HomeMy WebLinkAboutFile Documents.219 E Durant Ave.0094.2018 (18).ACBK
February 26, 2019
Tom Frye
Resort Design Architects
RE: Almresi Aspen
MKK Project Number: 2018.01.0077
Permit # – 0094-2018-ACBK
Dear Tom:
This letter is in response to the Plan Review Notice for the above mentioned project. See below for
comments received and MKK now IMEGs response.
Mechanical Items
Page M-1P Mechanical Parking Level.
I could not locate where the grease duct gage was called out on the plans or in the specifications and
I did not see where the kitchen exhaust makeup air operation was provided in any sequence of
operations. Please clarify where this information is provided or provide it if it is not currently in the
set.
MKK now IMEG Response: Grease ductwork and makeup air systems have been removed
from scope of work. Kitchen equipment has been revised for ventless operation, refer to
KEC drawings for further information.
Page M-10 Lower Level Mechanical Plan.
Clearly show the required type 1 exhaust hoods and makeup air per IMC 507 and 508. Provide
calculations for the hood sizing. Update your equipment schedules to show these items
MKK now IMEG Response: Ducted grease hoods and makeup air systems have been
removed from scope of work. Kitchen equipment has been revised for ventless operation,
refer to KEC drawings for further information.
Comcheck.
I Fill out the owner/agent portion on both the mechanical and lighting Comchecks
MKK now IMEG Response: Comcheck report information has been updated. See attached
revised reports.
Electrical Items
1) No spec was submitted for fixtures F & K. Fixture F is a 20W fixture per the luminaire schedule on
E4.0, you show it as a 2W fixture on this report. Fixture K shows as a custom pendant on the
schedule with a wattage of 3W/ft which doesn’t make sense for a pendant. I also don’t agree with
the fixture counts for F and K, please clarify. Provide cutsheets on both fixtures so that I may verify
the wattages proposed on this ComCheck, revise as needed.
MKK now IMEG Response: See attached update ComCheck calculations and cut sheets for
Fixtures F and K. Fixture K is 4.3 watts per foot @ 3’. Fixture F is 20 watts per sheet.
03/17/2019
February 26, 2018
Page 2
Please call if you have any questions or concerns.
Sincerely,
Ashlee R. Downham, PE, LEED AP
Senior Electrical Engineer\Senior Associate
Associate
Mike J. Kissane
Senior Mechanical Designer
03/17/2019