Loading...
HomeMy WebLinkAboutFile Documents.975 Chatfield Rd.0224.2017 (109).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK Per this project’s asbestos inspection report, your project does not require a State asbestos abatement permit. However, the following OSHA regulation must be strictly adhered to: Standard Title 29, Part 1910.134, 1910.1001, and 1926.1101 of the Code of Federal Regulations. It is recommended that you familiarize yourself with these regulations and have a certified General Abatement Contractor (GAC) conduct the removal of the Asbestos Containing Material (ACM) under engineering controls and that once the removal process is completed, a visual inspection and clearance air monitoring be conducted by an independent, certified Air Monitoring Specialist. Furthermore, identified ACM may be in areas which were either not covered in the scope of the asbestos inspection or were inaccessible or hidden due to their application during the construction process and their subsequent enclosure or covering with building and finish materials. These areas should be inspected when renovation or demolition activities are scheduled which may disturb the materials within, or beneath these barriers. SPECIAL INSPECTION AND TESTING AGREEMENT To permit applicants of project requiring special inspection and\or testing per Section 1704 of the International Building Code (IBC). Project Address: __________________________________ Permit Number:______________________ BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures. APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official, when performing the function of special inspector. Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable: A. Duties and Responsibilities of the Special Inspector 1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they shall sign in on the appropriate form posted with the building permit. Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings, specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection. For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record. 3. Report nonconforming items. The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice. Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items, c. Report on how nonconforming items were resolved or unresolved as applicable, d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items. 2. 4. 1 5. Provide Final Inspection Report. The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection. B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official. C. Engineer or Architect of Record Responsibilities 1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the IBC or the building official approves periodic inspection and the frequency of such inspections. Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the special inspector. Review shop drawings and submit design changes. The engineer or architect of record shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents, and shall submit revised documents for building official approval as required. 2. 3. D. Contractor Responsibilities 1. Notify the special inspector. The contractor is responsible for notifying the special inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall be provided so the special inspector has time to become familiar with the project. Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans. Retain special inspection records. Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector. 2. 3. E. Inspection of Fabricators 1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated items. Fabrication and implementation procedures. The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for fabricator’s scope of work. 2. F. Approved Fabricator Responsibilities 1. Fabrication exempt inspections. Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work without special inspection. 2 NT Nick Thompson 1/12/18 SPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting -Epoxy anchors Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. 01/12 / 2 0 1 8 nickt Code Editions Fire Sprinkler System Type Of Construction Fire Alarms Installed Required Special Inspections Energy Code Compliance Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________ Building Type/Occupancy Group COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DESCRIPTION FORM - IRC & IBC CITY OF ASPEN 1ϯ0 S. GALENA ST ͮ ASPEN, CO 81ϲ11 BUILDING CODE INFORMATION Ϯ01ϱ IRC Existing?NFPA 1ϯ NFPA 1ϯ R High-Strength Bolting Epoxy Anchors Structual Steel Welding Permanent Micropiles Other _____________ Prescriptive Table UNIT DESCRIPTION AS PROPOSED # Stories Above Grade ______ # Stories Below Grade _______ Parking Spaces ______ Parking Spaces ______ Parking Spaces ______ # Bedrooms ______ # Full Baths ______ Deck Area ______ # ϯ/ϰ Baths ______ # 1/Ϯ Baths ______ # Kitchens ______ # Wood Fireplaces ______ # Gas Appliances ______ # Gas Logs______ NFPA 1ϯ D RESCheck UA Alternative Yes No One Family Two Family Townhouse Reviwed By: _____________________Date:__________ BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage) Basement ___________________________________________________________________________________ ___________________________________________________________________________________________ Main Level __________________________________________________________________________________ ____________________________________________________________________________________________ Ϯnd Floor ___________________________________________________________________________________ __________________________________________________________________________________________ ϯrd Floor ___________________________________________________________________________________ ___________________________________________________________________________________________ Additional ___________________________________________________________________________________ ___________________________________________________________________________________________ Attached Garage Detached Garage Carport Is there an ADU? # Living Rooms_____ # Kitchens _____ # Full Baths _____ # ϯ/ϰ Baths _____ # 1/Ϯ Baths _____ # Bedrooms _____ # Other Rooms (List)____________ ADU BUILDING DESCRIPTION YesNo ADDRESS: ____________________________PERMIT NUMBER: _______________________________ (As Adopted and Amended) Other (Please Explain) __________________________ __________________________ VA VB IV IIIA IIIB IIA IIB IA IB Sprayed Fire-Resistants COMCheck UA Alternative (Existing н New) A__B B (A фϱ0) F__ H__ I __ E R__ S__ U M IRC IBC Ϯ01ϱ IBC (As Adopted and Amended) Yes No Required?Yes No Type August 2017 975 Chatfield Rd Aspen n n nn n n n n n n 0 0 0 n 3 1 2 0 n 4 1 3 3 1 1 0 1 1 2 Floors Down from Main Level- l -Mechanical room. 3/4 bathroom. TV Room. Closet Kitchen. Breakfast Room, Living Room, Dining Room, Powder Room, Guest Bedroom Guest Bath, Master Bathroom, Master Bedroom, Master Closet (2) Lower Level 1 Floor down from Main- Sitting Room, Laundry Rm, Small Mechanical Bedroom, Bathroom Entry Level Floor- -Guest Coat Closet, Entry Hall Garage, Guest Bedroom, Guest Bathroom Note House is on a hill. Not one of these levels is below grade. They are all on grade as they go down the hill. NT 1/12/18 FIRE SPRINKLERS REQUIRED Contact Fire Marshall SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION MASTER PERMIT: ______________________DATE:___________ CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ __________________________________________________________________________________ ____________________________________________________________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ PERMIT NUMBER: __________________________ Commerical Multi-FamilySingle Family Use of Building Class of Work NewAdditionAlterationRepair ________ YesNo Will there be any roof/wall penetrations? NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. __________________ _________________ __________________ ____________________ ________________ _________________ __________ PROJECTVALUATION SQ FT OF WORK AREA UNIT SQ FT SQ FT OF LAND-SCAPE WORK SQ FT OF ROOMS WITH UTILITY WORK LOT SIZE(SQ FT) PROJECT DETAILS Mixed-Use IFFRTenant FinishDemolitionChange Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL FOR CITY USE ONLY Plan Check Permit Fee Parks Impact Energy Code REMP School Ded. Zoning (50%)Plan Check (Hourly) TDM Impact Engineering Review Zoning (Hourly)Ped. Amenity CMP (50%)Engineering (Hourly) Housing Cash in Lieu Parks Review Zoning (50%)Stormwater Utility Review CMP (50%)City Use Tax Other Electrical County Use Tax Plumbing GIS Mechanical Sanitation SUBMITTAL FEES ISSUANCE FEES __________________PLANS LOCATION _________Lot Area _________Zone District _________Deed Restricted _________Census Code _________# of Dwellings APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub ____Lavatory (Wash Basin) ____Shower ____Kitchen Sink (+Disposal) ____Dishwasher ____Laundry Bar, Utility Sink ____Clothes Washer ____Floor Sink ____Floor Drain ____Shower ____Water Heater (Pan Req) ____# Gas Outlets ____Water Treatment ____Other_________ Fixture Counts ____Forced Air/Gravity Systems ____Wall, Suspended, or Unit Heaters ____Gas Log ____Gas Appliancew ____Appliance Vents ____Heat, Refrig, Cooling, or Absorption Unit ____Boilers (includes vent) ____Air Handling Unit ____Cooling Systems ____Ventilation Fans ____Range Hood ____# of Gas System Outlets ____Snowmelt System Sq Ft_________ Equipment Checklist Zoning HPC Building Fire Engineering CMP Utilities Water Stormwater Sanitation Env. Health Parks Landscape Efficiency Approved To Issue Issuance ReviewRequired Date ApprovedReviewingDepartmentReviewerInitials Call Assessor (970-920-5160) to verify NEW SQ FT Details Term Definitions Project Valuation: Cost of project as defined in Valuation Affadavit. Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration. Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit. Lot Size: Total surveyed square footage of property. Sq Ft of Landscape Work: Square footage of disturbed exterior area. New Sq Ft: Total added square footage for additions to net livable or net leasble space. Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.DO YOU LIKE DOGS? August 2017 0224.2017.ARBK 975 Chatfield Road 2735 0240 2001 7 West Aspen Subdivision Remodel of interior spaces. New Kitchen bathroom cabinets/countertops Reuse Appliances. New flooring/carpet/tile. Remove some walls. Add 3 new windows. Replace existing windows same size John Walker 970-379-7598 JWalk22401@aol.com KRB Real Estate Assoc LLC 215-351-1500 Barry Bernsten <BBRRI@aol.com> 1.5 million 61 n 8 n n 411 0 4876 5294 (fire area) 16827 110 0 594.38 0 122 02 20432741040 x JP 12/19 18866.25 29025 x NT 1/12/18 4353.75 NT 1/12/18 487.50 x x TK 9/26 2441.74 504.81 487.50 2441.74 14700 3750 DR 12/19x 434 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP OWNER ___________________________________ _____________________ ________________________Name Phone E-mail FOR PLAN REVIEW QUESTIONS ___________________________________ _____________________ ________________________Name Phone E-mail FOR INSPECTION QUESTIONS ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP OWNER’S AUTHORIZED AGENT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP APPLICATION BEST CONTACT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP ARCHITECT OR DESIGNER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP CIVIL ENGINEER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP STRUCTUAL ENGINEER OF RECORD I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. ________________________________________________________ _____________________ContractorSignature Date IE^WCdIKE^͗ dŚe 'eneral ContraĐtor ŵust sĐŚeĚule insƉeĐtions online͘ Wlease visit ǁǁǁ͘asƉenƉitŬin͘ĐoŵͬeƉartŵentsͬCoŵŵunity-eveloƉŵent-&orŵsͬ to Ěo so͘ ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP GENERAL CONTRACTOR Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit. (CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file ADDRESS: ____________________________PERMIT NUMBER: _______________________________ August 2017 975 Chatfield Rd Aspen Soraya Gallego Matter Interiors 847-712-0888 soraya@matterinteriors.com John Walker 970-379-7598 JWalk22401@aol.comS KRB Real Estate Assoc LLC 215-351-1500 215-917-1700 309 C S 2ND St Philadelphia PA 19106 Barry Bernsten <BBRRI@aol.com> Barru Bernsten 215-351-1500 215-917-1700 309 C S 2ND ST Philadelphia PA 19106 Barry Bernsten <BBRRI@aol.com> John Walker 970-379-7598 970-379-7598 PO BOX 10255 Aspen CO 81612 JWalk22401@aol.com Matter Interiors 970-379-5401 970-379-5401 PO BOX 1045 Aspen CO 81612 noelle@matterinteriors.com N/A Albright Associates 970-927-4363 (970) 379-3244 402 Park Ave Unit A Basalt Co 81621 jack@albright-associates.com John Walker Builder 970-379-7598 970-379-7598 PO BOX 10255 Aspen CO 81612 JWalk22401@aol.com DAM 1 /17/18 ALL OUTDOOR LIGHTING MUST COMPLY WITH THE CITY OF ASPEN LIGHTING CODE SECTION 26.575.150 12/06/2018