/S C/T CAN HOUSEDISCONNECT 54 UIP. AND CONDENSER ENCLOSURE - ENLARGED SOUTH ELEVATION A STANDING SEAM METAL ROOF 2X8 FASCIA BOARD -CLAD WITH SHEETMETAL CHANGE ORDER 2 CHANGE ORDER 2 CHANGE ORDER 2 Electric meters and means of disconnect may not be enclosed unless you can clearly detail the enclosure to not encroach on the working space and dedicated equipment space requirements of 2017 NEC 110.26. 2'-31/2"4'-2"4'-2"2'-111/2"8" 3'-8"-CLR 3'-8"-CLR 3'-8"-CLR 11"2'-01/2" EQ PV METERHOUSEMETER PVDISCONNECT GENERATOR+/S C/T CAN 8" 5' - 1 0 " 31/2" 1' - 1 " 6"10 1/2 5'-21/2"-CL R At all equipment screens, provide and dimension the following per 2015 IMC 306: 1. 30"x30" clear working space in front of the control side of each piece of equipment for service access. 306.1 2. Provide a door that when opened, provides a minimum 24" clearance, provided the equipment can be removed without dismantling the screen. Otherwise, make the door wide enough to remove the appliance. 306.2 3. Provide clearances as required by manufacturer's installation instructions. -6" 4" 1'- 6 " 4" 1'- 6 " 4" 1'- 6 " 4" 1'- 6 " 4" 1'- 7 " 1'- 4 " 2'- 9 " 1'- 4 " 14'-91/2" 81/4"2'-4" 82.29° GREEN SPACE DRAIN PLANTING BETWEENCONCRETE - TYP. POOL COPING POOL COPING POOL COVER W/REMOVEABLE PANELS PLANTING BETWEENCONCRETE - TYP. POOL COVER W/REMOVEABLEPANELS DRAIN JOINT AT SNOWMELT / NON SNOWMELT POOL VAULT - SHOWN DASHED BELOW GRADE - SEE SHT A-7.34 FORINFO. POOL VAULT ACCESS HATCH - SEE SHT A-7.34 FOR INFO. 4R @ 5 1/16 " EAC H SLO P E : 1/4" / FT POOL -SEE SHOP DRAWINGS FORFURTHER INFO. 98'- 3 1/2" SPA -SEE SHOP DRAWINGSFOR FURTHER INFO.98'-3 1/2" BUILDING ENVELOPE 6'-91/4" 2'- 6 " 1'- 0 " 10 ' - 0 " 1'- 0 " 4" 2'-4"2'-8"30'-6"2'-8" '- 3 " 17 '-01/4" 31/2" 3'- 1 " '-0" 14 ' - 4 " PLANTER PLANTER PRIVACY FENCE COLUMN CLEAN OUT ROOF ABOVE 99'- 11 3/4" 100'- 1 7/16"100'- 1" 99'-11 3/4" 100'- 1 3/16" 99'-11 3/4" 99'- 11 3/4" 99'- 11 3/4" -T.O.D. -T.O.S. -T.O.D. = T.O. COPING -T.O. COPING -T.O. COPING -T.O. COPING -T.O.S. 9 - -T.O.G. -T.O.G. 102'- 1 3/4" -T.O. PLANTER 1A-7.31 5A-7.30 2A-7.30 4A-7.30 3A-7.31 3A-7.30 Provide pool and spa drawings complying with the 2015 ISPSC (International swimming pool and spa code). Provide completed APSP-15 worksheets for the pool and spa. Worksheet can be found here: https://www.apsp.org/portals/0/FileDownloa ds/APSP-15%20Compliance%20Informatio n%20Sheet.pdf 4" 1'-6 " 4" 1'- 6 " 4" 1'- 6 " 4" 1'- 6 " 4" 1'- 6 " 4" 1'- 6 " 4" 1'- 7 " 1'- 4 " 2'- 9 " 1'- 4 " 4" 1'- 6 " 4" 1'- 6 " 4" 1'- 6 " 4" 1'- 6 " 4" 1'- 6 " 4" 1'- 6 " 1'- 1 0 " 14'-91/2" 17'-5" 16'-6" 2" PLANTER GREEN SPACE GREEN SPACE PLANTING BETWEENCONCRETE - TYP. POOL COVER W/REMOVEABLE PANELS JOINT AT SNOWMELT/ NON SNOWMELT 4R @ 5 1/16 " EAC H SLO P E : 1/4" / FT SLO P E : 1/4" / FT 8'- 3 1/2" 98'-10" 99'-2" 98'-5" SPA -SEE SHOP DRAWINGSFOR FURTHER INFO. 100'-1 1/8"100'-1 1/8" 98'-3 1/2" NG ENVELOPE 2'-8" 81/4"1'-31/4" 31/2" 18'-63/4" '-13/4" 1'-63/4" 3'- 1 " 8" PRIVACY FENCE ROOF ABOVE 1A-7.32 100'-2 1/2" /4" 100'- 1" 99'-11 3/4" 100'-2 5/16" 99'-11 3/4" 99'-11 3/4" 99'-10 3/4" 99'-11 1/4" 99'- 11 3/4" .O. COPING -T.O. COPING -T.O. COPING -T.O.D. -T.O.S. -T.O.S. -T.O.S. -T.O.D. -T.O.S. 99'-11 3/4" -T.O. PLANTER 99'-11 3/4" -T.O.S. -T.O.G. -T.O.G. -T.O.G. -T.O.G. -T.O.G. 4A-7.31 1A-7.31 5A-7.30 2A-7.31 6A-7.30TYP Treads must be the same dimension unless broken up by a landing (landing minimum depth 36"). Stairways with 4 or more risers must have at least one handrail (with ends returning). 2015 IRC R311.7.5.2, R311.7.6, R311.7.8 x36" x36 Response: This comment is a repeat of the comment in CO-1. The following is a copy of DJA's previously approved response: "Bonnie mentioned that the APSP-14 standard is not required with Aspen's current codes, and that it does not apply to the cover nad pool - see attached sheet from CoverpOols with the ASTM rating" Response: 1.See attached drawing clarifying 30 x 36" clear working spaces. 2. See drawing showing doors showing mpore than 24" clearance. The quipment can be removed without dismantling the screen. 3. The design meets manufacturer's requirements for clearances. Response: Holy Cross has approved the Electric Meter location as shown. See attached revised drawing showing the required clearances for disconnects Response: See revised stair dimensions which include a 3-'0" landing. See sheet A7.29. 03/19/2020 Subject: PlanCheck Page: [4] BG- Thunderbowl-L Series_FINAL-L100 LAYOUT Page Index: 1 Author: nickt Color: File Name: 395 Thunderbowl Ln - CHANGE ORDER 2 - LANDSCAPE.pdf Revise snowmelt extents on landscape plan to match mechanical drawings and REMP worksheet (or remove it from landscape drawings). 395 Thunderbowl Ln - CHANGE ORDER 2 - LANDSCAPE.pdf (3) Subject: PlanCheck Page: [5] BG- Thunderbowl-L Series_FINAL-L200 MATERIALS Page Index: 2 Author: nickt Color: File Name: 395 Thunderbowl Ln - CHANGE ORDER 2 - LANDSCAPE.pdf Provide sheet L800 Subject: PlanCheck Page: [5] BG- Thunderbowl-L Series_FINAL-L200 MATERIALS Page Index: 2 Author: nickt Color: File Name: 395 Thunderbowl Ln - CHANGE ORDER 2 - LANDSCAPE.pdf Provide installation instructions for fire feature showing required clearances to combustibles and demonstrate on your plans that you meet the requirements. Subject: PlanCheck Page: 1 Page Index: 1 Author: nickt Color: File Name: 395 Thunderbowl Ln - CHANGE ORDER 2B - REMP CALCS.pdf Per the mechanical plans, you have 4563 sqft of non exempt plus 18 of exempt for a total of 4581.28. 395 Thunderbowl Ln - CHANGE ORDER 2B - REMP CALCS.pdf (1) T W W W W W W W GA S GAS GAS W W W W SS SS SS SS SS W W W W SS SS SS SS SS W W W W 1. SITE WALL WIDTH 8" UNLESS OTHERWISE NOTED; CONFIRM WITH STRUCTURAL. 2. REFER TO CIVIL FOR ALL FINAL GRADING, DRAINAGE AND UTILITIES. NOTES EXPANSION JOINT SAW CUT JOINT LEGEND PROPERTY LINE SNOWMELT EXTENTS; 3,665.6 SF EASEMENT 0 5 10 scale north L100 layout plan 12/15/2017 pricing set 07/20/2018 change orde 11/27/2019 change orde date l issue © copyright bluegreen 1 2 change orde 12/18/2019 Revise snowmelt extents on landscape plan to match mechanical drawings and REMP worksheet (or remove it from landscape drawings). 5' ACTIVITY ENVELOPE STR STR SPA POOL PAVING WITH PLANTED JOINTS FIRE FEATURE 1 L800 4 L800 4 L803 5 L800 4 L803 RAISED PLANTER3 L800 3 L800 SIM. DRAIN RE CIVIL 2 OUTDOOR SHOWER TILE SCREENING TRELLIS AT-GRADE PLANTER DRAIN RE CIVIL RAISED PLANTER SIM. Provide sheet L800 5' ACTIVITY ENVELOPE PAVING WITH PLANTED JOINTS FIRE FEATURE OUTDOOR GRILL AND COUNTER RE ARCH 1 L800 5 L800 4 L803 RAISED PLANTER3 L800 SIM. RAIN CHAIN WITH HEAT TRACE TO EXTEND TO INLET AND GRAVEL; RE ARCH AND CIVIL Provide installation instructions for fire feature showing required clearances to combustibles and demonstrate on your plans that you meet the requirements. Phone: ` A.RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM Sheets showing snowmelt, pool, spa, and solar/GSHP information: Do you have snowmelt or a spa that has been exempted by the buiding official? Hydro Snowmelt Electric Snowmelt Pool Existing To be Removed Existing to Remain 0.00 sqft 0.00 sqft 0.00 sqft New 4581.28 sqft 215.00 sqft New (exempt)18.00 sqft Total on site 4599.28 sqft 0.00 sqft 215.00 sqft Total Snowmelt on site Boiler Efficiency 98.0%100%98.0% Mitigation Fee 29,83 $ Total Fee for Mitiga B.ON-SITE RENEWABLE CREDITS Supplemental System Use PV Worksheet Photovoltaic System Use Thermal Worksheet Hot Water Panels Use GSHP Cert Ground Source Heat Pu Other Approved System Total Mitigation Cre Onsite Renewable Offsets: How many KiloWatts of PV (solar electric) would I n or How many square feet of SHW (solar hot water) would I R-REMP Amount Previously Paid on This Pe TOTAL R-REMP F Refund (includes minus $ C. PREPARED BY: Print Name: Signature: Phone & EMail:970-748-8520 , david@aec-va M-124, M-602 $158,942.37 David Denio 4599.28 sqft 970-925-3444 Yes (en Per the mechanical plans, you have 4563 sqft of non exempt plus 18 of exempt for a total of 4581.28. Response: See the revised legend on Sheet L100 which no longer includes square footage of snowmelt Response: See attached sheet L800 Response: See manufacturers required clearances and corresponding clearances shown on SHEET A7.29 Response: See revised REMP calcs 03/19/2020