HomeMy WebLinkAboutFile Documents.430 W Hallam St.0291.2017 (77).ARBKEnge Markup Summary 2-28-2019
Page: 2
Author: mikeh
Date: 2/1/2019 9:01:44 AM
File Name: Clarification Set.430 W Hallam.2018.12.pdf
Please adjust micropile wall
location further west to prevent
excavation within existing
driplines.
Clarification Set.430 W Hallam.2018.12.pdf (10)
Page: 5
Author: mikeh
Date: 2/1/2019 9:02:51 AM
File Name: Clarification Set.430 W Hallam.2018.12.pdf
Layback in this location extends
excavation into driplines. Please
adjust plans to avoid any dripline
excavation.
Page: 13
Author: mikeh
Date: 2/1/2019 8:31:14 AM
File Name: Clarification Set.430 W Hallam.2018.12.pdf
Please provide easement exhibit
and language for transformer
easement. Exhibit and language
must be reviewed prior to permit
issuance, but project must
record easement and provide
reception number on as-built
prior to CO.
Page: 13
Author: mikeh
Date: 2/1/2019 8:44:06 AM
File Name: Clarification Set.430 W Hallam.2018.12.pdf
Please call out material and 18"
minimum separation between
taps.
Page: 13
Author: mikeh
Date: 2/1/2019 9:04:20 AM
File Name: Clarification Set.430 W Hallam.2018.12.pdf
A trench box must be utilized for
water service line excavation in
order to prevent excavation
within driplines of existing trees.
Please add note on plans.
44
'
-
4
14"
10'
-
3
"
790
5
426
W
H
A
L
L
A
M
S
T
R
E
E
T
0+80
1+20
1+00 Please adjust micropile wall location further west
to prevent excavation within existing driplines.
Layback in this location extendsexcavation into driplines. Please adjust
plans to avoid any dripline excavation.
Please provide easement exhibit and language for
transformer easement. Exhibit and language must bereviewed prior to permit issuance, but project must
record easement and provide reception number onas-built prior to CO.
Please call out material and 18"
minimum separation between taps.
A trench box must be utilized for water
service line excavation in order to
prevent excavation within driplines ofexisting trees. Please add note on plans.
Civil set has been updated to call out material and separation between taps.See sheet C5.
Civil set has been updated to include requested note. See sheet C5.
Page: 13
Author: mikeh
Date: 2/1/2019 8:43:33 AM
File Name: Clarification Set.430 W Hallam.2018.12.pdf
Please include inspection port
location and detail for future
inspections of rock bed.
Page: 14
Author: mikeh
Date: 2/1/2019 8:36:22 AM
File Name: Clarification Set.430 W Hallam.2018.12.pdf
Inverts do not appear to work in
this location. Please adjust
plans.
Page: 16
Author: mikeh
Date: 2/1/2019 8:40:41 AM
File Name: Clarification Set.430 W Hallam.2018.12.pdf
Please include liner attachment
detail.
Page: 16
Author: mikeh
Date: 2/1/2019 8:40:14 AM
File Name: Clarification Set.430 W Hallam.2018.12.pdf
Please include water service
detail.
Page: 18
Author: mikeh
Date: 2/6/2019 7:13:58 AM
File Name: Clarification Set.430 W Hallam.2018.12.pdf
Trash enclosure must be located
on private property. Please
adjust plans.
Please include inspection port location anddetail for future inspections of rock bed.
Inverts do not appear
to work in this location.
Please adjust plans.
Please include liner
attachment detail.
Please include water
service detail.
STEEL BEAR PROOF
ENCLOSURE
34"-1" ROUNDED ROCK
MULCH
Trash enclosure must
be located on private
property. Please adjust
plans.
Civil set has been updated. See sheet C6.
Civil set has been updated to include requested detail. See sheet C8.
Civil set has been updated to include inspection port. See sheet C5 for location and sheet
C8 for detail.
Civil set has been updated to include City of Aspen Water Details. See sheet C9.