HomeMy WebLinkAboutFile Documents.219 E Durant Ave.0094.2018 (10).ACBKCOMcheck Software Version 4.1.1.0
Mechanical Compliance Certificate
Project Title:
2015 IECC
Project Type:Alteration
Location:Aspen, Colorado
Climate Zone:7
Construction Site:
219 East Durant Avenue
Unite C-5
Aspen, CO 81611
Owner/Agent:
Franz Thoma
Almresi Aspen
333 Bridge St.
Vail, CO 81657
f.thoma@thoma-essenerleben.de
Designer/Contractor:
IMEG Corporation
7600 East Orchard Road
Suite 250-S
Greenwood Village, CO 80111
Project Information
Energy Code:
Almresi - Aspen
Mechanical Systems List
Quantity System Type & Description
Gas Storage Water Heater, Capacity: 400 gallons, Input Rating: 75 kBtu/h w/ Circulation Pump
No minimum efficiency requirement applies
1 ST-1:
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Project Title:
Data filename:
Almresi - Aspen
C:\Temp Server\AA\IECC_Aspen.cck
02/21/19Report date:
61 ofPage
Mike J. Kissane - Senior Mechanical Designer 2-26-2019
03/17/2019
05/02/2019
justinh
Inspection Checklist
Requirements: 100.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.1.0
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
C103.2
[PR3]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the service water
heating systems and equipment and
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Almresi - Aspen
C:\Temp Server\AA\IECC_Aspen.cck
02/21/19Report date:
62 ofPage03/17/2019
Section
#
& Req.ID
Plumbing Rough-In Inspection Complies?Comments/Assumptions
C404.5,
C404.5.1,
C404.5.2
[PL6]3
Heated water supply piping conforms
to pipe length and volume
requirements. Refer to section details.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.6.1,
C404.6.2
[PL3]1
Automatic time switches installed to
automatically switch off the
recirculating hot-water system or heat
trace.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.6.3
[PL7]3
Pumps that circulate water between a
heater and storage tank have controls
that limit operation from startup to
<= 5 minutes after end of heating
cycle.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.7
[PL8]3
Water distribution system that pumps
water from a heated-water supply
pipe back to the heated-water source
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Almresi - Aspen
C:\Temp Server\AA\IECC_Aspen.cck
02/21/19Report date:
63 ofPage03/17/2019
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C402.2.6
[ME41]3
Thermally ineffective panel surfaces of
sensible heating panels have
insulation >= R-3.5.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.6.
2
[ME115]3
Enclosed parking garage ventilation
has automatic contaminant detection
and capacity to stage or modulate
fans to 50% or less of design capacity.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.8
[ME116]3
Kitchen exhaust systems comply with
replacement air and conditioned
supply air limitations, and satisfy hood
rating requirements and maximum
exhaust rate criteria.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.2.1
[ME111]2
Gas-fired water-heating equipment
installed in new buildings: where a
singular piece of water-heating
equipment >= 1,000 kBtu/h serves
the entire building, thermal efficiency
>= 90 Et. Where multiple pieces of
water-heating equipment serve the
building with combined rating >=
1,000 kBtu/h, the combined input-
capacity-weighted-average thermal
efficiency >= 90 Et. Exclude input
rating of equipment in individual
dwelling units and equipment <= 100
kBtu/h.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C408.2.2.
1
[ME53]3
Air outlets and zone terminal devices
have means for air balancing.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.5,
C403.5.1,
C403.5.2
[ME123]3
Refrigerated display cases, walk-in
coolers or walk-in freezers served by
remote compressors and remote
condensers not located in a
condensing unit, have fan-powered
condensers that comply with Sections
C403.5.1 and refrigeration compressor
systems that comply with C403.5.2..
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Almresi - Aspen
C:\Temp Server\AA\IECC_Aspen.cck
02/21/19Report date:
64 ofPage03/17/2019
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C404.3
[FI11]3
Heat traps installed on supply and
discharge piping of non-circulating
systems.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C404.4
[FI25]2
All piping insulated in accordance with
section details and Table C403.2.10.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.6.1
[FI12]3
Controls are installed that limit the
operation of a recirculation pump
installed to maintain temperature of a
storage tank. System return pipe is a
dedicated return pipe or a cold water
supply pipe.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Almresi - Aspen
C:\Temp Server\AA\IECC_Aspen.cck
02/21/19Report date:
65 ofPage03/17/2019
Project Title:
Data filename:
Almresi - Aspen
C:\Temp Server\AA\IECC_Aspen.cck
02/21/19Report date:
66 ofPage03/17/2019