HomeMy WebLinkAboutFile Documents.219 E Durant Ave.0094.2018 (19).ACBK
April 10, 2019
Tom Frye
Resort Design Architects
RE: Almresi Aspen
MKK Project Number: 2018.01.0077
Permit – 180810
Dear Tom:
This letter is in response to the Plan Review Notice for the above mentioned project. See below for
comments received and MKK now IMEGs response.
Mechanical Items
This is the initial occupancy of this space, there has not been any previous tenants and provisions
of the IEBC do not apply. Show that you fully meet the requirements of the IMC. Additionally,
per IMC 501.1 ex. 2 and 507.3 the kitchen should be calculated as being 900 SF because of the 7
cooking appliances and 2 dishwashers (each to be considered as occupying not less than 100 SF
of space).
1. Ventilation tables have been updated using IMC standards.
2. Kitchen has been adjusted for 900 SF
3. Note; the air handler for the original construction of the Chart house was purchased
during 2008 and commissioned for reuse during the final construction in 2016. The
building was designed under 2003 codes including 2003 APECC.
Please call if you have any questions or concerns.
Sincerely,
Wade N. Johnson, PE, LEED AP
Senior Mechanical Engineer\Senior Associate
Mike J. Kissane
Senior Mechanical Designer
04/18/2019