Loading...
HomeMy WebLinkAboutFile Documents.541 Race St.0197.2019 (5).ARBK J City of Aspen 1.15.20 Building Department 120 Galena Street Aspen, CO 81611 RE: Permit# 0197.2019.arbk_additional Narrative_ CHANGE ORDER #2 Dear Building Officials, In addition to the REMP fee calculation and layout drawings previously submitted (11/19) please accept this letter as a further explanation of additional items relating to Change Order 2. Further, no intersection with previous approvals or agencies is anticipated. 1. Minor framing changes are proposed on the main level floor; in the dining room#102, at the stair opening#105 and at the master bathroom shower, rm #111. Please reference Structural drawing S1.02. Changes to the framing are clouded as change #2. 2. S1.01— Lower level framing and foundation plan. Rudd Construction would like to propose changes described on this sheet. We propose a gas line chase from the lower level mechanical room #014, up onto the West wall of the Garage 101. It will be in an accessible chase throughout. 3. Relocation of a drain line from under a tree drip-line at the edge of Fox Crossing Park. This was requested by Dave Radeck and incorporated into the civil design by Josh Rice. Please reference further revisions to the Civil design. CO #2 changes highlighted in yellow on sheets C2.0 and C3.1. If you require anything further, please advise. Very truly yours, Dg Qallysi9ned by Willis Pember DN:cn=WIllis Pember,o=WPA,ou, email=willisparvcomcast.net,c=US Date 2020.01.15 11:46:13-0700' Willis Pember,AIA Applicant: Fox Crossing Lots#4& 6, LLC Representative: Willis Pember Architects, Inc John Morton Willis Pember 6330 Mercer St 412 N. Mill Street Houston, TX 77005 Aspen, CO 81611c 713 299 7674 vc 970 920 1727 vc Cc: Scott Duryea, Rudd Construction RECEIVED 1 willis pember architects, inc 412 n mill street I aspen, co 81611 I 970 920 172702/21/2020 ASPEN BUILDING DEPARTMENT