HomeMy WebLinkAboutFile Documents.731 S Mill St.0103.2019 (4).ARBKJoblon Remodel 731 S Mill ST # 2D Construction Management Plan 1.) Intro: The project at 731 S Mill St # 2D will include 940 sf. of interior renovation. No exterior work will be performed and no soil will be disturbed 2.1) Disturbance area: 0 sf. Soil disturbance 2.2) Location: see map below, 5.6 2.3) Description: The 940 sf. of interior renovation will take place in an existing multifamily apartment building in unit 2D. Building type is R2. 3.1) Permits: Building Permit, electrical, plumbing, Mechanical will be applied for as appropriate. 3.2) Project notification : Neighbors have been notified and approval has been granted by the HOA. 3.3 Signs- A sign shall be provided that meets the requirements of the City Municipal code 26.510.030B4 3.4) Contacts Designation: Owner: Matt Joblon, Gemlo Aspen Holdings LLC 731 S Mill St # 2D Aspen CO 81611 508-344-2557 matt@bmcinv.com Contractor: AM2 Construction Andy Mishmash PO Box 4120 Basalt CO 81621 970-309-7040 Andy.AM2@Gmail.com Traffic Control Officer: N/A – No street closures/ need for traffic control are anticipated Erosion Control Officer: N/A- No soil disturbance is anticipated Hospital: Aspen Valley Hospital 970-925-1120 Fire: Aspen Fire Protection District 970-925-5532 04/29/2019 Police: Aspen Police Department 970-920-5400 City of Aspen:970-920-5031 RFTA: 970-925-8484 4.1) Dates of Construction: Construction will commence on June 15tht and will be complete before Labor Day. 4.2) Hours of Construction: Construction will take place between the hours of 7:30 AM and 5:30 PM Monday- Friday, and 9:00 AM- 5:00 pm on Saturdays. No construction will take place during holidays or on Sundays, or during Food and Wine. 4.3) Phasing: All work will be completed in 1 phase of construction. 4.4) Adjoining Properties – HOA has given approval. Construction will take place at time of year when most neighboring units are uninhabited, mitigating effects on the neighbors. 4.5) Project Fencing- N/A, Interior Renovation 4.6 ) Public Health and Welfare- N/A- Interior Renovation 4.7) Natural Environment- N/A Interior Renovation 5.1) Right of Way Management -ROW shall not be encroached upon 5.2) Emergency Vehicle Access- Roads shall not be blocked; Continuity of access for emergency vehicles shall be maintained at all times for this and surrounding projects. 5.3) Construction Parking- This project will have a minor impact. Employee carpooling will be encouraged, with no more than 3 construction vehicles on site at one time. 5.4) Project Staging –Materials will be stored in the parking spot associated with the apartment to be renovated. 5.5) Right of Way Limitations- No ROW encroachments are anticipated. N/A 5.6) Site Plan- See attached 04/29/2019 5.7) Waste Management - Recycling and Trash to be located in parking area associated with apartment #2D. 6.1) general traffic control: N/A – No traffic control officer will be required for this project 6.2) Haul Routes : N/A- No heavy equipment is anticipated 6.3) On site Vehicle Limitations - Workers will be encouraged to carpool. No more than 3 work trucks will be on site each day. Permission to use parking spots associated with neighboring apartments have been requested as neighbors are out of town during construction . If Permission is withdrawn, construction parking permits will be requested from the city. 6.4) Delivery Requirements- No more than one delivery at a time. 6.5) Traffic Control Plan N/A – There will be no need to close down any public streets or R.O.W’s 7.0) Pedestrian Protection N/A –Interior Renovation 8.0) Erosion Control N/A 9.0) Fugitive Dust Control N/A 10.) Emissions N/A 11.) Noise Suppression N/A 12.) Enforcement N/A 13.) Construction Mitigation Committee N/A 14.) Appeal Process N/A 04/29/2019