Loading...
HomeMy WebLinkAboutFile Documents.210 S West End St.0011-2021-BCHO (19)Engineering1 - 210 S West End St- 0011-2021-BCHO Page: [1] 36x24Plan File Name: 40.Drainage Report Stamped.20210301.pdf Call out capture volume of each set of pervious pavers. Show the basin area that is routed to that specific set of pervious pavers. Follow Chapter 8 in the URMP to show volume based on gravel sub base depth and 30% void space. Deduct the area that will be pavers set on grade in the tree driplines. 40.Drainage Report Stamped.20210301.pdf (10) Page: [1] 36x24Plan File Name: 40.Drainage Report Stamped.20210301.pdf Is there a gutter or downspout along this edge of the roof? How is drainage routed to the flo-well? Page: [1] 36x24Plan File Name: 40.Drainage Report Stamped.20210301.pdf There has been reported drainage issues along this property line with runoff sheetflowing across the property line and causing issues for the neighbor. Verify that all runoff will infiltrate within the pervious paver. While using tree canopy credits is acceptable we also want to make sure any drainage issue across property lines is addressed. Page: [1] 36x24Plan File Name: 40.Drainage Report Stamped.20210301.pdf Where is this downspout routed? Is there enough paver area for it to infiltrate instead of sheet flowing across and onto the neighbors property? Page: [1] 36x24Plan File Name: 40.Drainage Report Stamped.20210301.pdf Where is this downspout routed? It does not make it to the pervious pavers or raingarden. Please address and clearly show that each downspout is routed to a BMP. Call out capture volume of each set of pervious pavers. Show the basin area that is routed to that specific set of pervious pavers.Follow Chapter 8 in the URMP to show volume based on gravel sub base depth and 30% void space. Deduct the area that will bepavers set on grade in the tree driplines. 1 Is there a gutter or downspoutalong this edge of the roof?How is drainage routed to theflo-well? 2 1362 19.4 3 88 13.4 Basin Area WQCVsqftcuft Title: Drainage Revisio n # 21 0 S W e s t E n d S t r e e t Asp e n , C o l o r a d o Job No.Drawn by:Date: File:PE:QC: 2020-474JAK02.17.2021RBSack-Linework-BMRB Date By: Perm i t S e t Proje c t M i l e s t o n e : There has been reporteddrainage issues along thisproperty line with runoffsheetflowing across theproperty line and causingissues for the neighbor. Verifythat all runoff will infiltrate withinthe pervious paver. While usingtree canopy credits isacceptable we also want tomake sure any drainage issueacross property lines isaddressed. Where is this downspout routed? Is there enough paver area for it to infiltrate instead ofsheet flowing across and ontothe neighbors property? Where is this downspoutrouted? It does not make it tothe pervious pavers orraingarden. Please address andclearly show that eachdownspout is routed to a BMP. Pervious paver capture volume called out for each basin. Areas outside of tree dripline used for calculation utilizing 30% void space for gravel sub base. Downspouts adjusted to more accurate locations and narrative updated to reflect drainage direction. A curb will be installed on the east edge of the patio to prevent water from flowing to the neighboring property to the east. This will also ensure that the water will be infiltrated into the pervious paver system. A curb will be installed on the east edge of the patio to prevent water from flowing to the neighboring property to the east. This will also ensure that the water will be infiltrated into the pervious paver system. A small portion of the roof will contribute water to this downspout. Downspout adjusted to more accurate location at the NE corner. Downspout will feed to the previously installed flo-well. 08/10/2021 Page: [1] 36x24Plan File Name: 40.Drainage Report Stamped.20210301.pdf Show this walkway is treated for WQCV. The landscape buffer BMP is an acceptable method. Page: [1] 36x24Plan File Name: 40.Drainage Report Stamped.20210301.pdf The drainage report states runoff will be treated by the pervious pavers and any additional runoff routed to the rain gardens. Given the elevations of this downspout that is not feasible. Show basins based on the BMP they are routed to so it can be determined the specific BMP has capacity for the tributary area. Page: 10 File Name: 40.Drainage Report Stamped.20210301.pdf Show calculations for this table. How is required and provided WQCV being calculated? Page: 10 File Name: 40.Drainage Report Stamped.20210301.pdf This column is the amount of WQCV needed after accounting for the pervious pavers and tree canopy credits. If I'm reading this correctly you are saying the extra WQCV for each basin will be routed to the raingardens in basin 6. However Basins 1 and most of 6 are not routed to the raingardens. Please address. Page: 10 File Name: 40.Drainage Report Stamped.20210301.pdf Where is the rain garden that treats a part of Basin 1? A rain garden is not shown on the plans. Is this the flow-well? Show this walkway is treated forWQCV. The landscape bufferBMP is an acceptable method. The drainage report statesrunoff will be treated by thepervious pavers and anyadditional runoff routed to therain gardens. Given theelevations of this downspoutthat is not feasible. Showbasins based on the BMP theyare routed to so it can bedetermined the specific BMPhas capacity for the tributaryarea. InputCalculation Sub BasinBasin Name Total Area Imp. Area Imperv-iousnessReq'd WQCV (depth) Req'd WQCV (vol.) Decid. Area Conif. Area Perv. Paver Area Rain Garden Vol. Perv. Paver Ratio Grass Buffer Ratio Canopy Credit Perv. Paver Credit Eff. Imp. Area Eff. Imperv-iousnessEff. WQCV (depth)Net WQCV (#)(sq. ft.)(sq. ft.)(%)(in)(cu. ft.)(sq. ft.)(sq. ft.)(sq. ft.)(cu. ft.)(sq. ft.)(sq. ft.)(sq. ft.)(%)(in)(cu. ft.)1 NE 1241 1051 85%0.188 19.4 0.0 0.00 0.0 18 2 1 0.0 0 1051 84.7%0.188 1.062East1362108980%0.171 19.4 0.0 0.00 187.0 0 2 1 0.0 374 715 52.5%0.102 11.613SE168882149%0.095 13.4 305.0 462.00 285.0 0 2 1 184.4 570 67 3.9%0.014 2.004SW213270933%0.070 12.4 443.0 295.00 144.0 0 2 1 155.0 288 266 12.5%0.033 5.905West151682955%0.106 13.5 0.0 183.00 150.0 0 2 1 54.9 300 474 31.3%0.067 8.426NW106167664%0.126 11.1 0.0 154.00 99.5 37 2 1 46.2 199 431 40.6%0.082 -29.77Total 9000 5175 58%0.8 89 748 1094 866 55.3 440 1731.0 3004 38%0.49 -0.8 Legend Show calculations for this table.How is required and providedWQCV being calculated? erv. aver atio Grass Buffer Ratio Canopy Credit Perv. Paver Credit Eff. Imp. Area Eff. Imperv- iousness Eff. WQCV (depth) Net WQCV (sq. ft.)(sq. ft.)(sq. ft.)(%)(in)(cu. ft.) 2 1 0.0 0 1051 84.7%0.188 1.06210.0 374 715 52.5%0.102 11.6121184.4 570 67 3.9%0.014 2.00 2 1 155.0 288 266 12.5%0.033 5.90 2 1 54.9 300 474 31.3%0.067 8.42 2 1 46.2 199 431 40.6%0.082 -29.77 This column is the amount ofWQCV needed after accounting for the pervious pavers and treecanopy credits. If I'm reading this correctly youare saying the extra WQCV for each basin will be routed to theraingardens in basin 6.However Basins 1 and most of 6 are not routed to theraingardens. Please address. CV Decid. Area Conif. Area Perv. Paver Area Rain Garden Vol. Perv. Paver Ratio Grass Buffer Ratio Canopy Credit Perv. Pa Cred (sq. ft.)(sq. ft.)(sq. ft.)(cu. ft.)(sq. ft.)(sq. ft 9.4 0.0 0.00 0.0 18 2 1 0.0 9.4 0.0 0.00 187.0 0 2 1 0.0 3.4 305.0 462.00 285.0 0 2 1 184.4 2.4 443.0 295.00 144.0 0 2 1 155.0 3.5 0.0 183.00 150.0 0 2 1 54.9 Where is the rain garden thattreats a part of Basin 1? A raingarden is not shown on theplans. Is this the flow-well? Landscape buffer along S West End to treat concrete walkway. Basin 6 will direct runoff to rain gardens and will have enough capacity to treat the WQCV. Overflow is routed over the downstream edge of the rain gardens and around the building across the impervious pavers at the west edge of Basin 6 providing additional treatment capacity. The site currently has capacity to treat another 93 cuft of runoff or 1027 sqft of impervious area. Required WQCV depth is calculated from Figure 8.13 of the Aspen URMP and volume is calculated by methods shown in Section 8.4 on page 8-29 of the Aspen URMP. Provided WQCV also follows design guidelines outline in the Aspen URMP. All of Basin 6 is being directed to the rain garden with additional overflow directed over pervious pavers in Basin 6 to provide additional WQCV treatment. Basin 1 is directed to a flo-well with an overflow route that is directed to a secondary flo-well for additional treatment / overflow. Rain garden column has been updated to read as Rain Garden / Flo-Well as both volumes are treated the same in WQCV treatment. The rain garden column has been updated to read as Rain Garden / Flo-Well as both volumes are treated the same in WQCV treatment. 08/10/2021 Page: [4] C2 Site Plan File Name: 90.Civil Permit Set.20210301.pdf Show the Public Improvements on the south side of the property along Hyman Ave. Including ramps. Verify all public improvements meet City Standards. 90.Civil Permit Set.20210301.pdf (19) Page: [4] C2 Site Plan File Name: 90.Civil Permit Set.20210301.pdf The project has triggered a major engineering review. With this trigger the whole site must be brought in to compliance with all public improvement standards. This includes removing the head in parking and replacing it with parallel on street parking. Show this on the site plan. Page: [4] C2 Site Plan File Name: 90.Civil Permit Set.20210301.pdf The landscape plans call this area out as mortar set pavers. Clarify on the civil plans what areas are pervious pavers and used as a BMP and what areas are not. Page: [4] C2 Site Plan File Name: 90.Civil Permit Set.20210301.pdf Call out excavation depth for the pervious pavers in the driplines of these trees. Verify with Parks Dept the trees can withstand the proposed excavation. Page: [4] C2 Site Plan File Name: 90.Civil Permit Set.20210301.pdf Clarify which pipes are perforated underdrain pipes and which are conveyance pipes. Show the Public Improvementson the south side of theproperty along Hyman Ave.Including ramps. Verify allpublic improvements meet CityStandards. The project has triggered amajor engineering review. Withthis trigger the whole site mustbe brought in to compliancewith all public improvementstandards. This includesremoving the head in parkingand replacing it with parallel onstreet parking. Show this on thesite plan. The landscape plans call thisarea out as mortar set pavers.Clarify on the civil plans what areas are pervious pavers and used as a BMP and what areas are not. Call out excavation depth forthe pervious pavers in thedriplines of these trees. Verifywith Parks Dept the trees canwithstand the proposedexcavation. Clarify which pipes are perforated underdrain pipes and which are conveyance pipes. Public improvements along Hyman Ave have been completed separate and prior to this project and meet CoA standards. These pavers were incorrectly labeled as mortar set and will be sand set to utilize the pervious paver with underdrain design. Pervious pavers will only be installed for areas outside of tree driplines. Excavation depths called out for clarity. Underdrains underneath pervious pavers will be perforated - all pipe crossing into foundation or not under pervious pavers will be solid PVC. See note on Drainage Plan. Head in parking has been removed and parallel parking has been designed for S West End Street. a detached sidewalk is designed for the ROW with a minimum of 5' landscape buffer and 5' wide concrete sidewalk that lines up with the existing ADA ramp at the corner of Hyman Ave and S West End to the south and the existing detached sidewalk across the alley to the north of the property. 08/10/2021 Page: [4] C2 Site Plan File Name: 90.Civil Permit Set.20210301.pdf The sidewalk must be replaced with an ADA compliant sidewalk. The sidewalk shall be 5' in width with a 5' landscape buffer between the back of curb and edge of sidewalk. Page: [5] C3 Grading Plan File Name: 90.Civil Permit Set.20210301.pdf Show that drainage is routed from the alley to the city gutter. What is the design of the transition? Page: [5] C3 Grading Plan File Name: 90.Civil Permit Set.20210301.pdf Verify no excavation will take place on the neighbors property to install this curb. Page: [5] C3 Grading Plan File Name: 90.Civil Permit Set.20210301.pdf the slope in this area exceeds 2:1, how will it be stabilized to ensure no impacts to the neighbor? Page: [5] C3 Grading Plan File Name: 90.Civil Permit Set.20210301.pdf The curb transition needs to happen onsite so the pan is flush in the alley and a snow plow will not clip this corner. How is drainage from the east routed to the new valleypan? The infrastructure in the ROW must be a public benefit and serve the whole alley. Demonstrate this is the case. The sidewalk must be replacedwith an ADA compliantsidewalk. The sidewalk shall be5' in width with a 5' landscapebuffer between the back of curband edge of sidewalk. Show that drainage is routedfrom the alley to the city gutter.What is the design of thetransition? Verify no excavation will takeplace on the neighbors propertyto install this curb. 21 0 S W e s t E n d S t r e e t As p e n , C o l o r a d o 8 1 6 1 1 11 8 W e s t S the slope in this area exceeds2:1, how will it be stabilized toensure no impacts to theneighbor? The curb transition needs tohappen onsite so the pan isflush in the alley and a snowplow will not clip this corner. How is drainage from the eastrouted to the new valleypan?The infrastructure in the ROWmust be a public benefit andserve the whole alley.Demonstrate this is the case. Drainage from the alley does not cross onto this property and instead moves east and north away from this property. Curb is located just outside project property, driveway ramp for the property to the east extends 3.25' into alley and provides a limit of snowplow to prevent curb from being hit. Note added to ensure that no excavation is to take place on neighboring property. Slope on this property currently exists at a 2.25:1 to the north of the existing retaining wall. The slope south of the retaining wall is less than 2:1 due to the existing boulder wall to the east and will remain untouched and undisturbed. Neighboring concrete drive that does not match grades of the alley extends 3.25 feet at a minimum into the alley - the curb transition will not impact or affect snow plow operations. A detached sidewalk is designed for the ROW with a minimum of 5' landscape buffer and 5' wide concrete sidewalk that lines up with the existing ADA ramp at the corner of Hyman Ave and S West End to the south and the existing detached sidewalk across the alley to the north of the property. 08/10/2021 Page: [5] C3 Grading Plan File Name: 90.Civil Permit Set.20210301.pdf On grade pavers do not have the pervious paver sub base to provide WQCV volume. Show extents of sub base and verify there is adequate volume within the proposed pervious pavers. Page: [5] C3 Grading Plan File Name: 90.Civil Permit Set.20210301.pdf In the drainage report address how runoff is routed in to this lower raingarden. Show how the upper rain garden overtops into the lower raingarden. Show enough spot elevations to demonstrate the overflow route of runoff above the WQCV to the ROW. Page: [5] C3 Grading Plan File Name: 90.Civil Permit Set.20210301.pdf What extent of grading needs to happen within the dripline of the trees to accommodate the new pervious paver patio? Call out enough existing and proposed spot elevations so that Parks Dept can verify the patio is acceptable within the driplines of the trees. Page: [5] C3 Grading Plan File Name: 90.Civil Permit Set.20210301.pdf Show enough spot elevations to demonstrate how this pipe daylights in to the raingarden. Re v i s i o n # Jo Dr D On grade pavers do not havethe pervious paver sub base toprovide WQCV volume. Showextents of sub base and verifythere is adequate volume withinthe proposed pervious pavers. In the drainage report addresshow runoff is routed in to thislower raingarden. Show how the upper rain garden overtops into the lowerraingarden. Show enough spot elevations todemonstrate the overflow routeof runoff above the WQCV tothe ROW. What extent of grading needs tohappen within the dripline of thetrees to accommodate the newpervious paver patio? Call outenough existing and proposedspot elevations so that ParksDept can verify the patio isacceptable within the driplinesof the trees. Show enough spot elevations todemonstrate how this pipedaylights in to the raingarden. Extents of sub-base defined. There is more than enough volume to treat WQCV for the site. Upper rain garden will be built with a 2' wide, 1.25" deep weir to allow for overtopping into the lower rain garden. Lower rain garden will be built with a 2' wide, 1.25" deep weir to allow overflow out to the ROW. Weirs will be identical and convey less than historical storm flow rates. Cut/fill will be 6" or less to accommodate work within tree driplines. Existing and proposed spot elevations provided on grading plan. Spot Elevations added to grading plan for pipe daylight. 08/10/2021 Page: [5] C3 Grading Plan File Name: 90.Civil Permit Set.20210301.pdf This concrete valleypan is not a standard installation for an alley. Can the alley be repaved to a v-shaped alley to meet City alley standards? It is the goal of the Right of Way program to limit unnecessary installations in the ROW so that there are not additional constraints for future ROW needs. Why is this valleypan needed? It appears the alley drains to the north. All infrastructure in the ROW should provide a public benefit. Explain how this infrastructure serves the whole alley. Verify that the valleypan will not disrupt plowing operations. Page: [6] C4 Drainage Plan File Name: 90.Civil Permit Set.20210301.pdf Call out volume capacity of each individual BMP. Call out area that is tributary to that individual BMP. Clearly show that the BMP has adequate volume for the area that is draining to it. Page: [9] C7 Civil Details File Name: 90.Civil Permit Set.20210301.pdf Provide a spec of the sand set Tao Grey Pavers with DG gaps. Demonstrate these pavers meet the standards of the pervious pavers in Chapter 8 of the URMP. Page: [9] C7 Civil Details File Name: 90.Civil Permit Set.20210301.pdf Ful infiltration pervious pavers are called out on the plan view. Provide a detail. This concrete valleypan is not a standard installation foran alley. Can the alley be repaved to a v-shaped alleyto meet City alley standards? It is the goal of the Right of Way program to limitunnecessary installations in the ROW so that there arenot additional constraints for future ROW needs. Why isthis valleypan needed? It appears the alley drains to thenorth. All infrastructure in the ROW should provide a publicbenefit. Explain how this infrastructure serves the wholealley. Verify that the valleypan will not disrupt plowingoperations. Call out volume capacity ofeach individual BMP. Call outarea that is tributary to thatindividual BMP. Clearly showthat the BMP has adequatevolume for the area that isdraining to it. Provide a spec of the sand set Tao Grey Pavers with DG gaps. Demonstratethese pavers meet the standards of the pervious pavers in Chapter 8 of the URMP. Ful infiltration pervious pavers are called out on the plan view. Provide a detail. The alley has been repaved recently and repaving would not make sense. The intention of the valley pan is to prevent runoff from getting into the garage and against the foundation from further up the alley. The garage is in a sump condition and could be a potential flooding hazard should the alley not be designed for adequate storm capacity. This valley pan was suggested by Hailey as a viable option to protect the homeowner. The options discussed with Hailey were a valley pan or a rolled curb as seen in neighbors driveways along this alley. A curb would likely inhibit plowing operations, hence the design for a valley pan. If the valley pan is placed outside of the ROW the driveway steepens to greater than 12% grade. Volume capacities listed for each BMP. More than enough volume is available for each BMP. See landscape plans for paver spec. Detail has been provided on details sheet of plan set. Please look at details in coordination with plans. 08/10/2021 This statement is not true. Hailey does not make design recommendations. The role of the reviewer is to check the design for code compliance. Page: [9] C7 Civil Details File Name: 90.Civil Permit Set.20210301.pdf Call out on the site plan where snowmelted pervious pavers are proposed. Page: [1] L1.0 File Name: 90.Landscape Plan.20210301.pdf Show raingardens and appropriate rain garden plantings on the landscape sheets. 90.Landscape Plan.20210301.pdf (6) Page: [1] L1.0 File Name: 90.Landscape Plan.20210301.pdf What is this wall? It is not shown on the Civil grading plan. Is it existing or proposed? Page: [1] L1.0 File Name: 90.Landscape Plan.20210301.pdf Civil plans call out an asphalt alley. landscape plans call out a gravel alley. Page: [1] L1.0 File Name: 90.Landscape Plan.20210301.pdf Irrigation will be needed in the new landscape buffer along West End St. Call out on the site plan wheresnowmelted pervious paversare proposed. ADU B Show raingardens and appropriate rain garden plantings on the landscape sheets. GARAGE SWEDISH (NARROW) ASPENS FORWINDOW AND SECOND STORYSCREENING SAND-SET ANTIQUE GRANITEPAVERS What is this wall? It is notshown on the Civil grading plan.Is it existing or proposed? CONCRETE GARAGE APRON TIE INTO GRAVEL ALLEY Civil plans call out an asphaltalley. landscape plans call outa gravel alley. EXCEED 30" IN HEIGHT Irrigation will be needed in the new landscape buffer along West End St. Snowmelted pavers are delineated on site plan with shaded hatching. Please see legends sheet. SEE LANDSCAPE RESPONSES AT END OF DOCUMENT 08/10/2021 Page: [1] L1.0 File Name: 90.Landscape Plan.20210301.pdf The civil plans call out the patios as pervious pavers. The landscape plans call the patios out as sandset pavers. Please make all sheets consistent. If the patios are to be used as stormwater treatment areas sandset pavers do not meet the standards of the URMP. Please address. Page: [1] L1.0 File Name: 90.Landscape Plan.20210301.pdf Demonstrate the TAO Grey Pavers with planted gaps meet the pervious paver specs of the Urban Runoff Management Plan. SAND-SET TAO GRAY PAVERS WITH DGGAPS SHRUB SCREEN NON-IRRIGATED DG CRUSHER FINES OR HIGH AGAINST THE BASE OF TRU 50% SOIL PEP / 50% SMALL NUGGET. 10. VERIFY LOCATIONS OF PERTINEN SECTIONS. IF ANY PART OF THIS PLA CONTACT LANDSCAPE ARCHITECT F 11. ANY DISTURBANCE UNDER EXIST OF THE CITY FORESTER PRIOR TO C EXISTING TREES; NO HEAVY EQUIPM 1 - TOPSOIL OF IRRIGATED GRASSE TURF), SHRUBS, PERENNIALS, AND DEPTH OF AT LEAST 6 INCHES (6”) C LEAST 5 PERCENT (5%) ORGANIC M 2 - TREE SOIL SHOULD HAVE A MIN AND SUBSOIL LAYERS SHALL BE SA LEAST 6 INCHES (6”) AND HAVE 5 PE AND SUBSOIL SHALL HAVE AT LEAS MATTER BY WEIGHT.3 - A MINIMUM OF FOUR (4) CUBIC Y AMENDMENT PER ONE-THOUSAND BE REQUIRED AS NECESSARY TO M SPECIFICATION.4 - SOIL AMENDMENT ORGANIC MA CLASS II COMPOST. SOIL AND MULCH The civil plans call out thepatios as pervious pavers. Thelandscape plans call the patiosout as sandset pavers. Pleasemake all sheets consistent. Ifthe patios are to be used asstormwater treatment areassandset pavers do not meet thestandards of the URMP. Pleaseaddress. UP MASTER MORTAR SET TAO GRAY PAVING - 110 SF SAND-SET TAO GRAY PAVERS WITH PLANTED GAPS Demonstrate the TAO GreyPavers with planted gaps meetthe pervious paver specs of theUrban Runoff ManagementPlan. 08/10/2021 Page: [9] C7 Civil Details File Name: 90.Civil Permit Set.20210301.pdf Call out on the site plan where snowmelted pervious pavers are proposed. Page: [1] L1.0 File Name: 90.Landscape Plan.20210301.pdf Show raingardens and appropriate rain garden plantings on the landscape sheets. 90.Landscape Plan.20210301.pdf (6) Page: [1] L1.0 File Name: 90.Landscape Plan.20210301.pdf What is this wall? It is not shown on the Civil grading plan. Is it existing or proposed? Page: [1] L1.0 File Name: 90.Landscape Plan.20210301.pdf Civil plans call out an asphalt alley. landscape plans call out a gravel alley. Page: [1] L1.0 File Name: 90.Landscape Plan.20210301.pdf Irrigation will be needed in the new landscape buffer along West End St. Call out on the site plan wheresnowmelted pervious paversare proposed. ADU B Show raingardens and appropriate rain garden plantings on the landscape sheets. GARAGE SWEDISH (NARROW) ASPENS FORWINDOW AND SECOND STORYSCREENING SAND-SET ANTIQUE GRANITEPAVERS What is this wall? It is notshown on the Civil grading plan.Is it existing or proposed? CONCRETE GARAGE APRON TIE INTO GRAVEL ALLEY Civil plans call out an asphaltalley. landscape plans call outa gravel alley. EXCEED 30" IN HEIGHT Irrigation will be needed in the new landscape buffer along West End St. Rain Gardens are delineated with separate hatch and noted to be Bluejoint Reedgrass per Appendix E of the URMP This is an existing wall that remains Landscape plan updated to state the current condition of asphalt alley Landscape plans shows new west end street design and includes landscaping and irrigation 08/10/2021 Page: [1] L1.0 File Name: 90.Landscape Plan.20210301.pdf The civil plans call out the patios as pervious pavers. The landscape plans call the patios out as sandset pavers. Please make all sheets consistent. If the patios are to be used as stormwater treatment areas sandset pavers do not meet the standards of the URMP. Please address. Page: [1] L1.0 File Name: 90.Landscape Plan.20210301.pdf Demonstrate the TAO Grey Pavers with planted gaps meet the pervious paver specs of the Urban Runoff Management Plan. SAND-SET TAO GRAY PAVERS WITH DGGAPS SHRUB SCREEN NON-IRRIGATED DG CRUSHER FINES OR HIGH AGAINST THE BASE OF TRU 50% SOIL PEP / 50% SMALL NUGGET. 10. VERIFY LOCATIONS OF PERTINENSECTIONS. IF ANY PART OF THIS PLA CONTACT LANDSCAPE ARCHITECT F 11. ANY DISTURBANCE UNDER EXIST OF THE CITY FORESTER PRIOR TO CEXISTING TREES; NO HEAVY EQUIPM 1 - TOPSOIL OF IRRIGATED GRASSE TURF), SHRUBS, PERENNIALS, AND DEPTH OF AT LEAST 6 INCHES (6”) C LEAST 5 PERCENT (5%) ORGANIC M2 - TREE SOIL SHOULD HAVE A MIN AND SUBSOIL LAYERS SHALL BE SALEAST 6 INCHES (6”) AND HAVE 5 PEAND SUBSOIL SHALL HAVE AT LEAS MATTER BY WEIGHT.3 - A MINIMUM OF FOUR (4) CUBIC Y AMENDMENT PER ONE-THOUSAND BE REQUIRED AS NECESSARY TO M SPECIFICATION.4 - SOIL AMENDMENT ORGANIC MA CLASS II COMPOST. SOIL AND MULCH The civil plans call out thepatios as pervious pavers. Thelandscape plans call the patiosout as sandset pavers. Pleasemake all sheets consistent. Ifthe patios are to be used asstormwater treatment areassandset pavers do not meet thestandards of the URMP. Pleaseaddress. UP MASTER MORTAR SET TAO GRAY PAVING - 110 SF SAND-SET TAO GRAY PAVERS WITH PLANTED GAPS Demonstrate the TAO GreyPavers with planted gaps meetthe pervious paver specs of theUrban Runoff ManagementPlan. Landscape plan revised to call out pervious paving per the Civil Dwgs Landscape plan updated so that we are consistent with the Civil pervious call outs 08/10/2021