Loading...
HomeMy WebLinkAboutFile Documents.219 E Durant Ave.0094.2018 (13).ACBKPierce + Frye Architects  Vail & San Francisco 970.949.0899 Almresi Aspen, 219 E. Durant Ave, Unit C5     RE:  Permit Number:  0094.2018.ACBK  Building Plan Review Comments – Plan Check 2    April 11, 2019  Attn: Justin Hahn, Plans Examiner, City of Aspen   Phone:  970/429‐2784, Fax:  970/920‐5440,   Justin.Hahn@CityofAspen.com  John Barker, Permit Coordinator, City of Aspen   Phone:  970‐429‐2019  John.Barker@CityofAspen.com     Dear Justin and John,    Regarding your plan review comments for the above reference building permit, dated 3/29/18,  and the follow‐up email comments, dated 4/3/19, please see the attached drawings,  specifications and the responses below to plan review comments.    The drawings have been revised in response to your comments.  Each of the building plan  review comments have been addressed and resolved.  We have responded to each of the  building plan review comments and these are summarized below.      Building Plan Review Comments received on March 29, 2019 (attached):  Building Comments:  Architectural Item: Door swing must be in the direction of egress and panic hardware is required with an occupant load over 50 in an A occupancy, please revise throughout set and call out panic hardware in the schedule. 1. The swing has been revised for door number 8. It now swings in the direction of travel. The door swing has been revised on all affected plan sheets. 2. The door hardware description for door number 8 on the Door Schedule, sheet A3.0, has been revised to include panic hardware to comply with 2015 IBC section 1010.1.10 and other applicable code sections regarding the operation of panic hardware devices. Food Service Equipment Item: Sous Vide Cookers and Combi Oven are not shown under your ventless hood, both require a minimum of a type II hood as light duty cooking appliances that produce heat or moisture. Please revise plan to comply with IMC 507. 1. All affected drawings have been revised to show the Sous Vide Cookers under the ventless hood. 2. The electric Combi Oven includes a self-contained, Type II ventless hood. No revisions were made to plans or specs. 04/18/2019 Pierce + Frye Architects  Vail & San Francisco 970.949.0899 Mechanical Item: This is the initial occupancy of this space, there has not been any previous tenants and the provisions of the IEBC do not apply. Show that you fully meet the requirements of the IMC. Additionally, per IMC 501.1 ex 2 and 507.3 the kitchen should be calculated as being 900 SF because of the 7 cooking appliances and 2 dishwashers (each to be considered as occupying not less than 100 SF of space). 1. Please refer to separate responses to comments from consulting engineers (attached).   Building Plan Review Comments received on April 3, 2019 (attached):    Specifically: (to paraphrase the comments) The proposed Assembly space will have 50 or more  occupants and as such requires two accessible exits.  1. We have added a third exit that is identified as door number 10 on all affected plans. This exit will meet all accessibility standards as required by the 2015 IBC and the 2009 ICC A117.1 Accessible and Usable Buildings and Facilities. 2. Door number 10 has been added to the door schedule on sheet A3.0. The door hardware description includes panic hardware to comply with 2015 IBC section 1010.1.10 and other applicable code sections regarding the operation of panic hardware devices. 3. The new door is separated from the main exit by more than 1/3 the diagonal distance of the space. The additional accessible exit, door 10, is 21’-9” away from the existing accessible exit, door 07. The overall diagonal distance is 56’-2”. 1/3 of the diagonal distance equals 18’-9”.   Thank you for your prompt attention to these responses to your building plan review.  We  appreciate your efforts to process all of the information quickly.  Please don’t hesitate to call  with any questions.    Regards,    Tom Frye  Pierce + Frye Architects  970‐949‐0899 x2    Attachments:   Plan review comments received 3/29/19   Plan review comments received 4/3/19   Responses to mechanical plan review comments from MKK/IMEG Engineering    Revised Architectural, Food Service Equipment and Mechanical drawings via Drop Box link in email.  04/18/2019