Loading...
HomeMy WebLinkAboutFile Documents.430 W Hallam St.0291.2017 (77).ARBKEnge Markup Summary 2-28-2019 Page: 2 Author: mikeh Date: 2/1/2019 9:01:44 AM File Name: Clarification Set.430 W Hallam.2018.12.pdf Please adjust micropile wall location further west to prevent excavation within existing driplines. Clarification Set.430 W Hallam.2018.12.pdf (10) Page: 5 Author: mikeh Date: 2/1/2019 9:02:51 AM File Name: Clarification Set.430 W Hallam.2018.12.pdf Layback in this location extends excavation into driplines. Please adjust plans to avoid any dripline excavation. Page: 13 Author: mikeh Date: 2/1/2019 8:31:14 AM File Name: Clarification Set.430 W Hallam.2018.12.pdf Please provide easement exhibit and language for transformer easement. Exhibit and language must be reviewed prior to permit issuance, but project must record easement and provide reception number on as-built prior to CO. Page: 13 Author: mikeh Date: 2/1/2019 8:44:06 AM File Name: Clarification Set.430 W Hallam.2018.12.pdf Please call out material and 18" minimum separation between taps. Page: 13 Author: mikeh Date: 2/1/2019 9:04:20 AM File Name: Clarification Set.430 W Hallam.2018.12.pdf A trench box must be utilized for water service line excavation in order to prevent excavation within driplines of existing trees. Please add note on plans. 44 ' - 4 14" 10' - 3 " 790 5 426 W H A L L A M S T R E E T 0+80 1+20 1+00 Please adjust micropile wall location further west to prevent excavation within existing driplines. Layback in this location extendsexcavation into driplines. Please adjust plans to avoid any dripline excavation. Please provide easement exhibit and language for transformer easement. Exhibit and language must bereviewed prior to permit issuance, but project must record easement and provide reception number onas-built prior to CO. Please call out material and 18" minimum separation between taps. A trench box must be utilized for water service line excavation in order to prevent excavation within driplines ofexisting trees. Please add note on plans. Civil set has been updated to call out material and separation between taps.See sheet C5. Civil set has been updated to include requested note. See sheet C5. Page: 13 Author: mikeh Date: 2/1/2019 8:43:33 AM File Name: Clarification Set.430 W Hallam.2018.12.pdf Please include inspection port location and detail for future inspections of rock bed. Page: 14 Author: mikeh Date: 2/1/2019 8:36:22 AM File Name: Clarification Set.430 W Hallam.2018.12.pdf Inverts do not appear to work in this location. Please adjust plans. Page: 16 Author: mikeh Date: 2/1/2019 8:40:41 AM File Name: Clarification Set.430 W Hallam.2018.12.pdf Please include liner attachment detail. Page: 16 Author: mikeh Date: 2/1/2019 8:40:14 AM File Name: Clarification Set.430 W Hallam.2018.12.pdf Please include water service detail. Page: 18 Author: mikeh Date: 2/6/2019 7:13:58 AM File Name: Clarification Set.430 W Hallam.2018.12.pdf Trash enclosure must be located on private property. Please adjust plans. Please include inspection port location anddetail for future inspections of rock bed. Inverts do not appear to work in this location. Please adjust plans. Please include liner attachment detail. Please include water service detail. STEEL BEAR PROOF ENCLOSURE 34"-1" ROUNDED ROCK MULCH Trash enclosure must be located on private property. Please adjust plans. Civil set has been updated. See sheet C6. Civil set has been updated to include requested detail. See sheet C8. Civil set has been updated to include inspection port. See sheet C5 for location and sheet C8 for detail. Civil set has been updated to include City of Aspen Water Details. See sheet C9.