HomeMy WebLinkAboutFile Documents.430 W Hallam St.0291.2017 (82).ARBK0291.2017.arbk_CMPcomments_1
Page: 11
Author: patrickh
File Name: Construction Management Plan.430 W
Hallam.2017.11.pdf
The allowable noise limit at this location is 70 db
during the summer on season (6/1- Labor Day) 80
db all other times
11 (1)
Page: 23
Author: patrickh
File Name: Construction Management Plan.430 W
Hallam.2017.11.pdf
Is there soil stabilization as part of this project? If
so, you will need to provide a soil stabilization plan
and a noise suppression plan.
23 (3)
Page: 23
Author: patrickh
File Name: Construction Management Plan.430 W
Hallam.2017.11.pdf
Is the plan to have all this in the street? If so, a
Temp Encroachment will be needed.
Page: 23
Author: patrickh
File Name: Construction Management Plan.430 W
Hallam.2017.11.pdf
Where is the main access for the site? Where will
dump trucks be loaded, deliveries received, etc...
es operated within the City of Aspen shall be of a shad city, except for starting motion no longer than 10 secon ng 10 seconds.
SSION
on is 80 decibels measured at the property line of the n equipment shall be adequately muffled and maintain allation of noise barriers is the minimum technique to s mering of concrete occurs.
The allowable noise
limit at this location is70 db during thesummer on season
(6/1- Labor Day) 80db all other times
STAGING AREAS
Is there soil stabilization as
part of this project? If so,
you will need to provide asoil stabilization plan and anoise suppression plan.
RAISED HERBPLANTERGARDEN
WEST HALLAM STREET
EX. TREE TOPROTECT ANDREMAIN. SEE TREEREMOVAL ANDPROTECTION PLAN
LAWN
EX. TREE TOPROTECT ANDREMAIN. SEE TREEREMOVAL ANDPROTECTION PLAN
SHRUB AND PERENNIAL BED
8x20 CONSTRUCTIONTRAILER 10Y ROLL OFFDUMPSTER
GREEN PLASTIC FENCING TOPROTECT EXISTING TREESTYPICAL
5Y RECYCLEDUMPSTER Is the plan to have allthis in the street? Ifso, a TempEncroachment will beneeded.
EX. TREE TO PROTECT ANDMAIN. SEE TREE REMOVAL ANDPROTECTION PLAN
n Where is the main access for thesite? Where will dump trucks beloaded, deliveries received, etc...
forumphi.com | p. 970.279.4109 | f. 866.770.5585
Aspen: 715 W. Main St, #204 Aspen, CO 81611
Basalt: 104 Midland Ave, #202 Basalt, CO 81621
FORUM PHI | 430 W Hallam St Clarifications
CMP
***Numbers correspond with numbering found on comments PDF***
1. Section 11 Noise suppression updated with seasonal noise restrictions.
2. Soil stabilization will be required for this project. Soil stabilization plan can be found on Appendix F.1.
Additional details for the noise suppression plan can be found in Section 11. Trees to remain shown on
Appendix F.
3. Appendix F updated to show full width of street, dimensions of street-side construction items, and entry
locations. Temporary Encroachment will be required but would be finalized closer to the start date.
4. Appendix F updated to show full width of street, dimensions of street-side construction items, and entry
locations.