Loading...
HomeMy WebLinkAboutFile Documents.614 North St.0248.2017 (108).ARBK te1of7 �y??gg ZONING REVIEW CHECK LIST 1r ',�f [��f/ of;� .{, '`/ a/—7 r'TI 7�.67‹,_... Date: I Permit# <t � Address: : / L �f. e," Legal: Parcel ID# : Zone District: }` Scope of work: ❑ New Construction ❑ Remodel/Addition ❑ Demolition/Relocation ❑ Single Family ❑ Duplex ❑ Accessory Structure ❑ Commercial ❑ Lodging 0 Mixed-Use • El Multi—Family Number of Units ❑ Employee Housing Number of Units Approvals Attached? Variances? Approvals Resolution Reception number,book and page,etc. Ordinance Aspen City Council HPC P & Z / Administrative Variances Other Approval Drawings Attached? HOA Foini? Zoning Compliance Fonn Notes: SURVEY: SURVEY HAS: r Steep Slopes A/ _ 20-30% ✓ 30%+ / Easements f" Property Lines `-•1 Fences •\J Topographic lines iJi`✓l V✓. {-.:_.-�A.✓��\ i,,.'LL�•^E,' [? l P ti 'i".� f/tiff a 7 ;ef- t .. a• r C Page 2 of 7 Lot Size Reductions: 20-30% X SO% = 30% 'X 100% = Easement X 100% = TOTAL = GROSS LOT SIZE TOTAL REDUCTIONS NET LOT AREA C.--6; i• SITE: Setbacks? Building Envelope? Setbacks from approvals? 47 Zoning Rules: f. Front 1 1 Side Combined Side U Rear I C.)I Garage Distance Between Buildings Minimum size lot needed per zoning: Single Family Duplex Site plan? SITE PLAN HAS: Property Lines Setbacks Building Envelope Fences Parking #of spaces AC units Patios Window Wells in the setbacks? Size Site walls Site Coverage Required? %Required %Proposed Micropile or Ground nals? , Shown as within property lines? Notes: Page 3 of i ## 11 4^'' FLOOR AREA: Net Lot Arca 6f-0 Garage -250= <250 then /2= Add to FA >250 then - 125 = Add to FA Allowed FA Existing FA Proposed FA New Additional FA 217 ` (57,102,. i 2.7 L.97, 3 c Allowed Deck Proposed Deck Deck being added to FA DUPLEX: Unit A: Proposed FA: Credit: Unit B: Proposed FA: ; Credit: Notes: I( HEIGHT Arch 1 D O = Site '7 81�1 - s Height over Topography sheet? Sheet# Maximum allowable Height Per Zoning? Per Approvals? lProposed Height: Roof Pitch Measure to: Elevations: ` Max Height Line Shown? Natural Grade shown and labeled? • Finished Grade shown and labeled? Notes: ;i;: ~fir Page 4 of 7 LIGHTING Exterior Light Plan? Pictures of Lights Notes: RDS Signed Checklist? Notes: fR 9 Ej Impact Fees: Fees Waived? Per School land TDM Parks Existing SF /1,000 x .16= FTE's (First 4,500SF) .32 = FTE's (Greater than 4,500SF) Total Existing FTE's Proposed SF /1,000 x 16= FTE's (First 4,500SF) 32= FTE's (Greater than 4,500SF) Total Proposed FTE's Amount of FTE's applicant must mitigate for If <or= .1 than use A below I i >.1 than use B below A) FTE's: x $320,186 = B) Can use all credits or a combination of.1 cash plus credits Notes: Page 5 of 7 } COMMENTS: 1. Site Plan: 2. FA: } Page 6 of 7 3. Height: 4. Lighting: 5, RDS: 6. Fees: IJ1' f. {I Page 7 of 7 7. Other { � f