Loading...
HomeMy WebLinkAboutFile Documents.219 E Durant Ave.0094.2018 (10).ACBKCOMcheck Software Version 4.1.1.0 Mechanical Compliance Certificate Project Title: 2015 IECC Project Type:Alteration Location:Aspen, Colorado Climate Zone:7 Construction Site: 219 East Durant Avenue Unite C-5 Aspen, CO 81611 Owner/Agent: Franz Thoma Almresi Aspen 333 Bridge St. Vail, CO 81657 f.thoma@thoma-essenerleben.de Designer/Contractor: IMEG Corporation 7600 East Orchard Road Suite 250-S Greenwood Village, CO 80111 Project Information Energy Code: Almresi - Aspen Mechanical Systems List Quantity System Type & Description Gas Storage Water Heater, Capacity: 400 gallons, Input Rating: 75 kBtu/h w/ Circulation Pump No minimum efficiency requirement applies 1 ST-1: Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Project Title: Data filename: Almresi - Aspen C:\Temp Server\AA\IECC_Aspen.cck 02/21/19Report date: 61 ofPage Mike J. Kissane - Senior Mechanical Designer 2-26-2019 03/17/2019 05/02/2019 justinh Inspection Checklist Requirements: 100.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.1.0 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2015 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR3]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Almresi - Aspen C:\Temp Server\AA\IECC_Aspen.cck 02/21/19Report date: 62 ofPage03/17/2019 Section # & Req.ID Plumbing Rough-In Inspection Complies?Comments/Assumptions C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable Requirement will be met. C404.6.1, C404.6.2 [PL3]1 Automatic time switches installed to automatically switch off the recirculating hot-water system or heat trace. Complies Does Not Not Observable Not Applicable Requirement will be met. C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable Requirement will be met. C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Almresi - Aspen C:\Temp Server\AA\IECC_Aspen.cck 02/21/19Report date: 63 ofPage03/17/2019 Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C402.2.6 [ME41]3 Thermally ineffective panel surfaces of sensible heating panels have insulation >= R-3.5. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.6. 2 [ME115]3 Enclosed parking garage ventilation has automatic contaminant detection and capacity to stage or modulate fans to 50% or less of design capacity. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C403.2.8 [ME116]3 Kitchen exhaust systems comply with replacement air and conditioned supply air limitations, and satisfy hood rating requirements and maximum exhaust rate criteria. Complies Does Not Not Observable Not Applicable Requirement will be met. C404.2.1 [ME111]2 Gas-fired water-heating equipment installed in new buildings: where a singular piece of water-heating equipment >= 1,000 kBtu/h serves the entire building, thermal efficiency >= 90 Et. Where multiple pieces of water-heating equipment serve the building with combined rating >= 1,000 kBtu/h, the combined input- capacity-weighted-average thermal efficiency >= 90 Et. Exclude input rating of equipment in individual dwelling units and equipment <= 100 kBtu/h. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C408.2.2. 1 [ME53]3 Air outlets and zone terminal devices have means for air balancing. Complies Does Not Not Observable Not Applicable Requirement will be met. C403.5, C403.5.1, C403.5.2 [ME123]3 Refrigerated display cases, walk-in coolers or walk-in freezers served by remote compressors and remote condensers not located in a condensing unit, have fan-powered condensers that comply with Sections C403.5.1 and refrigeration compressor systems that comply with C403.5.2.. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Almresi - Aspen C:\Temp Server\AA\IECC_Aspen.cck 02/21/19Report date: 64 ofPage03/17/2019 Section # & Req.ID Final Inspection Complies?Comments/Assumptions C404.3 [FI11]3 Heat traps installed on supply and discharge piping of non-circulating systems. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C404.4 [FI25]2 All piping insulated in accordance with section details and Table C403.2.10. Complies Does Not Not Observable Not Applicable Requirement will be met. C404.6.1 [FI12]3 Controls are installed that limit the operation of a recirculation pump installed to maintain temperature of a storage tank. System return pipe is a dedicated return pipe or a cold water supply pipe. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Almresi - Aspen C:\Temp Server\AA\IECC_Aspen.cck 02/21/19Report date: 65 ofPage03/17/2019 Project Title: Data filename: Almresi - Aspen C:\Temp Server\AA\IECC_Aspen.cck 02/21/19Report date: 66 ofPage03/17/2019