HomeMy WebLinkAboutFile Documents.975 Chatfield Rd.0224.2017 (109).ARBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
Per this project’s asbestos inspection report, your project
does not require a State asbestos abatement permit.
However, the following OSHA regulation must be
strictly adhered to: Standard Title 29, Part 1910.134,
1910.1001, and 1926.1101 of the Code of Federal
Regulations. It is recommended that you familiarize
yourself with these regulations and have a certified
General Abatement Contractor (GAC) conduct the removal
of the Asbestos Containing Material (ACM) under
engineering controls and that once the removal process is
completed, a visual inspection and clearance air
monitoring be conducted by an independent, certified Air
Monitoring Specialist. Furthermore, identified ACM may
be in areas which were either not covered in the scope of
the asbestos inspection or were inaccessible or hidden
due to their application during the construction process
and their subsequent enclosure or covering with building
and finish materials. These areas should be inspected
when renovation or demolition activities are scheduled
which may disturb the materials within, or beneath these
barriers.
SPECIAL INSPECTION AND TESTING AGREEMENT
To permit applicants of project requiring special inspection and\or testing per Section 1704 of the International Building Code (IBC).
Project Address: __________________________________ Permit Number:______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved
identification, as stipulated by the building official, when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable:
A. Duties and Responsibilities of the Special Inspector
1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they shall sign in on the appropriate form posted with the building permit.
Observe assigned work. The special inspector shall observe assigned work for
conformance with the building department approved (stamped) design drawings, specifications, and applicable workmanship provisions of the International Building
Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection.
For continuous special-inspection, the special inspector shall be on site at all times
observing the work requiring special inspection. Periodic inspections, if any, must have prior approval based on a separate written plan reviewed and approved by the building
department and the engineer or architect of record.
3. Report nonconforming items. The special inspector shall bring nonconforming items to
the immediate attention of the contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the
special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice.
Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports
directly to the building official, engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations,
b. Listing of nonconforming items, c. Report on how nonconforming items were resolved or unresolved as applicable,
d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items.
2.
4.
1
5. Provide Final Inspection Report. The special inspector shall submit a written final
report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection.
B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the
owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official.
C. Engineer or Architect of Record Responsibilities
1. Prepare special inspection program. The engineer or architect of record shall list the
items for which special inspection is required; and shall indicate any items for which the IBC or the building official approves periodic inspection and the frequency of such inspections.
Respond to field discrepancies. The engineer or architect of record shall respond to
uncorrected field discrepancies in design, material, or workmanship observed by the special inspector.
Review shop drawings and submit design changes. The engineer or architect of record
shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official
and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents, and shall submit revised
documents for building official approval as required.
2.
3.
D. Contractor Responsibilities
1. Notify the special inspector. The contractor is responsible for notifying the special inspector or agency regarding individual inspections for items listed on the attached
schedule and as noted on the building department approved plans. Adequate notice shall be provided so the special inspector has time to become familiar with the project.
Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans.
Retain special inspection records. Upon request, the contractor is also responsible for
retaining, at the job site, all special inspection records completed by the special inspector.
2.
3.
E. Inspection of Fabricators
1. Fabrication of structural assemblies and members. Where fabrication of structural
load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated
items.
Fabrication and implementation procedures. The special inspector shall verify that
the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to
approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for
fabricator’s scope of work.
2.
F. Approved Fabricator Responsibilities
1. Fabrication exempt inspections. Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work
without special inspection.
2
NT Nick Thompson 1/12/18
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
-Epoxy anchors
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
01/12
/
2
0
1
8
nickt
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEN 1ϯ0 S. GALENA ST ͮ ASPEN, CO 81ϲ11
BUILDING CODE INFORMATION
Ϯ01ϱ IRC
Existing?NFPA 1ϯ NFPA 1ϯ R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# ϯ/ϰ Baths ______ # 1/Ϯ Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
NFPA 1ϯ D
RESCheck UA Alternative
Yes No
One Family Two Family
Townhouse
Reviwed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
Ϯnd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
ϯrd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport Is there an ADU?
# Living Rooms_____
# Kitchens _____
# Full Baths _____
# ϯ/ϰ Baths _____
# 1/Ϯ Baths _____
# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
YesNo
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
__________________________
__________________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing н New)
A__B
B (A фϱ0)
F__
H__
I __
E R__
S__
U
M
IRC
IBC
Ϯ01ϱ IBC
(As Adopted and Amended)
Yes
No Required?Yes
No Type
August 2017
975 Chatfield Rd Aspen
n
n nn
n n
n n n
n
0 0 0
n
3 1
2 0 n
4 1 3
3 1
1 0
1 1
2 Floors Down from Main Level- l -Mechanical room. 3/4 bathroom.
TV Room. Closet
Kitchen. Breakfast Room, Living Room, Dining Room, Powder Room, Guest Bedroom
Guest Bath, Master Bathroom, Master Bedroom, Master Closet (2)
Lower Level 1 Floor down from Main- Sitting Room, Laundry Rm, Small Mechanical
Bedroom, Bathroom
Entry Level Floor- -Guest Coat Closet, Entry Hall
Garage, Guest Bedroom, Guest Bathroom
Note House is on a hill. Not one of these levels is below grade.
They are all on grade as they go down the hill.
NT 1/12/18
FIRE
SPRINKLERS
REQUIRED
Contact Fire Marshall
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
MASTER PERMIT: ______________________DATE:___________
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
__________________________________________________________________________________
____________________________________________________________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
PERMIT NUMBER: __________________________
Commerical
Multi-FamilySingle Family
Use of Building Class of Work
NewAdditionAlterationRepair
________
YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and
void if work or construction authorized
is not commenced within 180 days, or
if construction or work is suspended or
abandoned for a period of 180 days at
any time after work is commenced.
__________________
_________________
__________________
____________________
________________
_________________
__________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
SQ FT OF LAND-SCAPE WORK
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
Mixed-Use
IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Energy Code REMP School Ded.
Zoning (50%)Plan Check
(Hourly)
TDM Impact
Engineering Review Zoning (Hourly)Ped. Amenity
CMP (50%)Engineering
(Hourly)
Housing Cash in Lieu
Parks Review Zoning (50%)Stormwater
Utility Review CMP (50%)City Use Tax
Other Electrical County Use Tax
Plumbing GIS
Mechanical Sanitation
SUBMITTAL FEES ISSUANCE FEES
__________________PLANS LOCATION
_________Lot Area
_________Zone District
_________Deed Restricted
_________Census Code
_________# of Dwellings
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets
____Bathtub
____Lavatory (Wash Basin)
____Shower
____Kitchen Sink (+Disposal)
____Dishwasher
____Laundry Bar, Utility Sink
____Clothes Washer
____Floor Sink
____Floor Drain
____Shower
____Water Heater (Pan Req)
____# Gas Outlets
____Water Treatment
____Other_________
Fixture Counts
____Forced Air/Gravity Systems
____Wall, Suspended, or Unit Heaters
____Gas Log
____Gas Appliancew
____Appliance Vents
____Heat, Refrig, Cooling, or
Absorption Unit
____Boilers (includes vent)
____Air Handling Unit
____Cooling Systems
____Ventilation Fans
____Range Hood
____# of Gas System Outlets
____Snowmelt System Sq Ft_________
Equipment Checklist
Zoning
HPC
Building
Fire
Engineering
CMP
Utilities
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
ReviewRequired Date ApprovedReviewingDepartmentReviewerInitials
Call Assessor (970-920-5160) to verify
NEW SQ FT
Details Term Definitions
Project Valuation: Cost of project as defined in Valuation Affadavit.
Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.
Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.
Lot Size: Total surveyed square footage of property.
Sq Ft of Landscape Work: Square footage of disturbed exterior area.
New Sq Ft: Total added square footage for additions to net livable or net leasble space.
Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.DO YOU LIKE DOGS?
August 2017
0224.2017.ARBK
975 Chatfield Road 2735 0240 2001
7 West Aspen Subdivision
Remodel of interior spaces. New Kitchen bathroom cabinets/countertops Reuse Appliances.
New flooring/carpet/tile. Remove some walls. Add 3 new windows. Replace existing windows same size
John Walker 970-379-7598 JWalk22401@aol.com
KRB Real Estate Assoc LLC 215-351-1500 Barry Bernsten <BBRRI@aol.com>
1.5 million 61
n 8
n
n 411
0
4876
5294 (fire area)
16827 110
0
594.38
0
122
02
20432741040
x JP 12/19
18866.25 29025 x NT 1/12/18
4353.75 NT 1/12/18
487.50
x
x TK 9/26
2441.74
504.81 487.50
2441.74 14700
3750
DR 12/19x
434
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER
___________________________________ _____________________ ________________________Name Phone E-mail
FOR PLAN REVIEW QUESTIONS
___________________________________ _____________________ ________________________Name Phone E-mail
FOR INSPECTION QUESTIONS
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER’S AUTHORIZED AGENT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
APPLICATION BEST CONTACT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
ARCHITECT OR DESIGNER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
CIVIL ENGINEER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
STRUCTUAL ENGINEER OF RECORD
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
________________________________________________________ _____________________ContractorSignature Date
IE^WCdIKE^͗ dŚe 'eneral ContraĐtor ŵust sĐŚeĚule insƉeĐtions online͘
Wlease visit ǁǁǁ͘asƉenƉitŬin͘ĐoŵͬeƉartŵentsͬCoŵŵunity-eveloƉŵent-&orŵsͬ to Ěo so͘
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
GENERAL CONTRACTOR
Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit.
(CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
975 Chatfield Rd Aspen
Soraya Gallego Matter Interiors 847-712-0888 soraya@matterinteriors.com
John Walker 970-379-7598 JWalk22401@aol.comS
KRB Real Estate Assoc LLC 215-351-1500 215-917-1700
309 C S 2ND St Philadelphia PA 19106
Barry Bernsten <BBRRI@aol.com>
Barru Bernsten 215-351-1500 215-917-1700
309 C S 2ND ST Philadelphia PA 19106
Barry Bernsten <BBRRI@aol.com>
John Walker 970-379-7598 970-379-7598
PO BOX 10255 Aspen CO 81612
JWalk22401@aol.com
Matter Interiors 970-379-5401 970-379-5401
PO BOX 1045 Aspen CO 81612
noelle@matterinteriors.com
N/A
Albright Associates 970-927-4363 (970) 379-3244
402 Park Ave Unit A Basalt Co 81621
jack@albright-associates.com
John Walker Builder 970-379-7598 970-379-7598
PO BOX 10255 Aspen CO 81612
JWalk22401@aol.com
DAM 1 /17/18
ALL OUTDOOR LIGHTING
MUST COMPLY WITH
THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150
12/06/2018