Page: [1] 24x36
Page Index: 12
Checkmark: Unchecked
Author: tonyk
Date: 3/8/2019 11:01:00 AM
Color:
File Name: 19 CMP - 1112 Waters Ave.pdf
Please maintain 7' clear from
edge of pavement.
tonyk (3)
Page: 8
Page Index: 8
Checkmark: Unchecked
Author: tonyk
Date: 3/8/2019 11:25:34 AM
Color:
File Name: 19 CMP - 1112 Waters Ave.pdf
Please include diagram showing
extent/depth of excavation and
specific stabilization plan.
Page: 10
Page Index: 10
Checkmark: Unchecked
Author: tonyk
Date: 3/8/2019 11:12:14 AM
Color:
File Name: 19 CMP - 1112 Waters Ave.pdf
Due to Mechanical stabilization,
a full modeled noise mitigation
plan is required.
WAT
E
R
S
A
V
E
N
U
E
60' R
-
O
-
W
ASP
H
A
L
T
COA GPS #1 BEARSN37°57'09"W 954.00'
RS04'
CTV
CTV
CTV
CTV
CT
V
CT
V
T
T
T
T
T
G
G
G
79
7
S 52°5
1
'
0
0
"
W
3
8
.
0
PK NAIL & SHINERL.S. #25947 TBMEL=7969.60'
TELE.LINE (TYP.)
CATV
PED.
GRAVELDRIVEWAY
10' U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
PER
D
I
T
C
H
B
O
O
K
2
A
P
A
G
E
2
8
5
& BO
O
K
2
0
3
P
A
G
E
4
7
9
SMUG
G
L
E
R
V
I
E
W
T1
T2
T3
2
5
'
SS
SS
SS
SS
SS
SS
AP
P
R
O
X
.
S
E
W
E
R
S
E
R
V
I
C
E
P
E
R
A
C
S
D
STORAGE
Please maintain 7'
clear from edge of
pavement.
5.6. CONSTRUCTION TRAILER, MATERIALS STORAGE, AN No loose job materials will be stored in the ROW. On site recycling separation will occur on this project per the During demolition, concrete and scrap metal will be sorted a designated areas.
Please include
diagram showingextent/depth of
excavation and
specific stabilization
plan.
11.1. GENERAL All Construction equipment shall be adequately muffled and maintained to minimize project noise. 11.2. NOISE SUPPRESION PLAN All activity that generates noise in excess of 80 decibels will be restricted to operating between the hours of 9AM and 5PM Monday thru Friday. A sound barrier is depicted on the CMP Site Plan. Vertical micropile shoring is minimal. Depths are only 5-6ft and the line of length of the shoring is short. KFH can mitigate sound, using portable sound blankets (owned by KFH) attached to fencing. We do not believe engineered sound control is necessary for this project. Should the use of minor excavation equipment generate excess noise levels KFH will erect sound matting for temporary purposes, along the north and south sides of the site, to a height of 6ft. 11.3. CONTINUED NOISE MONITORING Continued noise monitoring will be installed if required by the Engineering dept.
Due to Mechanicalstabilization, a fullmodeled noise
mitigation plan isrequired.
1. GC
Text in green represents organization and written responses to comments. 4.3.2019
2. GC
3. GC
SEE Exhibit A - Construction fencing now placed on plan.
SEE Exhibit B for notes regarding stabilization.
SEE Exhibit B for notes regarding noise mitigation.
4/10/2019