Loading...
HomeMy WebLinkAboutFile Documents.533 W Hallam St.0031-2022-BCHO (11)SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK SEE NOTES #1 PLANS It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. sophiev 08/25/2022ZONING “A Written Narrative” • The house was set 0.3' higher in space than what was originally permitted. The change in overall heights and grading can be seen on- (Architectural Sheets) G012 ROOF HEIGHTS, (Civil Sheets) C4 Grading & Drainage Plan • We have maintained the grade relationship to the historic house, and the new house. the grade raised as the house raised in space. We also are now sloping the patio given that the entire system has changed. The impact of the patio to grade elevations can be seen on (Architectural Sheets) A102a, SITE DETAILS, Clouded Details 3, 4, 5, and 6, A102b SITE DETAILS, Clouded Details 1 and 2 A401 ELEVATIONS – NORTH, Clouded areas A402 ELEVATIONS – WEST, Clouded areas A403 ELECATIONS – SOUTH, Clouded areas A404 ELEVATIONS – EAST, Clouded areas A411a PATIO SECTIONS, Clouded Sections 2, 3, and 4 A812 DETAILS – EXTERIOR, Clouded Detail 5 (Civil Sheets) C4 Grading & Drainage Plan – Clouded entire plan as all points against house changed. Reference 10.Drainage-Report 533 W Hallam Change Order #2 03172022 • We have changed from a previous paver system to a solid sloped patio system. Also, the overall pattern changed slightly. The paver changes can be seen on (Architectural Sheets) G011 RREMP PLAN, See the Clouded RREMP AREA calculations in the upper right corner, and the clouded area on the left of the sheet by the garage and lightwell adjacent to the garage. A101 ARCHITECTURAL SITE PLAN, A102a SITE DETAILS, Clouded Details 3, 4, 5, and 6, A102b SITE DETAILS, Clouded Details 1 and 2 A411a PATIO SECTIONS, Clouded Sections 2, 3, and 4 A801 ASSEMBLIES – FLOOR, Clouded Assemblies F-10 and F-11 A805 ASSEMBLIES – ROOF, Clouded Assembly R-1 A812 DETAILS – EXTERIOR, Clouded Details, 5, 6, 7, and 10 • The snow melt has expanded around where the garage skirt is located, and around the lightwell on the south east side of the house. (Architectural Sheets) G011 RREMP PLAN – See the Clouded RREMP AREA calculations in the upper right corner, and the clouded area on the left of the sheet by the garage and lightwell adjacent to the garage. (Mechanical Sheets) M-002 MECHANICAL SCHEMATICS & SEQUENCE – See clouded area. M-120 CRAWLSPACE MECHANICAL PIPING PLAN – See clouded area. M-121 LOWER LEVEL MECHANICAL PIPING PLAN – See clouded area. M-122 FIRST FLOOR MECHANICAL PIPING PLAN – See clouded area M-600 MECHANICAL SCHEDULES – See clouded areas. Reference 10.533 W Hallam RREMP Calculations 03.17.2022 • We are not a part of the Moratorium. Reference 10.533 W Hallam Moratorium Exemption Application 2021_032832022 Please let us know if something is not clear. 05/17/2022 As-built survey/height will be verified as part of the final inspection. External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ X 0031-2022-BCHO MASTER 0285.2018.ARBK 9/7/22 1236.75 SQ.FT. HYDRONIC G010, G007 95% 128,000 BTU/HR GSHP SYSTEM JH APPLICATION ACCEPTED DATE: 2022-05-17 PERMIT NUMBER: 0031-2022-BCHO COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT COVERSHEET PROPERTY INFORMATION ADDRESS: 533 W HALLAM ST UNIT: PARCEL ID: 273512432001 LEGAL DESCRIPTION: CITY AND TOWNSITE OF ASPEN OWNER: DUNCAN SKIHAUS LLC PERMIT CONTRACTOR: DESCRIPTION OF WORK The house was set 0.3' higher in space than what was originally permitted. We have maintained the grade relationship to the historic house, and the new house. the grade raised as the house raised in space. We have changed from a pervious paver system to a solid patio system. The snow melt has expanded around where the garage skirt is located, and around the lightwell on the south east side of the house. We have almost everything together that was asked for in the pre -app email except for a Survey. The Surveyor cannot put one together because the project is under construction and there is no way to shoot points in any way that would be useful to any of us. The only thing they were able to do is to establish what the 100’ benchmark elevation of the house is at now. USE OF BUILDING Single Family FIRE SPRINKLER REQUIRED? Yes CLASS OF WORK Residential FIRE SPRINKLER TYPE NFPA 13 D BUILDING TYPE (IRC) One family REQUIRED SPECIAL INSPECTIONS CONSTRUCTION TYPE VB ENERGY CODE COMPLIANCE OCCUPANCY GROUP (IBC) R -1 WORK CHANGES BUILDING FOOTPRINT? No CODE EDITIONS 2015 IRC TOTAL SPA SQ.FT. OTHER CODE EDITIONS TOTAL SNOWMELT SQ.FT. 1,237 HISTORIC PROPERTY? Yes TOTAL POOL SQ.FT. FIRE SPRINKLER EXISTING? Yes 09/08/2022 justinh SEE NOTES #1 PLANS 0031-2022-BCHO Master: 0285.2 Duncan Skihaus LLC 533 W Hallam 273512432001 85.2018.ARBK 2 REVIEWED FOR COMPLIANCE 10/06/2022 sarahy BY HPC