HomeMy WebLinkAboutFile Documents.754 Moore Dr.0193.2019 (19).ARBK
Page 1 of 7
MEMO
Project: 21523.00 – Lot 12 (754 Moore Drive)
Permit No.: 0034.2018.ARBK
Subject: Supplemental Information
Date: 05 February 2020
To: John Barker, Lead Permit Coordinator
From: Mark Hardeman, Rowland+Broughton Architecture & Urban Design
Cc:
Narrative of Revisions:
Drawings –
Civil:
C3.0
o Basin 2 calculation revision
C4.0
o Update drainage at main entry planters
o Update pool patio drainage
C5.0
o Revise sub-basin pipe flows
C6.0
o Add retaining wall and revise grade at driveway gate
o Revise mechanical area south of the house
o Revise surface material at main entry planters
o Revise west slot drain location at pool patio
o Raise elevation of pool and spa for constructability
o Increase east pool patio size
o Revise BBQ patio drainage
o Revise steps from BBQ area to grass area
o Remove planter and inlet C1
o Adjusted wall length to match landscape
o Slot drain catch basin removed
o End cap and pipe outlet to planter inlet F4 added
C7.0
o Add retaining wall and revise grade at driveway gate
02/11/2020
C8.0
o Revised drain and inlet information
o Revise storm system at entry area planters
o Revise storm system at north pool patio
o Revise storm system at planter east of Family Room
o Revise storm system between pool and spa
C9.0
o Revise storm system profiles to show updated piping networks
C10.0
o On the utilities sheet, the engineering department required several changes to the
water tap. Previously the drawings were calling out to abandon the existing tap. This
tap is now proposed to be utilized if it is in good condition. The City requires a straight
alignment from the road if the existing tap is unusable.
Landscape:
L0-04
o Updated plant list
L3-01
o Updated auto court and reduced planting area
L3-02
o Updated auto court and reduced planting area
o Updated number of site stairs at the spa and grill area
o Added ski access gate
o Updated pool deck slot drain location
o Removed planting area east of garage and replaced with snowmelt concrete
L4-01
o Updated auto court and reduced planting area
L4-02
o Updated notes about pavers
o Updated pool terrace, expanded size
o Updated number of site stairs at the spa and the grill area
o Updated grill location and counter configuration
L6-01
o Drawing was a place holder in Building Permit
o Drawing is active now with site lighting information added
o Updated site outlet locations
o Added address marker lighting
L6-02
o Drawing was a place holder in Building Permit
o Drawing is active now with site lighting information added
o Added holiday lighting outlet near grill
o Revised grill area sconce lights
L7-01
o Moved snow melt tubing to mortar
o Updated paver thickness
L7-02
o Updated tile band pattern
L7-03
o Note about number of stairs varies
o Updated wall flashing to match architecture
L7-04
o Updated wall flashing to match architecture
02/11/2020
L7-07
o Previous sheet L7-07 in now sheet L7-08
o New cable rail light details
o Removed pedestal outlet detail
o Added site lighting notes
o Added grill wall sconce details
L7-08
o Previous sheet L7-08 is now sheet L7-09
o Added site lighting notes
o Updated fire feature to reflect coordination with structural slab and drain connection
o Note added to fire feature about design-build to 18” height
L7-09
o Previous sheet L7-09 is now sheet L7-10
o Add site lighting notes
o Revise details to show client approved BBQ
o Added wall sconce
L7-10
o Previous sheet L7-10 is now sheet L7-11
o Added site lighting notes
o Revised detail 2
o Added lighting to address marker
L7-11
o Previous sheet L7-11 is now sheet L7-12
o Add site lighting notes
L7-12
o Previous sheet L7-12 is now sheet L7-13
o Elevation 2 updated with cable railing post size changes
o Add site lighting notes
L7-13
o Previous sheet L7-13 is now sheet L7-14
o Updated elevation to show location of ski access gate
L7-14
o Section 4 updated with spa stair changes
o Add site lighting notes
L7-15
o New Sheet
o Added ski access gate details
L8-01
o Spruce trees removed from plan
L8-02
o Spruce trees reconfigured on the plan
L9-01
o Reduced planting area at auto court and expanded reinforced turf area
L9-02
o Reduced planting area at auto court
o Planting reduction at expanded pool terrace
o Removed shrubs near grill area due to expanded wall per architecture
02/11/2020
Architectural:
A2.0
o Revised main stair configuration (flipped stair runs)
o Omit Storage 025, reconfigure Storage 031 and 032
A2.0A
o Revised main stair configuration (flipped stair runs)
o Revised dimensions at main stair
A2.0F
o Revised main stair configuration (flipped stair runs)
o Revised floor finishes
A2.1
o Revised layout of Pantry 118, Powder 119 and Mud 120
o Removed plumbing from Wet Bar 104
o Removed dish washer from Pantry 118
o Moved refrigerator and freezer from Pantry 118 to Kitchen 117
o Moved undercounter ice maker from Pantry 118 to Bar 104
o Revised main stair configuration (flipped stair runs)
A2.1A
o Revised dimensions of Pantry 118, Powder 119 and Mud 120
o Revised main stair configuration (flipped stair runs)
A2.1F
o Revised layout of Pantry 118, Powder 119 and Mud 120
o Revised main stair configuration (flipped stair runs)
o Revised floor finishes
A2.2
o Revised main stair configuration (flipped stair runs)
A2.2A
o Revised main stair configuration (flipped stair runs)
A2.2F
o Revised main stair configuration (flipped stair runs)
o Revised floor finishes
A3.0
o Revised lighting layout
o Added dimensions to locate lighting
o Added toe kick lighting in Powder and Bathrooms
o Added mirror lighting in Bathrooms
o Added soffit in Corridor 011 east of Gym 012
o Revised Storage 031 and 032 layout and lighting
o Revised ceiling finishes
A3.1
o Revised lighting layout
o Added dimensions to locate lighting
o Added toe kick lighting in Powder and Bathrooms
o Added mirror lighting in Bathrooms
o Revised main stair configuration
A3.2
o Revised lighting layout
o Added dimensions to locate lighting
o Added toe kick lighting in Powder and Bathrooms
o Added mirror lighting in Bathrooms
A6.1
o Revised stair elevation to match revised stair configuration
02/11/2020
A6.11
o Revised stair configuration
o Added additional dimensions and notes
A6.12
o Revised stair sections to match revised stair configuration
A6.13
o Revised stair sections to match revised stair configuration
A6.14
o Revised stair sections to match revised stair configuration
A6.15
o Revised sheet to show additional stair section
A6.16
o Formerly Sheet A6.15
o Revised/ omitted stair details to match revised stair configuration
A8.7
o New sheet
o Added Lighting Schedule
o Added Decorative Lighting Schedule
o Added Millwork Hardware Schedule
A8.13
o New sheet
o Added hollow metal door and frame details
o Added interior toilet room door jamb details
o Added exterior wood screen detail
A8.14
o New sheet
o Added hollow metal door and frame details
o Added shower door and enclosure details
o Added glass pocket door details
A8.15
o New sheet
o Added interior shower and toilet door details
A8.16
o New sheet
o Added interior door details
A8.17
o New sheet
o Added hollow metal door and frame details
o Added interior pocket door details
A8.20
o Added exterior window details
A8.22
o New Sheet
o Added window details
Structural:
S2.0
o Add column footing at Grid G north of Grid 1
S2.1
o Add structure and notes between Grid F to G+ and Grid 1 to 4
02/11/2020
S4.17
o New sheet
o Add details
S6.0
o Revise pool foundation plan
S6.3
o New sheet
o Add pool foundation details
Mechanical:
· M2.0
o Revised stair layout
o Relocated Storage 031 exhaust fan
· M2.1
o Adjusted ductwork for Mud/ Pantry plan change
o Adjusted Dining room supply and return air grilles to accommodate field conditions
o Adjusted Kitchen hood exhaust termination location to accommodate field conditions
o Adjusted Vestibule return air location to accommodate field conditions
· M2.2
o Adjusted supply and return air grille locations to accommodate field conditions
Electrical:
E0.1
o Added dryer booster fan DBF-1 and unit heater UH-2
E0.2
o Recircuited all panels
E1.1
o Adjusted power locations per landscape coordination
E2.0
o Adjusted power locations per interior design changes
o Adjusted power locations per AV plans
o Recircuited the basement level
E2.1
o Adjusted power locations per interior design changes
o Adjusted power locations per AV plans
o Recircuited the main level
E2.2
o Adjusted power locations per interior design changes
o Adjusted power locations per AV plans
o Recircuited the upper level
E2.3
o Recircuited the roof
EL2.0
o Added basement lighting control sheet
o Circuited basement lighting
o Adjusted lighting plans per lighting designer
EL2.1
o Added main level lighting control sheet
o Circuited main level lighting
o Adjusted lighting plans per lighting designer
02/11/2020
EL2.2
o Added upper level lighting control sheet
o Circuited upper level lighting
o Adjusted lighting plans per lighting designer
Thank You,
Mark Hardeman
02/11/2020