Loading...
HomeMy WebLinkAboutFile Documents.219 E Durant Ave.0094.2018 (19).ACBK April 10, 2019 Tom Frye Resort Design Architects RE: Almresi Aspen MKK Project Number: 2018.01.0077 Permit – 180810 Dear Tom: This letter is in response to the Plan Review Notice for the above mentioned project. See below for comments received and MKK now IMEGs response. Mechanical Items This is the initial occupancy of this space, there has not been any previous tenants and provisions of the IEBC do not apply. Show that you fully meet the requirements of the IMC. Additionally, per IMC 501.1 ex. 2 and 507.3 the kitchen should be calculated as being 900 SF because of the 7 cooking appliances and 2 dishwashers (each to be considered as occupying not less than 100 SF of space). 1. Ventilation tables have been updated using IMC standards. 2. Kitchen has been adjusted for 900 SF 3. Note; the air handler for the original construction of the Chart house was purchased during 2008 and commissioned for reuse during the final construction in 2016. The building was designed under 2003 codes including 2003 APECC. Please call if you have any questions or concerns. Sincerely, Wade N. Johnson, PE, LEED AP Senior Mechanical Engineer\Senior Associate Mike J. Kissane Senior Mechanical Designer 04/18/2019