A cut greater than 4' in height is
proposed near the north east
corner of the shoring system
according to the profile. Section
B-B depicts excavation
extending almost to the property
line, which is well into the
dripline of the existing trees.
Preserving these trees is a
requirement of the development
and no excavation will be
allowed beyond the building
limits. Please adjust plans.
RevisedPlan Set.2017.04.pdf (26)
Page Label: B-03
Author: mikeh
Date: 5/17/2017 1:21:40 PM
File Name: RevisedPlan Set.2017.04.pdf
No excavation is allowed on the
north side of the building in order
to preserve the existing trees.
Please adjust the plans.
Page Label: B-03
Author: mikeh
Date: 5/17/2017 9:52:45 AM
File Name: RevisedPlan Set.2017.04.pdf
Excavation is not allowed within
the alley ROW. Please adjust
plans to eliminate any
excavation within alley ROW.
Page Label: B-03
Author: mikeh
Date: 5/17/2017 10:28:57 AM
File Name: RevisedPlan Set.2017.04.pdf
Excavation extends into the
park. Permission from City of
Aspen Parks Department must
be obtained and provided in a
written letter or excavation must
be contained within the property
limits. Please obtain permission
or adjust the design.
Page Label: C-103
Author: mikeh
Date: 5/18/2017 4:47:31 PM
File Name: RevisedPlan Set.2017.04.pdf
Please verify that 100 yr storm
depth does not exceed 12" as
required in Section 4.4 of the
URMP.
K
7
E
H
G
F
J
6
A cut greater than 4' in height is proposed near the north eastcorner of the shoring system according to the profile. Section B-Bdepicts excavation extending almost to the property line, which iswell into the dripline of the existing trees. Preserving these trees isa requirement of the development and no excavation will beallowed beyond the building limits. Please adjust plans.
No excavation is allowed on the north
side of the building in order to preserve
the existing trees. Please adjust the
plans.
Excavation is not allowed within the alleyROW. Please adjust plans to eliminate
any excavation within alley ROW.
Excavation extends into the park.
Permission from City of Aspen Parks
Department must be obtained and
provided in a written letter or excavation
must be contained within the property
limits. Please obtain permission or
adjust the design.
Please verify that 100 yr storm depth
does not exceed 12" as required in
Section 4.4 of the URMP.
The ROW analysis of the cur,
gutter and curb inlet has been
re-done using the 100 year peak
event.
This section was not shown
correctly and has been
corrected.
This section was not shown
correctly and has been
corrected.
This section was not shown
correctly and has been
corrected.
This has been adjusted.
City of Aspen
Received
6/27/17
Building Department
Page Label: C-104
Author: mikeh
Date: 5/18/2017 9:48:20 AM
File Name: RevisedPlan Set.2017.04.pdf
The URMP requires a linear that
extends 10' from the foundation
to prevent infiltration and
deterioration of the foundation.
Please include the required liner
in the plans.
Page Label: C-104
Author: mikeh
Date: 5/17/2017 12:56:55 PM
File Name: RevisedPlan Set.2017.04.pdf
Truncated domes must be
parallel with traffic in order to
provide direction to the visually
impaired. Please adjust plans so
that truncated domes are
perpendicular to pedestrian flow.
Page Label: C-108
Author: mikeh
Date: 5/18/2017 10:11:15 AM
File Name: RevisedPlan Set.2017.04.pdf
This area of sidewalk and
landscape buffer must drain to
Aspen St in order to reduce
runoff reaching the infrastructure
at the intersection of Aspen and
Hopkins.
Page Label: C-108
Author: mikeh
Date: 5/17/2017 1:04:18 PM
File Name: RevisedPlan Set.2017.04.pdf
As noted in the last round of
comments, a low point is not
allowed in the sidewalk. In this
design, public infrastructure
depends on the function of
private infrastructure. Please
adjust plans so no low point
exists.
Page Label: C-108
Author: mikeh
Date: 5/18/2017 10:12:08 AM
File Name: RevisedPlan Set.2017.04.pdf
This area of sidewalk and
landscape buffer must drain to
Aspen St in order to reduce
runoff reaching the infrastructure
at the intersection of Aspen and
Hopkins.
The URMP requires a linear that extends
10' from the foundation to prevent
infiltration and deterioration of the
foundation. Please include the required
liner in the plans.
Truncated domes must be parallel withtraffic in order to provide direction to thevisually impaired. Please adjust plans sothat truncated domes are perpendicularto pedestrian flow.
This area of sidewalk and landscapebuffer must drain to Aspen St in order toreduce runoff reaching the infrastructureat the intersection of Aspen and Hopkins.
As noted in the last round of comments,a low point is not allowed in thesidewalk. In this design, public
infrastructure depends on the function ofprivate infrastructure. Please adjustplans so no low point exists.
This area of sidewalk andlandscape buffer must drain toAspen St in order to reduce runoffreaching the infrastructure at theintersection of Aspen and Hopkins.
A 30 mil PVC liner has been
called out in plan view for the
pavers under the entry. It will
extend to the property line.
These truncated domes have
been removed.
The sidewalk and front entry has been re-
graded. The sidewalk drains toward The
grass buffer. The sidewalk doesn't drain
into the on site infrastructure.
The longitudanal slope of the sidewalk
has been changes so there is no low
point.
Flow will follow the west side of the
sidewalk until it flow to the curb and
gutter near the east to west ADA ramp at
the intersection.
City of Aspen
Received
6/27/17
Building Department
Page Label: C-109
Author: mikeh
Date: 5/17/2017 11:17:45 AM
File Name: RevisedPlan Set.2017.04.pdf
Should perforated under drain
be connected to orifice plate?
Design is unclear. Please adjust
plans.
Page Label: C-109
Author: mikeh
Date: 5/17/2017 11:16:55 AM
File Name: RevisedPlan Set.2017.04.pdf
Outfall orifice is well below grade
and doesn't tie into any storm
water infrastructure. Should
orifice tie into perforated PVC
pipe? Please verify design and
depict on plans properly.
Page Label: C-109
Author: mikeh
Date: 5/18/2017 9:16:32 AM
File Name: RevisedPlan Set.2017.04.pdf
No under drain is depicted on
plans, only in this detail. If under
drain is proposed, please include
on all necessary sheets.
Page Label: C-110
Author: mikeh
Date: 5/18/2017 9:26:42 AM
File Name: RevisedPlan Set.2017.04.pdf
With stormwater pipes invert out
below the bioretention media the
runoff does not receive any
treatment before reaching the
COA stormwater system as
required. The screened rock bed
is not an infiltration BMP,
therefore the runoff must receive
treatment before the rock bed.
Please have all runoff infiltrate
through the bioretention media.
Past comments apply with
infiltration rate of media to
ensure all runoff is treated for
the WQCV.
Page Label: C-111
Author: mikeh
Date: 5/19/2017 8:40:53 AM
File Name: RevisedPlan Set.2017.04.pdf
If centerline is not accurate, then
sawcut must be adjusted to
extend to the centerline of Aspen
St.
Should perforated under drain beconnected to orifice plate? Design isunclear. Please adjust plans.
Outfall orifice is well below grade and
doesn't tie into any storm water
infrastructure. Should orifice tie into
perforated PVC pipe? Please verify
design and depict on plans properly.
No under drain is depicted on plans, onlyin this detail. If under drain is proposed,please include on all necessary sheets.
With stormwater pipes invert out below the bioretention media the
runoff does not receive any treatment before reaching the COAstormwater system as required. The screened rock bed is not aninfiltration BMP, therefore the runoff must receive treatment before
the rock bed. Please have all runoff infiltrate through thebioretention media. Past comments apply with infiltration rate ofmedia to ensure all runoff is treated for the WQCV.
If centerline is not accurate, then sawcutmust be adjusted to extend to the
centerline of Aspen St.
The perforated under drain is connected
to the second orifice plate.
The orifice plate is now attached to the
perforated under drain. Below this under
drain is PVC liner which also directs
runoff to the perforated under drain.
The perforated under drain is called out in
plan view and on the storm drain profiles.
This detail has been changes to show the
orifice plate.
These storm drains now daylight above
the medium. The infiltration rate of the
medium is not needed as the bio-pond/
swales/plater have enough capcity above
the finished grade surface and the bottom
of the weirs for the WQCV.
Additional survey was obtained to
determine the expect location of the
crown and center line. The center line and
crown have been shown and the saw cut
line adjusted.
City of Aspen
Received
6/27/17
Building Department
Page Label: C-111
Author: mikeh
Date: 5/18/2017 3:50:57 PM
File Name: RevisedPlan Set.2017.04.pdf
Are these dimensions correct?
Where the road is full width one
side is 28' and the other is 21',
even with the same parking
alignment on each side of the
street. Please verify as the 13.6'
dimension is tight for a bike and
vehicle lane.
Page Label: C-112
Author: mikeh
Date: 5/18/2017 9:10:33 AM
File Name: RevisedPlan Set.2017.04.pdf
This low spot within the sidewalk
is not allowed. Please adjust the
plans.
Page Label: C-117
Author: mikeh
Date: 5/18/2017 9:58:19 AM
File Name: RevisedPlan Set.2017.04.pdf
Please include note that
contractor not to disturb soil
behind the thrust block while
excavating for storm line.
Page Label: C-117
Author: mikeh
Date: 5/17/2017 4:15:59 PM
File Name: RevisedPlan Set.2017.04.pdf
7' of cover is required throughout
the line. Current design has the
4" service line raise roughly 1'
over the 45', which decreases
the cover at the building. Please
adjust plans to ensure 7' of
cover.
Page Label: C-117
Author: mikeh
Date: 5/17/2017 4:17:00 PM
File Name: RevisedPlan Set.2017.04.pdf
Profile must include thrust block
locations. Please adjust plans.
Are these dimensions
correct? Where theroad is full width oneside is 28' and theother is 21', even withthe same parkingalignment on each sideof the street. Please
verify as the 13.6'
dimension is tight for a
bike and vehicle lane.
This low spot within the sidewalk is notallowed. Please adjust the plans.
Please include note that contractor not to
disturb soil behind the thrust block while
excavating for storm line.
7' of cover is required throughout the line.
Current design has the 4" service line raiseroughly 1' over the 45', which decreases
the cover at the building. Please adjust
plans to ensure 7' of cover.
Profile must include thrust block
locations. Please adjust plans.
With the new additional survey these
dimension where verified.
The longitudinal slope of the sidewalk
no longer has a low point.
A note has been added to the utility
sheet as well as the storm layout sheet.
The water service depth is over 7' and
a note has been added specifying a 7'
min. depth.
Thrust block have been added to the
bend call outs on the profile.
City of Aspen
Received
6/27/17
Building Department
Page Label: C-117
Author: mikeh
Date: 5/18/2017 9:07:58 AM
File Name: RevisedPlan Set.2017.04.pdf
If tie rods are incorporated into
the design, please include
minimum lengths, rod thickness,
direction, and other pertinent
information with regards to the
tie rods.
Page Label: C-117
Author: mikeh
Date: 5/17/2017 4:10:45 PM
File Name: RevisedPlan Set.2017.04.pdf
No thrust block or second form
of restraint is included for the
tee. Please include a restraint
design for the tee.
Page Label: C-117
Author: mikeh
Date: 5/17/2017 3:33:04 PM
File Name: RevisedPlan Set.2017.04.pdf
Penetration detail including
restraint must be included in the
plan set. Please include
penetration detail.
Page Label: C-117
Author: mikeh
Date: 5/18/2017 9:55:45 AM
File Name: RevisedPlan Set.2017.04.pdf
Please provide letter from Quest
allowing the lid to be relocated
and the logistics of the work.
Page Label: C-117
Author: mikeh
Date: 5/19/2017 8:57:13 AM
File Name: RevisedPlan Set.2017.04.pdf
8" C900 is very close to the
communications vault. If in the
field the pipe needs to be
re-routed then a change order
will be required.
If tie rods are incorporated into the
design, please include minimum lengths,
rod thickness, direction, and other
pertinent information with regards to the
tie rods.
No thrust block or second form ofrestraint is included for the tee. Pleaseinclude a restraint design for the tee.
Penetration detail including restraint
must be included in the plan set. Please
include penetration detail.
Please provide letter from Quest
allowing the lid to be relocated and the
logistics of the work.
8" C900 is very close to thecommunications vault. If in the field thepipe needs to be re-routed then a
change order will be required.
Information regarding the tie rods has been
added to plan view on the utility sheet. Tie rods
will extend back 20' to mid-span restrainsts or to
the next bell with bell restrants added.
A trust block has been shown for the tee
in plan and profile view.
The mechanical consultant has provided
a detail.
A letter from Qwest will be added to the
comment response submittal.
If the vault posses a conflict during
exploratory excavation then a change
order will be submitted to re-rout the 8"
C900 pipe.
City of Aspen
Received
6/27/17
Building Department
Page Label: C-118
Author: mikeh
Date: 5/17/2017 4:22:20 PM
File Name: RevisedPlan Set.2017.04.pdf
No excavation is allowed for the
sidewalk. 10" excavation will not
be allowed within the vicinity of
the trees.. Please adjust the
detail to exclude excavation.No excavation is allowed for thesidewalk. 10" excavation will not be
allowed within the vicinity of the trees..Please adjust the detail to exclude
excavation.
The excavation call out has been
removed from this detail and a note has
been added saying no excavation is
allow.