Loading...
HomeMy WebLinkAboutFile Documents.506 E Main St.0054.2019 (27).ACBK 1 CR A F T B A L A N C E WH I M S Y 30 3 2 7 8 4 3 7 8 7 1 5 F O U R T E E N T H S T R E E T , G O L D E N , C O 8 0 4 01 AN D A R C H . C O M Building Permit Comment Responses Date: 2019.08.14 Project Name: 2017910 Pitkin County Courthouse Remodel 506 East Main Street, Aspen, Colorado Permit Number: 0054.2019.ACBK Code: 2015 IEBC, IBC Reviewer: Bonnie Muhigirwa Plans Examiner Community Development 2019.05.29 Mechanical pdf: M0.1 Mechanical Legend and Notes Thermostat heights to comply with reach ranges in ICC A117.1-2009.308 Response: Sheet M0.1, Mechanical Note, III Execution note C has been updated with the following language, “Thermostats shall be mounted at a maximum of 48” above finished floor to the top of the thermostat.” Per ICCA117.1-2009.308 2019.05.29 Pitkin Permit Electrical: ED1.0 Garden Level Electrical Plan 620.22, Branch Circuits for car lighting receptacle(s) ventilation, heating and air conditioning (A) Car light source. A separate branch circuit shall supply the car lights, receptacle(s) auxiliary lighting power source and ventilation on each elevator car. The over current device protecting the branch circuit shall be located in the elevator machine room or control room/machinery space or control space. Required lighting shall not be connected to the load side of the ground fault circuit interrupter. Response: Keynote #4, Sheet ED1.0 and keynote#17, Sheet E1.0 have been revised asking the contractor to verify the existing elevator cab lights are on a dedicated circuit to comply with NEC 620.22 (A). 2019.06.14 Pitkin Permit – Architectural: A1.0 Garden Level Floor Plan Per the code summary on G0.4, the occupant load in the garden level courtroom exceeds 50, correct the door swing so that the doors swing in the direction of egress travel per 2015 IEBC 805.4.2 08/21/2019 CR A F T B A L A N C E WH I M S Y 30 3 2 7 8 4 3 7 8 7 1 5 F O U R T E E N T H S T R E E T , G O L D E N , C O 8 0 4 01 AN D A R C H . C O M AN D E R S O N H A L L A S A R C H I T E C T S 2 Response: Courtroom 3 occupancy was calculated per the 2015IBC, Table 1004.1.2 Courtroom 40sf net per occupant Room Area load factor occupant load Courtroom 1,244sf 40sf per occ 32 total occupants Sheet A1.0 door swing from Court Room 3 remains unchanged. Sheet G.04 has been revised 2019.06.14 Pitkin Permit – Architectural: A1.0 Garden Level Floor Plan Per 2015 IEBC 705, 705.2, this alteration affects the area of primary function and therefore the toilet facilities serving the area of primary function shall be accessible to the maximum extent possible that is technically feasible. Revise door widths to provide clear openings widths of 32 inches minimum. Provide an accessible route toilet compartment, grab bars and under counter pipe protection in the men’s restroom. Response: No work is associated with Women’s Room 00C or Men’s Room 00D. Graphically, both restrooms have been updated to better reflect existing conditions. Doors 00C and 00D into the Women’s and Men’s restroom are not 32 inches clear. Due to the historic nature of the historic stone openings, increasing the size of the existing restroom doors is technically infeasible. Door stalls have been updated to reflect a 32inch clear opening. Door reach ranges, however, do not meet accessibility. Per 2015 IEBC: 705.1 General: Where compliance with this section, is technically infeasible, the alteration shall provide access to the maximum extent possible. Both Women’s Room 00C and Men’s Room 00D currently have horizontal grab bars. The project will provide new vertical grab bars per ANSI 604.5.1 Fixed Side Wall Grab Bars and pipe protection per ANSI 606.6 Exposed Pipes and Surfaces. Keynote 30 has been added on Sheet A1.0 to reflect the inclusion of fixed vertical grab bars and knee protection. The existing hardware is being removed and replaced with new accessibly compliant hardware Per the 2015 IEBC section 1204.1.4 toilet and Bathing Facilities: Where toilet rooms are provided, at least one accessible family or assisted-use toilet room complying with Section 1109.1.1 of the International Building Code shall be provided. Per the 2015 IBC section 1109.2.4.1 Location: Family or assisted-use toilet and bathing rooms shall be located on an accessible route. Family or assisted-use toilet rooms shall be located not more than one story above or below separate sex toilet rooms. The accessible route from any separate sex toilet room to a family or assisted-use toilet room shall not exceed 500 feet. 08/21/2019 CR A F T B A L A N C E WH I M S Y 30 3 2 7 8 4 3 7 8 7 1 5 F O U R T E E N T H S T R E E T , G O L D E N , C O 8 0 4 01 AN D A R C H . C O M AN D E R S O N H A L L A S A R C H I T E C T S 3 . Existing Women’s Room 114 and Men’s Room 113 on the Main Level will be made fully compliant (see following comments referencing A1.1 Main Level Floor Plan). In addition, all new restrooms will be fully accessible. Travel distance from the Garden Level to the Main Level is less than 500 feet Travel distance from the Second Level to the Main Level is less than 500 feet. 2019.06.14 Pitkin Permit – Architectural: A1.1 Main Level Floor Plan Per 2015 IEBC 705 and 705.2, this alteration affects that primary function and therefore the toilet facilities serving the area of primary function shall be accessible to the maximum extent that is technically feasible. Revise door widths to provide clear opening width of 32 inches minimum. Provide an accessible toilet compartment, grab bars and under counter pipe protection in men’s restroom. Response: No work is anticipated in Women’s Room 114 or Men’s Room 113. Men’s Restroom 113 was revised graphically to reflect the existing door swing properly. Both restrooms are accessible, however, are missing vertical grab bars and pipe protection. Both Women’s Room 114 and Men’s Room 114 currently have horizontal grab bars. The project will provide new vertical grab bars per ANSI 604.5.1 Fixed Side Wall Grab Bars and pipe protection per ANSI 606.6 Exposed Pipes and Surfaces. Keynote 30 has been added on Sheet A1.1 to reflect the inclusion of fixed vertical grab bars and knee protection. See updated sheet A1.1 2019.06.14 Pitkin Permit – Architectural: A5.0 Door Schedule 1. Confirm that the following 2’-10” doors provide the minimum clear width of 32” per 2015 IBC 1010.1:00, 04 100; 105C, 108A, 113. 114. 2020C, 203. Response: Doors 100, 105C, 108A, 113, 114, 202C and 203 are existing historic doors. The doors are hung within their original frames in deep masonry walls. On either side of the door are decorative moldings that are integral with the original transom above. The doors and trim are character defining features. Existing doors slabs are 34 inches wide and 1.75 inches thick. Existing doorstops are 3/8” thick. The clear opening is 31-7/8” clear. To provide a 32” clear opening would cause irrevocable damage to existing historic fabric and is technically infeasible per IEBC section1204.4 accessibility requirements, where compliance with the requirements would threaten or destroy the historic significance of the building or facility. Existing door hardware does not meet accessibility requirements. All existing hardware will be replaced and updated for compliance. Reference specification section 08 71 00 for door hardware schedule. 08/21/2019 CR A F T B A L A N C E WH I M S Y 30 3 2 7 8 4 3 7 8 7 1 5 F O U R T E E N T H S T R E E T , G O L D E N , C O 8 0 4 01 AN D A R C H . C O M AN D E R S O N H A L L A S A R C H I T E C T S 4 2019.06.14 Pitkin permit – Architectural: A5.0 Door Schedule Correct the following doors to provide the required 32” clear width per 2015 IBC 1010.1.1: 108B, 108C. Response: Doors 108B and 108 C are existing historic doors to remain with no work. On either side of the door are decorative moldings that are integral with the original transom above. The doors and trim are character defining features. Existing doors slabs are 2’-8” inches wide and 1.75 inches thick. Existing doorstops are 3/8” thick. The clear openings are 29-7/8” clear. To provide a 32” clear opening would cause irrevocable damage to existing historic fabric and is technically infeasible per IEBC section1204.4 accessibility requirements, where compliance with the requirements would threaten or destroy the historic significance of the building or facility. Existing door hardware does not meet accessibility requirements. All existing hardware will be replaced and updated for compliance. A new accessible office will be provided within the Probation Suite. The accessible door will provide a 32” clear opening. See sheet A1.1 2019.06.14 Pitkin Permit – Architectural: A7.3 Enlarged Plans at New Lift Entry 3’-5” Response: Sheet A7.3 has been updated to reflect a 42” clear side door opening at the main level. 2019.06.14 Pitkin Permit – Architectural: A7.3 Enlarged Plans at New Lift Entry Side door on lift require a clear opening width of 42” minimum. ICC A117.1-2009 410.2.1 Response: Sheet A7.3 has been updated to reflect a 42” clear side door opening at the main level. 08/21/2019 CR A F T B A L A N C E WH I M S Y 30 3 2 7 8 4 3 7 8 7 1 5 F O U R T E E N T H S T R E E T , G O L D E N , C O 8 0 4 01 AN D A R C H . C O M AN D E R S O N H A L L A S A R C H I T E C T S 5 2019.06.14 Pitkin Permit – Architectural: A9.2 Interior Elevations Knee and toe clearances must be provided at the jury deliberation sinks. ICC A117.1-2009 606.2. Response: The following drawings have been updated to reflect a front approach to new sinks. 2 & 5: A9.2 1:A9.8 2& 3:A9.11 The swing clear cabinet doors at base cabinet locations have been removed and replaced with a removable apron. The removable apron will provide the required knee and toe floor space at the front of each sink and provide knee protection. 2019.06.14Pitkin Permit – Architectural: A9.2 Interior Elevations A parallel approach to the sink is required when knee/toe clearances are not provided. ICC A117.1-2009 606.2 exception 1. The dishwasher in the open position cannot encroach in the clear floor space of the sink 804.5.3. Response: See comment above. All swing clear cabinet doors have been removed and replaced with a removeable sink apron. The removable apron will provide the required knee and toe floor space at the front of each sink and provide knee protection. 2019.06.14 Pitkin Permit – Architectural A9.7 Interior Elevations – DA A parallel approach to the sink is required when knee/toe clearances are not provided. OCC A117.1-2009 606.2 exception 1 Response: Sink in DA office 101 has been updated to provide a front approach to the sink. The swing away cabinet doors have been replaced with a removable apron. The removable apron will provide the required knee and toe floor space at the front of each sink and provide knee protection. See revised interior elevation 2:A9.7. 08/21/2019 CR A F T B A L A N C E WH I M S Y 30 3 2 7 8 4 3 7 8 7 1 5 F O U R T E E N T H S T R E E T , G O L D E N , C O 8 0 4 01 AN D A R C H . C O M AN D E R S O N H A L L A S A R C H I T E C T S 6 2019.06.14 Pitkin Permit – Architectural: G0.1 Cover Sheet Per information provided on the asbestos verification checklist, this project requires an asbestos test. Provide an asbestos test report that includes the following: Inspector’s narrative including sampling locations 2. Inspector’s certificate 3. Lab data. If asbestos is found, a final air clearance report must be provided to building permit issuance. Response: Asbestos report is attached. 2019.06.14 Pitkin Permit – Architectural G0.1 Cover Sheet The special inspection agreement needs to be completed and signed by all parties prior to permit issuance. Response: See Attached 2019.06.14 Pitkin Permit – Architectural G0.3 General Information Provide the full installation instruction from the Gypsum Manual for WP 1072, WP 3510, WP6800, FCU3510 in the plan set for reference and inspection. Response: Sheet G0.3 wall types have been updated with full installation instructions from the Gypsum Manual. Revised sheets G0.3G0.4A1.0A1.1A5.0A7.3A9.2A9.7A9.8A9.11A0.1E1.0ED1.0 08/21/2019 506 E Main_BuildingComments_1_Markup Summary File Name: 2019.05.29 Mechanical.pdf Author: bonniem Subject: PlanCheck Color: Page Label: M0.1 MECHANICAL LEGEND AND NOTES Thermostat heights to comply with reach ranges in ICC A117.1-2009 308. 2019.05.29 Mechanical.pdf (1) File Name: 2019.05.29 Pitkin Permit Electrical.pdf Author: mitchm Subject: Electrical Code Color: Page Label: ED1.0 GARDEN LEVEL ELECTRICAL PLAN DEMO 620.22 Branch Circuits for Car Lighting, Receptacle(s), Ventilation, Heating, and Air-Conditioning. (A) Car Light Source. A separate branch circuit shall supply the car lights, receptacle(s), auxiliary lighting power source, and ventilation on each elevator car. The overcurrent device protecting the branch circuit shall be located in the elevator machine room or control room/machinery space or control space. Required lighting shall not be connected to the load side of a ground-fault circuit interrupter 2019.05.29 Pitkin Permit Electrical.pdf (1) File Name: 2019.06.14 Pitkin Permit - Architectural.pdf Author: bonniem Subject: PlanCheck Color: Page Label: A1.0 GARDEN LEVEL FLOOR PLAN Per the code summary on G0.4, the occupant load of the garden level courtroom exceeds 50, correct door swing so that doors swing in the direction of egress travel per 2015 IEBC 805.4.2 2019.06.14 Pitkin Permit - Architectural.pdf (13) File Name: 2019.06.14 Pitkin Permit - Architectural.pdf Author: bonniem Subject: PlanCheck Color: Page Label: A1.0 GARDEN LEVEL FLOOR PLAN Per 2015 IEBC 705, 705.2, this alteration affects the area of primary function and therefore the toilet facilities serving the area of primary function shall be accessible to the maximum extent that is technically feasible. Revise door widths to provide clear opening width of 32 inches minimum. Provide an accessible toilet compartment, grab bars and under counter pipe protection in the men's restroom. PRESSURE SENSOR THERMOSTAT METER FLOW ARROWG. FIRE/SMOKE DAMPERS: COMBINATION FIRE/SMOKE DAMPERS SHALL BE FABRICATED IN ACCORDANCE WITH NFPA 90A ANDUL555S CLASS II. FIRE/SMOKE DAMPERS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S UL INSTALLATIONINSTRUCTIONS. ACTUATORS SHALL BE POWER OPEN/SPRING CLOSED OPERATION, 120 VOLT. THE FIRE FAIL/SAFE MODE SHALLBE A UL 33 HEAT ACTUATED LINK FOR CLOSURE AND CONTAINMENT OF FIRE ZONE, INDEPENDENT OF ACTUATOR POSITIONINGOR SIGNALING. MANUFACTURED BY PREFCO, MODEL 5020 OR EQUAL. H. HOT WATER HEATING PIPING/CHILLED WATER PIPING/CONDENSER WATER PIPING: ABOVEGROUND, NPS 2" AND SMALLER, SHALLBE ANY OF THE FOLLOWING:1. TYPE L, DRAWN-TEMPER, COPPER TUBING, WROUGHT-COPPER FITTINGS, AND SOLDERED JOINTS.2. SCHEDULE 40, GRADE B, TYPE 96 STEEL PIPE; CLASS 150, MALLEABLE IRON FITTINGS, CAST-IRON FLANGES AND FLANGEFITTINGS, AND THREADED JOINTS. K. HYDRONIC PIPING INSULATION: MINERAL-FIBER, PREFORMED PIPE INSULATION: TYPE 1, 850° F. MINERAL OR GLASS FIBERSBONDED WITH A THERMOSETTING RESIN. COMPLY WITH ASTMC 547, TYPE 1, GRADE A, WITH FACTORY APPLIED ASJ.1. HEATING WATER 1-1/2" AND SMALLER = 1.5" THICK, HEATING WATER 2" AND LARGER = 2" THICK, CONDUCTIVITY = 0.27 @125° F.2. CHILLED WATER = 1.0 " THICK, CONDUCTIVITY = 0.25 @ 75° F. III. EXECUTION A. BALANCING:1. CONTRACTOR SHALL ADJUST AND BALANCE VARIABLE VOLUME BOXES (VAV'S), FAN POWERED BOXES (FPB'S), AIRCONDITIONING UNITS (AC'S), AND DIFFUSERS TO THE QUANTITIES SHOWN ON THE DRAWING. BALANCING WORK SHALL BEPERFORMED IN ACCORDANCE WITH NEBB OR TABB STANDARDS BY A NEBB OR TABB CERTIFIED CONTRACTOR. SUBMITBALANCING REPORT TO THE ENGINEER.2. EXISTING DIFFUSER DESIGNATION INDICATES CFM ONLY.3. VAV BOX DESIGNATION INDICATES MAXIMUM CFM ADJUST MINIMUM TO 10% OF MAXIMUM.4. WHERE LOW PRESSURE AIR HANDLING SYSTEMS CROSS INTO AN ADJACENT TENANT AREA, CONTRACTOR SHALLBALANCE ALL DIFFUSERS ASSOCIATED WITH THE SYSTEM. DIFFUSERS NOT SHOWN OR SHOWN WITH NO CFM SHALLMAINTAIN EXISTING CFM.5. ADJUST WATER SYSTEMS, AFTER AIR BALANCING, TO PROVIDE DESIGN QUANTITIES.6. ADJUST SYSTEMS TO PROVIDE SPECIFIED PRESSURE DROPS AND FLOWS THROUGH HEAT TRANSFER ELEMENTS PRIORTO THERMAL TESTING. PERFORM BALANCING BY MEASUREMENT OF TEMPERATURE DIFFERENTIAL IN CONJUNCTION WITHAIR BALANCING. B. CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES AND NOTIFY 360 ENGINEERING, INC. IF ANY CONFLICTS OCCUR. C. THERMOSTAT LOCATIONS AND HEIGHTS TO BE COORDINATED WITH BUILDING MANAGEMENT, VERIFIED BY THE ENGINEER.CONTRACTOR TO CALIBRATE ALL THERMOSTATS SHOWN ON THIS PLAN. IT SHALL BE THE GENERAL CONTRACTOR'SRESPONSIBILITY TO ENSURE THAT ALL EXISTING THERMOSTATS REMAIN INTACT DURING DEMOLITION. HEATING THERMOSTATSMUST REMAIN OPERATIONAL AT ALL TIMES. IF REQUIRED FOR BETTER PROTECTION, THERMOSTATS MAY BE TEMPORARILYMOUNTED IN THE CEILING PLENUM DURING DEMOLITION. D. PROVIDE VOLUME DAMPERS AT ALL DIFFUSER TAKEOFFS. E. ALL TAKEOFFS, RUNOUTS, AND FLEX DUCTWORK TO DIFFUSERS SHALL BE THE SAME SIZE AS DIFFUSER INLET UNLESSOTHERWISE NOTED. F. MECHANICAL CONTRACTOR TO CHECK OPERATION AND CONDITION OF ALL EXISTING MECHANICAL EQUIPMENT WITHIN THECONFINES OF THIS SPACE AND PREPARE A WRITTEN LIST OF ANY DEFICIENCIES IN EQUIPMENT OPERATION OR CONDITION. LIST SHALL BE SUBMITTED TO OWNER TWO WEEKS AFTER THE AWARD OF THE CONTRACT. G. THERMOSTAT CONTROL LINES SHALL BE SUPPORTED AT INTERVALS NOT TO EXCEED 4'0". H. PROVIDE EXTERNAL INSULATION ON ALL NEW RIGID ROUND DUCTWORK. I. PROVIDE ACCESS DOORS IN DUCTWORK AS REQUIRED FOR ACCESS TO FIRE DAMPERS, FIRE/SMOKE DAMPERS, OR ANY OTHERMECHANICAL EQUIPMENT REQUIRING MAINTENANCE OF SERVICE.J. ALL PIPE AND DUCT PENETRATIONS THROUGH RATED WALLS SHALL BE SEALED PER 2015 IBC. MT P Thermostat heights tocomply with reachranges in ICCA117.1-2009 308. (R) (R) (R) (R) (R) (R)(R) (E) (E) (E) PITKIN COUNTY COURTHOUSE REMODEL PITKIN COUNTY, CO 506 E Main St St 300, Aspen, CO 81611 No. Description Date1 Addendum #2 05-23-2019 INTERCEPTING CONDUITS IN THE VISITING JUDGE'S CHAMBERS ANDRE-ROUTING AROUND THE LOWER LIFT LOBBY BACK INTO COURTROOM 3. 3 EXISTING ELEVATOR EQUIPMENT TO BE REPLACED WITH NEW IN SAMELOCATION. NEW ELEVATOR ELECTRICAL CHARACTERISTICS (3OHP) ARESAME AS EXISTING (30HP). CONTRACTOR SHALL MAINTAIN EXISTING FIREALARM CONNECTIONS AND EXISTING POWER CIRCUITRY IF VERIFIED TOMATCH NEW. REFER TO ELEVATOR EQUIPMENT INFORMATION INMECHANICAL SCHEDULE FOR MORE INFORMATION.4 EXISTING CAB LIGHT DISCONNECT IS A TOGGLE SWITCH AND SHALL BEREPLACED WITH FUSED DISCONNECT. REMOVE EXISTING TOGGLE SWITCHAND MAINTAIN EXISTING CIRCUITRY FOR CONNECTION TO NEWDISCONNECT SWITCH IN NEW WORK.5 CONTRACTOR SHALL MAINTAIN EXISTING FUSED DISCONNECT IF VERIFIEDTO BE A 150A FUSE IN 200A3P DISCONNECT. OTHERWISE REPLACE WITHNEW IN SAME LOCATION. VERIFY FEED TO DISCONNECT MATCHES NEWFEEDER PER EQUIPMENT INDICATED IN MECHANICAL EQUIPMENTSCHEDULE. 1 620.22 Branch Circuits for Car Lighting, Receptacle(s),Ventilation, Heating, and Air-Conditioning.(A) Car Light Source. A separate branch circuit shall supplythe car lights, receptacle(s), auxiliary lighting power source, andventilation on each elevator car. The overcurrent device protectingthe branch circuit shall be located in the elevator machineroom or control room/machinery space or control space.Required lighting shall not be connected to the load side ofa ground-fault circuit interrupter 176 SF BOILER01A 72 SF MECH/ELEC02D 35 SF JAN.00A 98 SF STORAGE00B 332 SF HOLDING06 143 SF CONF. RM08 87 SF JUDGE RR14 715 SF COURTROOM 305 53 SF HALL16 13B 05A 17 06 NF6 NF6 NF6NF6NF6 NF3 NF8UP UP 5' - 0" UP NEW ACCESSIBLE CONC RAMP. MAX SLOPE 1:12. RE: CIVIL 102 SF WOMEN00C 113 SF MEN00D INFILL <E> OPENING, RE:STRUCT. M.O.4' - 1"5' - 0" 6' - 2 1/2" A9.91 A9.82 A4.02 47 SF STORAGE15 70 SF SECURE HALL13 49 SF ELEV. MECH.00E A7.31 . 615 SF HALL00 110 SF HALL09 59 SF HALL10 408 SF VISITING JUDGE'SCHAMBERS04 49 SF HALL05A <N> RAISED PLATFORM FOR JUDGE'S BENCH 06A 06B 85 SF ATTORNEY06A 20 SF MECH.06B 4' - 6" NF6 NF9NF9 NF9 NF9 3 49 SF JURY RR07 07 116 SF OFFICE 102C SF ST.2 55 SF ELEV.11 UP B B A A C F A C A7.51 A9.121 F C ALIGN O.2"" 13A 08 A4.01 10' - 6 " 1/2" 4' - 5 1/2" 3' - 11 1/2" 12' - 5" 6' - 1 1 1 / 2 " 5' - 8" 9 1/2 " 5" R.O.3' - 2" 5" D 100' - 0" 100' - 0" 76 SF LOWER LIFT LOBBY17 A I NF10 NF10 04 12 M.O.3' - 4" 3' - 5" R.O.3' - 2" 1' - 5" R.O.3' - 2" 1' - 5" 1' - 6" 10' - 0" R.O.3' - 2" 8 1/2" R.O.3' - 2" R.O.3' - 2" R.O. 1' - 0"1' - 0" ALIGN F.O. <N> WALL WITH CENTER LINE OF <E> COLUMN. NF15 00B 00A 00E 05 04A00D00C 02D 01A HOLD3' - 6" 16 F D VERTICAL INTERIOR ROOF DRAIN TO REMAIN D NF20 NF20 06B 05A 05B 05C 05D 05E 06CNF6 3' - 6" 9 1/4" 7" UP RTICAL GRAB BLE STALL & PIPE M.O.3' - 4" A0.25 NF26 NF27NF28NF29 05B 05C 15 14 B NF9 NF9NF9 NF9 NF9 NF9 NF9NF9 C NF9 NF9 A AA A G GNF15 NF37 REF STRUCTURAL FOR MATERIAL AND SIZING FOR STRUCTURAL ELEMENTS IN WALL TYPA AT NEW LIFT STRUCTURE SIM SIM E 1 LEGEND <E> WALL NEW WALL NEW DOOR NEW FLOOR STRUCTURE, RE: STRUC REPAIR CONCRETE SLAB. PROVIDE CONSISTENT FLOOR LEVEL PRIOR TO INSTALLING NEW FLOOR FINISH. FLOOR ELEVATION KEYNOTE DOOR TAG WALL TYPE # - 101 X GENERAL NOTES1. PATCH AND REPAIR ALL FINISHES AFFECTED BY CONSTRUCTION. MATCH ADJACENT FINISH.2. COORDINATE REUSE, SALVAGE, OR DISPOSAL OF ALL DEMO ITEMS WITH OWNER.3. REMOVE & SALVAGE <E> WINDOW TREATMENTS. COORDINATE REINSTALLATION WITH PITKIN COUNTY/ 9TH JUDICIAL DISTRICT.4. FURNITURE BY OTHERS. SHOWN FOR REFERENCE.5. PITKIN COUNTY TO BE RESPONSIBLE FOR REMOVING / RELOCATING ALL <E> FURNITURE.6. REFERT TO M, P, E, & S SHEETS FOR ADDITIONAL INFORMATION.7. REFER TO FINISH PLANS AND RCPS FOR ADDITIONAL INFORMATION.8. ALL REPOSITIONED COURTROOM FURNITURE TO PROVIDE 30" CLEAR.9. REMOVE AND SALVAGE <E> SIGNAGE (FLAGS AND WALL MOUNTED). MODIFY FOR <N> ROOM NAMES. INSTALL <N> TO MATCH <E> WHERE NEEDED.10. REFER TO A 9.7 FOR ADDITIONAL CLERESTORY. PROVIDE SMOOTH AND FLUSH FINISH MATCH <E> ADJACENT FURRING ANDFINISH.NF20 INSTALL <N> HIGH IMPACT RESISTANTGYP. BD. WALL FINISH ON <E> FURRIN INSTALL <N> FURRING (TO MATCH <E> AS NEEDED FOR <N> OPENING ATEXISTING ELEVATOR CORE.NF26 THE CAB HAS THREE SETS OFCONTROLS. (2) AT STANDARD HEIGHT REAR AND FRONT OF CAB AND A THIR SET OF CONTROLS MOUNTED AT 29" A REMOVE THIRD SET OF CONTROLS.UPDATETHE CONTROL OPTIONS TOINCORPORATE <N> CALL BUTTON TO < SIDE OF GARDEN LEVEL, ANDSECURE/DESIGNATED ACCESS FORIN-CUSTODIES AND STAFF.NF27 REMOVE <E> VINYL TILE FLOOR.PROVIDE <N> CARPET TILE FLOORFINISH. PROVIDE <N> INTERIOR CABFINISH ON ALL 4 WALLS. PROVIDE <N>CEILING FINISH AND LIGHTING. REMOV <E> AUXILIARY PANEL.NF28 PROVIDE CAB CONTROLS VIA CARDACCESS TO ALLOW FOR LOCKOUT FO EITHER JUDGE OR IN-CUSTODYTRANSPORT.NF29 PROVIDE VERTICAL ACCESSIBLE GRA BAR IN <E> RESTOOM. RE: A 9.3NF37 PROVIDE <N> PLUMBING CHASE FOR < ROOF DRAIN WITH 6" MIN INTERIORCLEAR. SIZE OF PIPE TO BE CONFIRME VIA DESIGN BUILD. 1 Per the code summaryon G0.4, the occupantload of the gardenlevel courtroomexceeds 50, correctdoor swing so thatdoors swing in thedirection of egresstravel per 2015 IEBC805.4.2 176 SF BOILER01A 72 SF MECH/ELEC02D 35 SF JAN.00A 98 SFSTORAGE00B 332 SF HOLDING06 143 SF CONF. RM08 87 SF JUDGE RR14 715 SF COURTROOM 305 53 SF HALL16 372 SF JURY DELIBERATION03 13B 01 05A 17 06 NF6 NF6 NF6NF6NF6 NF3 UPUP UP UP 102 SF WOMEN00C 113 SF MEN00D INFILL <E> OPENING, RE:STRUCT. M.O.4' - 1"5' - 0" 6' - 2 1/2" 5" A9.82 47 SF STORAGE15 70 SF SECURE HALL13 49 SFELEV. MECH.00E 55 SF VEST.03A 122 SF ATTORNEY01 615 SF HALL00 110 SF HALL09 59 SF HALL10 408 SF VISITING JUDGE'SCHAMBERS04 49 SF HALL05A 06A 06B 85 SFATTORNEY06A 4' - 6 " NF6 NF9NF9 NF9 NF9 03 JURY RR07 07 89 SF ALPINE LEGAL02E 116 SF OFFICE 102C103 SF OFFICE 202B 197 SF BREAK ROOM02A 85 SF VEST.02 02C02B 02A 02E DW 55 SF ELEV.11 UP UP A A B B A A A A A A C F A C <N> CABINET A7.51 F C ALIGN 9' - 2" R.O.3' - 2"5 1/2" 13A 08 A4.0113' - 4 1/2" 2' - 10" 8' - 2" 10' - 6 " 8' - 1 1/2" R.O.3' - 2"4' - 5 1/2" 3' - 11 1/2" 6' - 1 1 " 12' - 5" 6' - 11 1 / 2 " 5' - 8" 9 1/2 " 5" R.O.3' - 2" 5" 13' - 3" 7" D ALIGN 100' - 0" 100' - 0" A9.21 A I NF10 NF10 04 12 00 09 M.O.3' - 4" 3' - 5" R.O.3' - 2" 1' - 5" R.O.3' - 2" 1' - 5" R.O.3' - 2" 8 1/2" R.O.3' - 2" R.O.3' - 2" HOLD1' - 0"R.O.3' - 2"R.O.'3' - 2" R.O.3' - 2"1' - 4" R.O.3' - 2" R.O.3' - 2" 1' - 0"1' - 0" ALIGN F.O. <N> WALL WITH CENTER LINE OF <E> COLUMN. NF15 1' - 6" FIN.4' - 6" 00B 00A 00E 05 04A00D00C 02D 01A HOLD3' - 6" 16 F 18 REF. D D NF20 NF20 0 05A 05B 05C 0 0 0 06A06D06E NF6 NF6NF6NF6 3' - 6" 9 1/4" 7" UP A9.26 INSTALL <N> SCREEN OVER CONDUIT INSTALL <N> SCREEN OVER CONDUIT PROVIDE <N> VERTICAL GRAB BAR AT ACCESSIBLE STALL & UNDERCOUNTER PIPE PROTECTION M.O.3' - 4" NF26 NF27NF28NF29 05B 05C 15 14 B NF9 NF9NF9 NF9 NF9 NF9 NF9NF9 C A AA A G GNF15 INSTALL <N> 2" THICK CONC "BENCH" OVER FOUNDATION INSTALL <N> 4X4 STL ANGLE TO SUPPORT CONC BENCH ENDEGRESS STAIR FOUNDATION, RE: STRUC NF37 CONTRACTOR SHALL CONNECTNEW INTERNAL ROOF DRAIN TO NEW STORM SEWER: REF CIVIL REF STRUCTURAL FOR MATERIAL AND SIM SIM D E 1 1 PROVIDE MINIMAL WALL PENETRATION INVERT OF 7903.83' TO ACHIEVE A MINIMUM 1% SLOPE TO STORM SEWER TIE-IN 1 Per 2015 IEBC 705, 705.2, thisalteration affects the area of primaryfunction and therefore the toilet facilitiesserving the area of primary functionshall be accessible to the maximumextent that is technically feasible.Revise door widths to provide clearopening width of 32 inches minimum.Provide an accessible toiletcompartment, grab bars and undercounter pipe protection in the men'srestroom. 08/21/2019 File Name: 2019.06.14 Pitkin Permit - Architectural.pdf Author: bonniem Subject: PlanCheck Color: Page Label: A1.1 MAIN LEVEL FLOOR PLAN Per 2015 IEBC 705, 705.2, this alteration affects the area of primary function and therefore the toilet facilities serving the area of primary function shall be accessible to the maximum extent that is technically feasible. Revise door widths to provide clear opening width of 32 inches minimum. Provide an accessible toilet compartment, grab bars and under counter pipe protection in the men's restroom. File Name: 2019.06.14 Pitkin Permit - Architectural.pdf Author: bonniem Subject: PlanCheck Color: Page Label: A5.0 DOOR SCHEDULE 1. Confirm that the following 2'10" doors will provide the minimum clear width of 32" per 2015 IBC 1010.1.1: 00, 04, 100, 105C, 108A, 113, 114, 202C, 203. File Name: 2019.06.14 Pitkin Permit - Architectural.pdf Author: bonniem Subject: PlanCheck Color: Page Label: A5.0 DOOR SCHEDULE Correct the following doors to provide the required 32" clear width per 2015 IBC 1010.1.1: 108B, 108C File Name: 2019.06.14 Pitkin Permit - Architectural.pdf Author: bonniem Subject: 3/16" Scale Color: Page Label: A7.3 ENLARGED PLANS AT NEW LIFT ENTRY 3'-5" File Name: 2019.06.14 Pitkin Permit - Architectural.pdf Author: bonniem Subject: PlanCheck Color: Page Label: A7.3 ENLARGED PLANS AT NEW LIFT ENTRY Side door on the lift requires a clear opening width of 42" minimum. ICC A117.1-2009 410.2.1 IT106 FILE/COPY102D STORAGE112 PROBATION108 PROBATION RR108D OFFICE 1108E OFFICE 2108C OFFICE 3108B WAITING108A CLOSET108F HALL105 OFFICE 2105B MEETINGROOM105C CLERKS102 WAITING/SELF HELP102A CLERKWORKSTATIONS103 FAMILY COURT/COLLECTIONS102B OFFICE 1104 108E 104 NF3 DN DN <N> CONC. RAMP, MAX. SLOPE 1:12. RE: CIVIL MEN113 WOMEN114 11' - 9" 10' - 11 " ALIGN 10' - 0 1/2"6' - 7 " R.O.3' - 2"7" 1' - 4" UP UP DN DN A9.92 HALL100 4' - 3 1/2" 102B TRANSACTION COUNTER : REF 5:A9.3 SECURITYSCREENING115 VEST.100A EST.10 HALL103AELEV.111 INFORMAL MTG105A B A F A AA A <N> ACCESSIBLE RAILINGS<N> ACCESSIBLE RAILINGS ALIGN 101C101B OFFICE 1101B OFFICE 2101C WITNESSWAITING101D DA OFFICE101 OFFICE 4101E 101EAAA101D OFFICE 3101F 101F A WAITING101A OPEN TO BELOW A9.6 2 A9.6 3 A9.4 4 A9.4 5 A9.34 A9.3 5 V.I.F.15' - 7" 10 1/2" V.I.F. 4' - 10 1/2" 1"HOLD5' - 0"1" V.I.F.0" 1' - 0" V.I.F.11' - 4" 9' - 6" 9' - 11 1/2" 6' - 8" 4 1/2"ALIGN A A A9.41108 ALIGN 2A9.3 A ALIGN R.O.3' - 2" 4' - 0 1/2" ALIGN R.O.3' - 2" R.O.3' - 2" 6 1/2"R.O.3' - 2" R.O.3' - 2" R.O.3' - 2" R.O.3' - 2" F.4"R.O.3' - 2"1' - 0"HOLD1' - 6" ALIGN 7' - 1" A 110 100A 100B 6"6" NF14 E A9.61 152 C 102D 115102102A 106 105B 105C 108C 108B 100C 101A 113 100 112 114 108F 108A NF19A4.04 X RAY 73" x 47" MAGNETOMETERS 36" x 28"DEMOUNTABLE GLASS PARTITION 6' HT 1' - 6"R.O.3' - 2"102C A9.71 1' - 10" 4' - 4"1' - 8" 4' - 4"1' - 6" 2' - 7"2' - 2" H H H PROVIDE <N> VERTICAL GRAB BAR AT ACCESSIBLE STALL & UNDERCOUNTER PIPE PROTECTION WALL-MOUNTED SWING SECURITY EXIT GATE A4.03 A4.06 108D 103A 6 NF25 NF23 1' - 4 1/2"1' - 0 1/2" E SECUR I T Y STAF F MIN3' - 0" MIN3' - 6" A4.07 A4.08 A9.31 3A9.3 A9.7 5 MIN.1' - 0" 4 7' - 0" H 1' FLOOR A NF30 NF30 TAIN 48 INCHES CLEAR MANUEVERING SPACE AT H SIDES OF OPENING.ENTIRE DEPTH OF MASONRY WALL.3.VERIFY 32 INCHES CLEAR OPENING4.MAINTAIN 48 INCHES CLEAR MANUEVERING SPACE AT BOTH SIDES OF OPENING. 1' - 11" 2' - 10" HOLD 3' - 10 1/2" ALIGN V.I.F.' - 4" V.I.F.1" A E AA NF31 NF32 NF32 NF32 NF32 NF33 NF34 A A A AA9.7 76 3' - 5" 101 REF. 1 NF37 LEGEND <E> WALL NEW WALL NEW DOOR NEW FLOOR STRUCTUR STRUC REPAIR CONCRETE SLA PROVIDE CONSISTENT F LEVEL PRIOR TO INSTAL NEW FLOOR FINISH. FLOOR ELEVATION KEYNOTE DOOR TAG WALL TYPE # - 101 X GENERAL NOTES1. PATCH AND REPAIR ALL FINISHES AFFEC CONSTRUCTION. MATCH ADJACENT FINI 2. COORDINATE REUSE, SALVAGE, OR DISP DEMO ITEMS WITH OWNER.3. REMOVE & SALVAGE <E> WINDOW TREA COORDINATE REINSTALLATION WITH PIT JUDICIAL DISTRICT.4. FURNITURE BY OTHERS. SHOWN FOR RE 5. PITKIN COUNTY TO BE RESPONSIBLE FO RELOCATING ALL <E> FURNITURE.6. REFERT TO M, P, E, & S SHEETS FOR ADD INFORMATION.7. REFER TO FINISH PLANS AND RCPS FOR INFORMATION.8. ALL REPOSITIONED COURTROOM FURNI 30" CLEAR.9. REMOVE AND SALVAGE <E> SIGNAGE (F MOUNTED). MODIFY FOR <N> ROOM NAM TO MATCH <E> WHERE NEEDED.10. REFER TO A 9.7 FOR ADDITIONAL CLERE N MIRRORED FILM APP GLASS. REMOVE DOO INFILL HOLE WHERE HARDWARE REMOVE FLUSH FINISH WITHSURROUNDING WD, P MATCH.NF23 FIX DOOR IN OPEN PO NF25 CUT THROUGH <E> S FOUNDATION WALL. P <N> DOOR ACCESS T NORTH OF THE <E> E NF30 PROTECT <E> SAFE D REMAIN IN PLACE.NF31 ALIGN <N> WALL WIT COLUMNS.NF32 <N> CLERESTORY WI ABOVE. RE: INT. ELEV NF33 <E> COLUMN TO REM NF34 REINSTALL SALVAGE MILLWORK ON <N> W PROVIDE <N> WD AC PANEL.NF37 PROVIDE <N> PLUMB FOR <N> ROOF DRAIN MIN INTERIOR CLEAR PIPE TO BE CONFIRM DESIGN BUILD. DRAWINGS BASED ON FLO PROVIDED BY PITKIN COUN 0 4' 8 1 Per 2015 IEBC 705, 705.2, thisalteration affects the area of primaryfunction and therefore the toilet facilitiesserving the area of primary functionshall be accessible to the maximumextent that is technically feasible.Revise door widths to provide clearopening width of 32 inches minimum.Provide an accessible toiletcompartment, grab bars and undercounter pipe protection in the men'srestroom. S 1. Confirm that the following 2'10" doors will provide the minimum clear width of 32" per 2015 IBC 1010.1.1: 00, 04, 100, 105C, 108A, 113, 114, 202C, 203. HIS Correct the following doors to provide the required 32" clear width per 2015 IBC 1010.1.1: 108B, 108C LIFT 3' - 5 " <N> POST MOUNTE AUTOMATIC ACCES DOOR OPENER BUT LOCATION (EXTERIO NEW WALL MOUNTE AUTOMATIC ACCES DOOR OPENER BUT LOCATION (INTERIO PRE-FINISHED GATE ASSEMBLY BY LIFT INSTALLED BY G.C. PRE-FINISHED LIFT ASSEMBLY - INSTAL BY G.C. T-SHAPED TURNING CLEARANCE <E> WINDOW TO DOOR PROVIDED B MFG INSTALLED BY CLOSET108F 3A7.3 LIFT5 A7.3 TO BE REMOVED AND SALVAGED EXISTING DOOR LOCATION (V.I.F.) 1' - 7"NEW CLR OPENING 4' - 9" ,<E> STAIR AND <E> ENTRY VESTIBULE OPEN TO BELOW (V.I.F.) 4' - 8" (V.I.F.) 5' - 5 1/2" (V.I.F.) 1' - 10" ADA CLEAR FLOOR SPACE <E> WINDOW AND FRAME TO REMAIN FIN. TO STUD4' - 0" (V.I.F.) <N> STRUCTURAL FLOOR AT LIFT PLATFORM LOCATION <N> ENCLOSURE AT LIFT WALL PRE-FINISHED LIFT INSTALLED BY G.C. <E> MECHANICAL DUCT TO REMAIN NOTE: NEW WALL FRAMING AT LIFT LOCATION SHALL BE (1) HOUR RATED (SHOWN WITH DIAGONAL CROSS HATCH) STEEL FRAMING: GA FILE NO WP1072WOOD FRAMING: GA FILE NO WP 2510 MAIN LEVEL110' - 3 5/8" LOOR STRUCTURE AND LIFT SO ATFORM OF LIFT ALIGNS WITH BEYOND LL CONSTRUCTION WITH RESISTANT GYP. BOARD ON PUBLIC SIDE OF LIFT URE <N> CARPET FINISH ON <N> ITH 3/4" T&G PLYWD -ALIGN <N> WITH <E> MAIN FLOOR LL ENCLOSURE F <N> OPENING BEYOND SONRY WALL TO REMAIN, RE: OR TO REMAIN D BASE - PT TO MATCH <E> 2 Side door on the liftrequires a clearopening width of 42"minimum. ICCA117.1-2009 410.2.1 08/21/2019 File Name: 2019.06.14 Pitkin Permit - Architectural.pdf Author: bonniem Subject: PlanCheck Color: Page Label: A9.2 INTERIOR ELEVATIONS Knee and toe clearances must be provided at the jury deliberation sinks. ICC A117.1-2009 606.2 File Name: 2019.06.14 Pitkin Permit - Architectural.pdf Author: bonniem Subject: PlanCheck Color: Page Label: A9.2 INTERIOR ELEVATIONS A parallel approach to the sink is required when knee/toe clearances are not provided. ICC A117.1-2009 606.2 exception 1. The dishwasher in the open position cannot encroach into the clear floor space of the sink 804.5.3. File Name: 2019.06.14 Pitkin Permit - Architectural.pdf Author: bonniem Subject: PlanCheck Color: Page Label: A9.7 INTERIOR ELEVATIONS - DA A parallel approach to the sink is required when knee/toe clearances are not provided. ICC A117.1-2009 606.2 exception 1. File Name: 2019.06.14 Pitkin Permit - Architectural.pdf Author: bonniem Subject: PlanCheck Color: Page Label: G0.1 COVER SHEET Per information provided on the asbesos verification checklist this project requires an asbestos test. Provide an asbestos test report that includes the following: 1.Inspector’s narrative including sampling locations 2. Inspector’s certificate 3. Lab data If asbestos is found, a final air clearance report must be provided prior to building permit issuance. File Name: 2019.06.14 Pitkin Permit - Architectural.pdf Author: bonniem Subject: PlanCheck Color: Page Label: G0.1 COVER SHEET The special inspection agreement needs to be completed and signed by all parties prior to permit issuance. A9.22 1' - 11 1 / 2 " 2' - 6" 3" 2' - 1" 2A9.11Sim FINISHED FACE PANEL <E> COLUMN TO REMAIN, LOCATION V.I.F. 30" X 4 8 " CLEA R S P A C E (E) SIGNAGE, MODIFY TO ACCOMODATE (N) ROOM NAME, COMPLY W/ ADA PROVIDE <N> OR RELOCATED FLAG SIGNAGE AT THE FOLLOWING ROOMS:• 05• 102A• 105C• 108A• 101A• 201• 203 PROVIDE <N> OR RELOCATED WALL SIGNAGE TO MATCH EXISTING AT ALL ROOMS. SOLID SURFACE COUNTERTOP WITH INTEGRAL 4" BACKSPLASH 2A9.11SimSB30 FINISHED FACE PANEL; BEHIND COLUMN <E> COLUMN TO REMAIN, LOCATION V.I.F. FILLERFILLER BC30 BC30 DW24 SB36 3'-0" MIN. CLR 2' - 1"DW REF. 3A9.11Sim1A9.11Sim 2' - 10" 2' - 3" BC36BC36SB36DW24REF. ADJACENT STONE 3A9.11Sim 1A9.11Sim FILLER; SCRIBE TO ADJACENT STONE CABINET LEGEND BC =BASE CABINETSB=SINK BASE CABINETDW=DISHWASHERTC=TALL CABINETWC=WALL CABINETREF=REFRIGERATOR BC15 BC30 2' - 10" SOLID SURFACE COUNTERTOP WITH INTEGRAL 4" BACKSPLASH 2A9.11Sim FINISHED END PANELS A9.251' - 3" 2' - 6" 1"2' - 0 1/2" 2A9.11Sim FINISHED END PANEL 30" X 48 " CLEAR S P A C E FINISHED END PANEL Project Number DateDrawn byChecked by COPYRIGHT 2019ANY UNAUTHORIZED USE OF THESE DOCUMENT IS PROHIBITED WITHOUT THE WRITTEN CONSEN OF:ANDERSON HALLAS ARCHITECTS, P.C. PLANNING Issue 715 FOURTEENTH STREETGOLDEN, COLORADO 80401(303) 278-4378FAX (303) 278-0521 Scale AS NOT A9.2 INTERIORELEVATIONS 20179 PITKIN COUNTY COURTHOUSE REMODEL PITKIN COUNTY, CO 5/2/ LW RAS/NA 506 E Main St St 300, Aspen, CO 81611 PER 1/2" = 1'-0"1JURY DELIB. 03 ENLARGED PLAN DRAWINGS BASED ON FLOOR PLANS PROVIDED BY PITKIN COUNTY. CONTRACTOR TO NOTIFY ARCHITECT OF ANY DEVIATIONS FROM ACTUAL FIELD CONDITIONS, PRIOR TO COMMENCING WITH WORK. 0 2' 4' 1 1/2" = 1'-0"EXISTING SIGNAGE 1/2" = 1'-0"2JURY DELIB. 03 INTERIOR ELEVATION EAST 1/2" = 1'-0"6BREAK RM 02A ENLARGED PLAN 1/2" = 1'-0"7BREAK RM 02A INTERIOR ELEVATION SOUTH 1/2" = 1'-0"5JURY DELIB. 204 INTERIOR ELEVATION WEST 1/2" = 1'-0"4JURY DELIB. 204 ENLARGED PLAN 1 No. Description Dat 1 ADDENDUM 01 4/26/20 Knee and toeclearances must beprovided at the jurydeliberation sinks. ICC A117.1-2009606.2 A9.2 7 BC30 BC30 DW24 SB36 3'-0" MIN. CLR 2' - 1"DW REF. 3A9.11 Sim1A9.11 Sim 30" X 48" CLEAR SPACE 2' - 1 0 " WC24 WC30 WC30C36 BC36BC3636DW24 SOLID SURFACE COUNTERTOP WITH INTEGRAL 4" BACKSPLASH; SCRIBE TO ADJACENT STONE 3A9.11Sim 1A9.11 Sim FILLER; SCRIBE TO ADJACENT STONE FILLER; SCRIBE TO ADJACENT STONE BC15 BC30 2' - 1 0 " SOLID SURFACE COUNTERTOP WITH INTEGRAL 4" BACKSPLASH 2A9.11Sim FINISHED END PANELS A9.251' - 3 " 2' - 6 " 1"2' - 0 1/2" 2A9.11Sim FINISHED END PANEL 30" X 4 8 " CLEA R S P A C E FINISHED END PANEL Anderson HallasArchitects, PCARCHITECTUREHISTORIC PRESERVATION COPYRIGHT 2019ANY UNAUTHORIZED USE OF THESE DOCUMENTS IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF:ANDERSON HALLAS ARCHITECTS, P.C. PLANNING715 FOURTEENTH STREETGOLDEN, COLORADO 80401(303) 278-4378FAX (303) 278-0521 PITKIN COUNTY OURTHOUSE REMODEL PITKIN COUNTY, CO 506 E Main St St 300, Aspen, CO 81611 1/2" = 1'-0"6 BREAK RM 02A ENLARGED PLANA INTERIOR ELEVATION SOUTH LIB. 204 INTERIOR ELEVATION WEST 1/2" = 1'-0"4 JURY DELIB. 204 ENLARGED PLAN A parallel approach tothe sink is requiredwhen knee/toeclearances are notprovided. ICCA117.1-2009 606.2exception 1. Thedishwasher in theopen position cannotencroach into the clearfloor space of the sink804.5.3. WC36 WC12WC36 BC24BC24SB36 SOLID SURFACE COUNTERTOP WITH INTEGRAL 4" BACKSPLASH 1A9.11 Sim2A9.11 Sim CABINET LEGE BC =BASE CABINETSB=SINK BASE CABINET DW =DISHWASHER TC =TALL CABINETWC=WALL CABINET REF =REFRIGERATOR A9.7 2 3 BC24 TC30 SB36 2' - 0" CLR.BC24 1' - 10" 1' - 10" 2A9.11 Sim 1A9.11 Sim 1A9.11Sim30" X 48" CLEAR SPACE REF.2' - 0" APT. SIZE REF. PROVIDED BY OWNER EQ EQ 101F 101F DRAWINGS BASED ON FLOO PROVIDED BY PITKIN COUNTY TO NOTIFY ARCHITECT OF AN FROM ACTUAL FIELD CONDIT COMMENCING WITH WORK. 0 2' = 1'-0"101 INTERIOR ELEVATION NORTH 1/2" = 1'-0"1DA 101 ENLARGED PLAN 1/2" = 1'-0"4DA OFFICE 101 NORTH A parallel approach tothe sink is requiredwhen knee/toeclearances are notprovided. ICCA117.1-2009 606.2exception 1. And Arc AR HISTORI COPYRIGHT 2019ANY UNAUTHORIZ IS PROHIBITED W OF:ANDERSON HALL P 715 FO GOLDE FA Per information provided on the asbesos verification checklist this project requires an asbestos test. Provide an asbestos test report that includes the following: 1.Inspector’s narrative including sampling locations 2. Inspector’s certificate 3. Lab data If asbestos is found, a final air clearance report must be provided prior to building permit issuance. An A A HISTOR COPYRIGHT 20 ANY UNAUTHOR IS PROHIBITED OF:ANDERSON HA 715 GOL The special inspection agreement needs to be completed and signed by all parties prior to permit issuance. 08/21/2019 File Name: 2019.06.14 Pitkin Permit - Architectural.pdf Author: bonniem Subject: PlanCheck Color: Page Label: G0.3 GENERAL INFORMATION / EGRESS PLAN Provide the full installation instructions from the Gypsum Manual for WP 1072, WP 3510, WP 6800, FC3510 in the plan set for reference at inspection. NEW ACCESSIBLE ENTRANCE MAX TRAVEL DISTANCE: 57' 1231 / 40SF / OCC= 31 OCC DELAYED EGRESS DOOR. PROVIDE WEATHER PROOF SIGNAGE: PUSH UNTIL ALARM SOUNDS, DOOR CAN BE OPENED IN 15 SECONDS FEC FEC AX TRAVEL DISTANCE: 115' EC FEC FECFEC FEC FEC MAX TRAVEL DISTANCE: 125' FEC LEGEND FEC EGRESS PATHEGRESS DOOR WITH EXIT SIGNAGE FIRE EXTINGUISHER CABINETEXIT SIGNAGE, RE: ELEC TRAVEL DISTANCEBUILDING DIAGONAL DISTANCESIGNAGE: EMERGENCY EXIT ONLY, ALARM WILL SOUND UNLESS ACTIVATED BY KEY CARD WALL TYPES X A TYPE GRAPHIC REPRESENTATION FIRE RATING NA5/8" GWB5 1/2" WD STUDS AT 16" OCFULL DEPTH MINERAL WOOL ACOUSTIC INSULATION5/8" GWB6 3/4" B NA5/8" GWB5 1/2" WD STUDS AT 16" OCFULL DEPTH MINERAL WOOL ACOUSTIC INSULATION3/8" PORCELAIN TILE, 5/8" CTBB / 5/8" MOISTURE RESISTANT GWB ABOVE6 3/4" C: SECURE WALLS NA1/2" PLYWOOD5 1/2" WD STUDS AT 16" OCFULL DEPTH MINERAL WOOL ACOUSTIC INSULATION1/2" PLYWOOD SHEATHING RR SIDE 5/8" IMPACT RESISTANT GWB 5/8" IMPACT RESISTANT GWB D: PLUMB. CHASE WALLS 5 1/2" WD STUDS AT 16" OCFULL DEPTH MINERAL WOOL ACOUSTIC INSULATION3/8" PORCELAIN TILE, 5/8" CTBB / 5/8" MOISTURE RESISTANT GWB 7 3/4" 6 1/8" RR SIDE 2 1/8"E: NA NA 5/8" GWB1 1/2" WD FURRING AT 16" OCFULL DEPTH MINERAL WOOL ACOUSTIC INSULATION PUBLIC SECURE F: ACOUSTIC ISOLATION NA 5/8" GWB5 1/2" STAGGERED WD STUDS AT 8" OC FULL DEPTH MINERAL WOOL ACOUSTIC INSULATION RUNNING CONTINUOUSLY IN BETWEEN STUDS5/8" GWB 7 3/4"1" SPACE IN BETWEEN STUDS AND GWB, BOTH SIDES G: MASONRY INFILL NAMASONRY INFILL, RE: STRUCT.WD STUD S AT 16"O.C., ADJUST FURRING TO PROVIDE FLUSH FINISH 5/8" IMPACT RESISTANT GWB 5/8" IMPACT RESISTANT GWB VARIES WD STUD S AT 16"O.C., ADJUST FURRING TO PROVIDE FLUSH FINISH H: SHAFT WALLGA FILE #:WP 6800 1" X 24" PROPRIETARY TYPE X GYPSUM PANELS INSERTED BETWEEN 2 1/2" FLOOR AND CEILING RUNNERS WITH T SECTION OF 2 1/2" STEEL C-T STUDS BETWEEN PANELSONE LAYER 5/8' PROPRIETARY TYPE X GYPSUM WALLBOARD APPLIED PARALLEL TO STUDS WITH 1" TYPE S DRYWALL SCREWS 12" O.C. 3 1/8"1HR 5 1/4"I: DATA CABINET WALL NA 5/8" GWB1/2" PLYWD SHEATHINGFULL DEPTH MINERAL WOOL ACOUSTIC INSULATIONDATA SECURE 5/8" GWB3 1/2" WD STUDS AT 16" OC GENERAL: GENERAL ALL WALL TYPES, GWB BD TO EXTEND TO STRUCTURE NOTE: WHERE (1) HR FIRE RATING IS REQUIRED STEEL FRAMING GA FILE: WP1072WOOD FRAMING GA FILE: WP3510 1. DO NOT SCALE DRAWINGS2. ALL WORK TO BE PERFORMED TO APPLICABLE BUILDING CODES.3. ALL DIMENSIONS ARE TO FACE OF FINISH UNLESS OTHERWISE NOTED. ALL DIMENSIONS INDICATING REQUIRED CLEARANCES ARE TO FACE OF FINISH UNLESS OTHERWISE NOTED.4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING HIM OR HERSELF WITH THE CONTRACT DOCUMENTS, VERIFYING FIELD CONDITIONS AND DIMENSIONS, AND CONFIRMING THAT THE WORK MAY BE ACCOMPLISHED AS SHOWN PRIOR TO PROCEEDING WITH CONSTRUCTION. CONTRACTOR SHALL NOTIFY ARCHITECT IN WRITING OF ANY DISCREPANCY WITHIN THE CONTRACT DOCUMENTS AND REQUEST CLARIFICATION PRIOR TO PROCEEDING WITH CONSTRUCTION.5. SHOULD THERE BE ANY QUESTIONS CONCERNING THE CONTRACT DOCUMENTS, EXISTING CONDITIONS, AND/OR DESIGN INTENT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A CLARIFICATION FROM THE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK, OR RELATED WORK IN QUESTION.6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING HIMSELF WITH THE PROJECT SCOPE OF WORK, SCHEDULE, AND DEADLINES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADVISING THE ARCHITECT OF ALL ITEMS REQUIRING A LONG LEAD TIME UPON NOTICE TO PROCEED THAT WILL AFFECT THE SCHEDULE, AND SHALL SUBMIT ORDER CONFIRMATIONS AND DELIVERY DATES FOR THE ITEMS IN QUESTION TO THE OWNER.7. INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDED SPECIFICATIONS, EXCEPT WHERE THE CONTRACT DOCUMENTS ARE MORE STRINGENT. ANY MISCELLANEOUS ITEMS OR MATERIALS NOT SPECIFICALLY NOTED, BUT REQUIRED FOR PROPER INSTALLATION SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR. THE CONTRACTOR SHALL FURNISH TO THE OWNER ALL WARRANTIES AND GUARANTEES REQUIRED AT THE CONCLUSION OF THE PROJECT.8. ALL CONTRACTOR OR SUPPLIER REQUESTS FOR SUBSTITUTIONS OF SPECIFIED ITEMS SHALL BE SUBMITTED IN WRITING TO THE ARCHITECT WITHIN 14 DAYS OF NOTICE TO PROCEED, AND BE ACCOMPANIED WITH THE ALTERNATIVE PRODUCT INFORMATION. SUBSTITUTIONS WILL BE CONSIDERED ONLY IF IT DOES NOT SACRIFICE QUALITY, APPEARANCE, DELIVERY TIME, OR FUNCTION.9. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL HOOK UPS / UTILITY CONNECTIONS, ETC. TO TEMPORARY TRAILERS. GENERAL NOTES CEILING TYPES X TYPE GRAPHIC REPRESENTATION FIRE RATING GARDEN LEVEL CEILING ASSEMBLYGA FILE # 5310 ONE LAYER 5/8" TYPE X GYPSUM WALLBOARD OR GYPSUM VENEER BASE APPLIED AT RIGHT ANGLES TO RIGID FURRING CHANNELS 24" O.C. WITH 1" TYPE S DRYWALL SCREWS 12 O.C. GYPSUM BOARD END JOINTS LOCATED MIDWAY BETWEEN CONTINUOUS CHANNELS AND ATTACHED TO ADDITIONAL PIECES OF CHANNEL 60" LONG WITH SCREWS 12" O.C. RIGID FURRING CHANNELS APPLIED AT RIGHT ANGLES TO 4 X 10 OR DOUBLE 2 X 10 WOOD JOISTS 48" O.C. WITH TWO 1 1/4" TYPE S DRYWALL SCREWS AT EACH JOIST. WOOD JOISTS SUPPORTING 1 1/8" T &G PLYWOOD FLOOR. 1 5/8"1HR Project NumberDateDrawn byChecked by Anderson HallasArchitects, PCARCHITECTUREHISTORIC PRESERVATION COPYRIGHT 2019ANY UNAUTHORIZED USE OF THESE DOCUMENTS IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF:ANDERSON HALLAS ARCHITECTS, P.C. PLANNING Issue 715 FOURTEENTH STREETGOLDEN, COLORADO 80401(303) 278-4378FAX (303) 278-0521 Scale AS NOTED G0.3 GENERALINFORMATION /EGRESS PLAN 2017910 PITKIN COUNTY COURTHOUSE REMODEL PITKIN COUNTY, CO 5/2/19LWBRAS/NAA 506 E Main St St 300, Aspen, CO 81611 PERMIT 1/16" = 1'-0"1GARDEN LEVEL EGRESS PLAN6" = 1'-0"AIN LEVEL EGRESS PLAN 16" = 1'-0"ECOND LEVEL EGRESS PLAN DRAWINGS BASED ON FLOOR PLANS PROVIDED BY PITKIN COUNTY. CONTRACTOR TO NOTIFY ARCHITECT OF ANY DEVIATIONS FROM ACTUAL FIELD CONDITIONS, PRIOR TO COMMENCING WITH WORK. 10.10.12 DIRECTION OF SWING PIVOT OR SIDE-HINGED SWINGING DOORS SHALL SWING IN THE DIRECTION OF EGRESS TRAVEL WHEN SERVING A ROOM OR AREA CONTAINING AN OCCUPANCY LOAD OF 50 OR MORE PERSONS. 119'-10"/3 = 39'-11" 45'-5" 119'-10"/3 = 39'-11" 52'-11"119'-10"/3 = 39'-11" 59'-10" No. Description Date1 ADDENDUM 01 4/26/20193 ADDENDUM 03 6/12/2019 3 1 Provide the full installationinstructions from the GypsumManual for WP 1072, WP3510, WP 6800, FC3510 in theplan set for reference atinspection. 08/21/2019