Loading...
HomeMy WebLinkAboutFile Documents.754 Moore Dr.0193.2019 (20).ARBK Page 1 of 7 MEMO Project: 21523.00 – Lot 12 (754 Moore Drive) Permit No.: 0034.2018.ARBK Subject: Supplemental Information Date: 05 February 2020 To: John Barker, Lead Permit Coordinator From: Mark Hardeman, Rowland+Broughton Architecture & Urban Design Cc: Narrative of Revisions: Drawings – Civil:  C3.0 o Basin 2 calculation revision  C4.0 o Update drainage at main entry planters o Update pool patio drainage  C5.0 o Revise sub-basin pipe flows  C6.0 o Add retaining wall and revise grade at driveway gate o Revise mechanical area south of the house o Revise surface material at main entry planters o Revise west slot drain location at pool patio o Raise elevation of pool and spa for constructability o Increase east pool patio size o Revise BBQ patio drainage o Revise steps from BBQ area to grass area o Remove planter and inlet C1 o Adjusted wall length to match landscape o Slot drain catch basin removed o End cap and pipe outlet to planter inlet F4 added  C7.0 o Add retaining wall and revise grade at driveway gate 02/11/2020  C8.0 o Revised drain and inlet information o Revise storm system at entry area planters o Revise storm system at north pool patio o Revise storm system at planter east of Family Room o Revise storm system between pool and spa  C9.0 o Revise storm system profiles to show updated piping networks  C10.0 o On the utilities sheet, the engineering department required several changes to the water tap. Previously the drawings were calling out to abandon the existing tap. This tap is now proposed to be utilized if it is in good condition. The City requires a straight alignment from the road if the existing tap is unusable. Landscape:  L0-04 o Updated plant list  L3-01 o Updated auto court and reduced planting area  L3-02 o Updated auto court and reduced planting area o Updated number of site stairs at the spa and grill area o Added ski access gate o Updated pool deck slot drain location o Removed planting area east of garage and replaced with snowmelt concrete  L4-01 o Updated auto court and reduced planting area  L4-02 o Updated notes about pavers o Updated pool terrace, expanded size o Updated number of site stairs at the spa and the grill area o Updated grill location and counter configuration  L6-01 o Drawing was a place holder in Building Permit o Drawing is active now with site lighting information added o Updated site outlet locations o Added address marker lighting  L6-02 o Drawing was a place holder in Building Permit o Drawing is active now with site lighting information added o Added holiday lighting outlet near grill o Revised grill area sconce lights  L7-01 o Moved snow melt tubing to mortar o Updated paver thickness  L7-02 o Updated tile band pattern  L7-03 o Note about number of stairs varies o Updated wall flashing to match architecture  L7-04 o Updated wall flashing to match architecture 02/11/2020  L7-07 o Previous sheet L7-07 in now sheet L7-08 o New cable rail light details o Removed pedestal outlet detail o Added site lighting notes o Added grill wall sconce details  L7-08 o Previous sheet L7-08 is now sheet L7-09 o Added site lighting notes o Updated fire feature to reflect coordination with structural slab and drain connection o Note added to fire feature about design-build to 18” height  L7-09 o Previous sheet L7-09 is now sheet L7-10 o Add site lighting notes o Revise details to show client approved BBQ o Added wall sconce  L7-10 o Previous sheet L7-10 is now sheet L7-11 o Added site lighting notes o Revised detail 2 o Added lighting to address marker  L7-11 o Previous sheet L7-11 is now sheet L7-12 o Add site lighting notes  L7-12 o Previous sheet L7-12 is now sheet L7-13 o Elevation 2 updated with cable railing post size changes o Add site lighting notes  L7-13 o Previous sheet L7-13 is now sheet L7-14 o Updated elevation to show location of ski access gate  L7-14 o Section 4 updated with spa stair changes o Add site lighting notes  L7-15 o New Sheet o Added ski access gate details  L8-01 o Spruce trees removed from plan  L8-02 o Spruce trees reconfigured on the plan  L9-01 o Reduced planting area at auto court and expanded reinforced turf area  L9-02 o Reduced planting area at auto court o Planting reduction at expanded pool terrace o Removed shrubs near grill area due to expanded wall per architecture 02/11/2020 Architectural:  A2.0 o Revised main stair configuration (flipped stair runs) o Omit Storage 025, reconfigure Storage 031 and 032  A2.0A o Revised main stair configuration (flipped stair runs) o Revised dimensions at main stair  A2.0F o Revised main stair configuration (flipped stair runs) o Revised floor finishes  A2.1 o Revised layout of Pantry 118, Powder 119 and Mud 120 o Removed plumbing from Wet Bar 104 o Removed dish washer from Pantry 118 o Moved refrigerator and freezer from Pantry 118 to Kitchen 117 o Moved undercounter ice maker from Pantry 118 to Bar 104 o Revised main stair configuration (flipped stair runs)  A2.1A o Revised dimensions of Pantry 118, Powder 119 and Mud 120 o Revised main stair configuration (flipped stair runs)  A2.1F o Revised layout of Pantry 118, Powder 119 and Mud 120 o Revised main stair configuration (flipped stair runs) o Revised floor finishes  A2.2 o Revised main stair configuration (flipped stair runs)  A2.2A o Revised main stair configuration (flipped stair runs)  A2.2F o Revised main stair configuration (flipped stair runs) o Revised floor finishes  A3.0 o Revised lighting layout o Added dimensions to locate lighting o Added toe kick lighting in Powder and Bathrooms o Added mirror lighting in Bathrooms o Added soffit in Corridor 011 east of Gym 012 o Revised Storage 031 and 032 layout and lighting o Revised ceiling finishes  A3.1 o Revised lighting layout o Added dimensions to locate lighting o Added toe kick lighting in Powder and Bathrooms o Added mirror lighting in Bathrooms o Revised main stair configuration  A3.2 o Revised lighting layout o Added dimensions to locate lighting o Added toe kick lighting in Powder and Bathrooms o Added mirror lighting in Bathrooms  A6.1 o Revised stair elevation to match revised stair configuration 02/11/2020  A6.11 o Revised stair configuration o Added additional dimensions and notes  A6.12 o Revised stair sections to match revised stair configuration  A6.13 o Revised stair sections to match revised stair configuration  A6.14 o Revised stair sections to match revised stair configuration  A6.15 o Revised sheet to show additional stair section  A6.16 o Formerly Sheet A6.15 o Revised/ omitted stair details to match revised stair configuration  A8.7 o New sheet o Added Lighting Schedule o Added Decorative Lighting Schedule o Added Millwork Hardware Schedule  A8.13 o New sheet o Added hollow metal door and frame details o Added interior toilet room door jamb details o Added exterior wood screen detail  A8.14 o New sheet o Added hollow metal door and frame details o Added shower door and enclosure details o Added glass pocket door details  A8.15 o New sheet o Added interior shower and toilet door details  A8.16 o New sheet o Added interior door details  A8.17 o New sheet o Added hollow metal door and frame details o Added interior pocket door details  A8.20 o Added exterior window details  A8.22 o New Sheet o Added window details Structural:  S2.0 o Add column footing at Grid G north of Grid 1  S2.1 o Add structure and notes between Grid F to G+ and Grid 1 to 4 02/11/2020  S4.17 o New sheet o Add details  S6.0 o Revise pool foundation plan  S6.3 o New sheet o Add pool foundation details Mechanical: · M2.0 o Revised stair layout o Relocated Storage 031 exhaust fan · M2.1 o Adjusted ductwork for Mud/ Pantry plan change o Adjusted Dining room supply and return air grilles to accommodate field conditions o Adjusted Kitchen hood exhaust termination location to accommodate field conditions o Adjusted Vestibule return air location to accommodate field conditions · M2.2 o Adjusted supply and return air grille locations to accommodate field conditions Electrical:  E0.1 o Added dryer booster fan DBF-1 and unit heater UH-2  E0.2 o Recircuited all panels  E1.1 o Adjusted power locations per landscape coordination  E2.0 o Adjusted power locations per interior design changes o Adjusted power locations per AV plans o Recircuited the basement level  E2.1 o Adjusted power locations per interior design changes o Adjusted power locations per AV plans o Recircuited the main level  E2.2 o Adjusted power locations per interior design changes o Adjusted power locations per AV plans o Recircuited the upper level  E2.3 o Recircuited the roof  EL2.0 o Added basement lighting control sheet o Circuited basement lighting o Adjusted lighting plans per lighting designer  EL2.1 o Added main level lighting control sheet o Circuited main level lighting o Adjusted lighting plans per lighting designer 02/11/2020  EL2.2 o Added upper level lighting control sheet o Circuited upper level lighting o Adjusted lighting plans per lighting designer Thank You, Mark Hardeman 02/11/2020