Loading...
HomeMy WebLinkAboutFile Documents.395 Thunderbowl Ln.0153.2017 (69).ARBK0153.2017.ARBK_395 Thunderbowl_Engineering2 Page:[1] Thunderbowl 20180104-revision1-C301 G&D N Author:haileyg File Name: CIVIL.395 THUNDERBOWL.2018.01.16.pdf This grading does not appear to be a viable solution. Contour lines are very drastic for it to be feasibly constructible. With the PD amendment approval, the pipe can be reinstated as was shown on the first submittal. CIVIL.395 THUNDERBOWL.2018.01.16.pdf (6) Page:[1] Thunderbowl 20180104-revision1-C301 G&D N Author:haileyg File Name: CIVIL.395 THUNDERBOWL.2018.01.16.pdf Show the building envelope, patio, gutter, and all other information that was on the initial submittal. Page:[1] Thunderbowl 20180104-revision1-C302 G&D S Author:haileyg File Name: CIVIL.395 THUNDERBOWL.2018.01.16.pdf I think layers are turned off on the drawing. Information, such as the location of the driveway, that were shown on the first submittal are now not appearing in the drawing. Page:[1] Thunderbowl 20180104-revision1-C700 UTIL Author:haileyg File Name: CIVIL.395 THUNDERBOWL.2018.01.16.pdf I think a layer is missing from the drawings. Please show survey base and the proposed landscape plan to verify no conflicts. Page:[1] Thunderbowl 20180104-revision1-C700 UTIL Author:haileyg File Name: CIVIL.395 THUNDERBOWL.2018.01.16.pdf There is no existing house on the lot. Where does this tap go to? The tap is proposed to be abandoned. This grading does notappear to be a viablesolution. Contourlines are very drasticfor it to be feasiblyconstructible. Withthe PD amendmentapproval, the pipecan be reinstated aswas shown on thefirst submittal. CONC:8244.90 CONC:8244.90 -2 . 0 % -2 . 0 % Show the buildingenvelope, patio,gutter, and all otherinformation that wason the initialsubmittal. I think layers areturned off on thedrawing. Information,such as the locationof the driveway, thatwere shown on thefirst submittal are nownot appearing in thedrawing. I think a layer ismissing from thedrawings. Pleaseshow survey baseand the proposedlandscape plan toverify no conflicts. There is no existinghouse on the lot.Where does this tapgo to? The tap is proposed to beabandoned. We have cut a cross section through the swale to demonstrate its constructibility. Remember that the vertical scale is exaggerated by 10. The slopes are under 33%. The plans have been revised to display these items. The plans have been revised to display these items. The plans have been revised to display these items. There is no existing house. We do not know if the tap is existing. It is shown on the survey. Per our discussion, a not has been added to the plans. 04/24/2018 Page:[1] Thunderbowl 20180104-revision1-C700 UTIL Author:haileyg File Name: CIVIL.395 THUNDERBOWL.2018.01.16.pdf Locate water main to the location of the proposed tap. Locate water main tothe location of theproposed tap. The main was not located as required during the locate. Per our discussion, a note has been added to the plans. 04/24/2018