Loading...
HomeMy WebLinkAboutFile Documents.219 E Durant Ave.0094.2018 (18).ACBK February 26, 2019 Tom Frye Resort Design Architects RE: Almresi Aspen MKK Project Number: 2018.01.0077 Permit # – 0094-2018-ACBK Dear Tom: This letter is in response to the Plan Review Notice for the above mentioned project. See below for comments received and MKK now IMEGs response. Mechanical Items Page M-1P Mechanical Parking Level. I could not locate where the grease duct gage was called out on the plans or in the specifications and I did not see where the kitchen exhaust makeup air operation was provided in any sequence of operations. Please clarify where this information is provided or provide it if it is not currently in the set. MKK now IMEG Response: Grease ductwork and makeup air systems have been removed from scope of work. Kitchen equipment has been revised for ventless operation, refer to KEC drawings for further information. Page M-10 Lower Level Mechanical Plan. Clearly show the required type 1 exhaust hoods and makeup air per IMC 507 and 508. Provide calculations for the hood sizing. Update your equipment schedules to show these items MKK now IMEG Response: Ducted grease hoods and makeup air systems have been removed from scope of work. Kitchen equipment has been revised for ventless operation, refer to KEC drawings for further information. Comcheck. I Fill out the owner/agent portion on both the mechanical and lighting Comchecks MKK now IMEG Response: Comcheck report information has been updated. See attached revised reports. Electrical Items 1) No spec was submitted for fixtures F & K. Fixture F is a 20W fixture per the luminaire schedule on E4.0, you show it as a 2W fixture on this report. Fixture K shows as a custom pendant on the schedule with a wattage of 3W/ft which doesn’t make sense for a pendant. I also don’t agree with the fixture counts for F and K, please clarify. Provide cutsheets on both fixtures so that I may verify the wattages proposed on this ComCheck, revise as needed. MKK now IMEG Response: See attached update ComCheck calculations and cut sheets for Fixtures F and K. Fixture K is 4.3 watts per foot @ 3’. Fixture F is 20 watts per sheet. 03/17/2019 February 26, 2018 Page 2 Please call if you have any questions or concerns. Sincerely, Ashlee R. Downham, PE, LEED AP Senior Electrical Engineer\Senior Associate Associate Mike J. Kissane Senior Mechanical Designer 03/17/2019