Loading...
HomeMy WebLinkAboutFile Documents.1322 Snowbunny Ln.0035-2021-BCHO (14)These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ X 0035-2021-BCHO 10/18/21 872 SQ.FT. 105 SQ.FT. A101 & M1.02 95% NONE JH 10/18/2021 justinh SEE NOTES #1 PLANS SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S All snowmelt systems shall meet the following: - Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. - R10 insulation shall be installed under the area to be snowmelted or R5 insulation shall be installed under the slab edges. (Ordinance 11 Series 2011) - Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2015 IECC R403.9 and C403.2.4.5) - Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2015 IECC R403.9 and C403.2.3.5) - Inspection by testing hydrostatically at 1.5 times max system design pressure, but not less than 100psi, for 15 minutes. (2015 IMC 1208.1) 06/24/2021 It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. 10/29/2021 sophiev