Loading...
HomeMy WebLinkAboutFile Documents.395 Thunderbowl Ln.0153.2017 (67).ARBKWoody Creek Engineering, LLC PO Box 575 Woody Creek, CO 81656 970.429.8297 (o) 970.309.7130 (c) 395 Thunderbowl Lane MEMO Asbuilt Drainage 20210204 Memorandum To: Engineering Staff From: Josh Rice, P.E. CC: WCE Project Number: 0049 Date: February 4, 2021 Re: 395 Thunderbowl Lane As-built Drainage Analysis The drainage system was generally built per plan except for Pipe A (Western Main), the East Pond Outlet and the size of the ponds. We have analyzed Pipe A minimum conveyance capacities versus required ca- pacities. We have revised the orifice based on the as-built storage condition. With the change to the ori- fice plate, the as-built drainage system operates as designed. 1. Pipe A Capacity: Pipe A was required to convey 0.837 cfs per the approved drainage report (see Table 5 in the ap- proved report). The minimum pipe slope as depicted by the as-built survey is a 6” PVC @ 1.32% (see Figure 1 for calculation). The pipe has a carrying capacity of 0.91 cfs when flowing 80% full. 2. Storage A total of 450 cf of storage was constructed. The drainage report required 340 cf. 3. Outlet Orifice A 4.83” diameter orifice plate limits the release from the sand filter to the report approved allow- able release rate of 1.002 cfs (see Figure 2 for calculation). 1/11/20182/4/2021 Page 2 February 4, 2021 Re: 395 Thunderbowl Lane As-built Drainage Analysis 395 Thunderbowl Lane MEMO Asbuilt Drainage 20210204 Figure 1. Pipe A Capacity Page 3 February 4, 2021 Re: 395 Thunderbowl Lane As-built Drainage Analysis 395 Thunderbowl Lane MEMO Asbuilt Drainage 20210204 Figure 2. Bioretention Orifice Calculation