HomeMy WebLinkAboutFile Documents.614 North St.0248.2017 (118).ARBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
ASPEN LINE GRADE VERIFICATION FORMASPEN LINE GRADE VERIFICATION FORM
Webpage: http://www.aspenpitkin.com/pdfs/depts/41/linegradeverificationform.pdf Rev. 04-08
Verification of Building Location by Building Contractor
For Building and Permit Information, please refer to our website at:
http://www.aspenpitkin.com/depts/41/
Exemption
A City verification of building location is not needed when the project creates less the 200 square feet of new floor area.
PART A: Complete and Submit as part of the Building Permit Application
o Building / Job Address or Location: _____________________________________________
o Your Name (Person Completing Part A): ____________________________________________
o Your Company: ________________________________________________________________
o Plans must show horizontal dimensions that ‘tie’ the building to the property boundary.
Are building ties shown? (circle one) ‘Yes’ ‘No’
o An elevation benchmark needs to be established on the site by a licensed surveyor and shown on the plans. What is the
elevation of this benchmark? _________________________________
o If the garage is located within 10 feet of the roadway or sidewalk, provide spot elevation on the on the roadway or sidewalk.
Is a spot elevation shown? ‘Yes’ ‘No’ ‘N/A’
o Provide the equation comparing site (surveyed) elevation to structure/ architectural plan elevation:
(i.e., 100’ first floor elev = 7962.50’) _______________________________
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PART B: Complete prior to first Foundation Inspection, by a licensed surveyor or an individual prequalified by the City
o Do field measured building ties to property match building ties shown on the plan? (circle one): ‘Yes’ ‘No’
o Surveyor needs to confirm that one spot on the top of the foundation wall is at the same elevation shown on the approved
building plans.
o What is the field measured elevation of top of foundation wall relative to the site bench mark? ____________
o According to the building plans, what was the design elevation for the same place on the foundation wall?
______________________________
o Was the elevation of the building adjusted in field? (circle one): ‘Yes’ ‘No’
o If yes, why? ________________________________________________
The undersigned qualified individual certifies that the information in Part B is accurate -
Signature: Date: _
Printed Name: Contact ph. # : ____________________
Company: ______________________________________________________________
614 W NORTH ST
RYAN LEE
FORUM PHI
7891.05
7891'-9"= 100'-0"
10/11/17
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
BUILDING CODE INFORMATION
2015 IRC
Existing?NFPA 13 NFPA 13 R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# 3/4 Baths ______ # 1/2 Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
NFPA 13 D
RESCheck UA Alternative
Yes No
One Family Two Family
Townhouse
Reviwed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
2nd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
3rd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
YesNo
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
__________________________
__________________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing + New)
A__BB (A <50)F__H__I __
E R__S__
UM IRC
IBC
2015 IBC
(As Adopted and Amended)
YesNo Required?YesNo Type
August 2017
2 1
1
7 1
5 1
1
2
Bedroom 1(001), Bath 1(002), Bedroom 2(003), Bath 2(004), Media Room(005), Bedroom 4(006), Bath 3(007),
Bedroom 3(008), Laundry(009), Mechanical/Storage(010)
Entry/Mudroom(101), Powder(102), Dining Room(103), Kitchen(104), Garage(105), Family Room(106),
Living Room(107)
Master Bedroom(201), Sitting Room(202), Master Bath(203), Master Closet 1(204), Master Closet 2(205),
Bedroom 5(206), Bath 4(207), Bedroom 6(208), Bath 5(209)
JH 4/9/18
10/11/17
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER
___________________________________ _____________________ ________________________Name Phone E-mail
FOR PLAN REVIEW QUESTIONS
___________________________________ _____________________ ________________________Name Phone E-mail
FOR INSPECTION QUESTIONS
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER’S AUTHORIZED AGENT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
APPLICATION BEST CONTACT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
ARCHITECT OR DESIGNER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
CIVIL ENGINEER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
STRUCTUAL ENGINEER OF RECORD
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
________________________________________________________ _____________________ContractorSignature Date
INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so.
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
GENERAL CONTRACTOR
Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit.
(CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
Ryan Lee 405-314-5104 rlee@forumphi.com
Nick Hayman 202-256-3308
4725 Dexter St. NW Washington DC 20007
Nhayman@winsightmedia.com
Ryan Lee 405-314-5104
715 W. Main St. Ste 204 Aspen CO 81611
rlee@forumphi.com
Steev Wilson 970-279-4109
715 W. Main St. Ste 204 Aspen CO 81611
swilson@forumphi.com
Richard Goulding - Roaring Fork Engineers 970-340-4130
592 Highway 133 Carbondale CO 81623
richardg@rfeng.biz
Steve Edmiston - Evolve Structural 970-510-0773
1040 Main Street Carbondale CO 81623
steve@evolvestruct.com
Andy Mishmash - AM2 Construction 970-309-7040
PO Box 2140 Basalt CO 81621
andy.am2@gmail.com
10/2/2017
10/11/17
04/16/2018
justinh
SPECIAL INSPECTION AND TESTING AGREEMENT
To permit applicants of project requiring special inspection and\or testing per Section 1704 of the
International Building Code (IBC).
Project Address: __________________________________ Permit Number:______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the
owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule, including the required acknowledgments. A pre-construction conference with the parties
involved may be required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the
projects for which they provide special inspections. Special inspectors shall be approved by the building
department prior to performing any duties. Special inspectors shall submit their qualifications and are
subject to personal interviews for pre-qualification. Special inspectors shall display approved
identification, as stipulated by the building official, when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code
Section 1704. The following conditions are also applicable:
A.Duties and Responsibilities of the Special Inspector
1.Signify presence at job site. Special inspectors should notify contractor personnel of
their presence and responsibilities at the job site. If required by the building official, they
shall sign in on the appropriate form posted with the building permit.
2.Observe assigned work. The special inspector shall observe assigned work for
conformance with the building department approved (stamped) design drawings,
specifications, and applicable workmanship provisions of the International Building
Code. Architect\engineer-reviewed shop drawings may be used only as an aid to
inspection.
For continuous special-inspection, the special inspector shall be on site at all times
observing the work requiring special inspection. Periodic inspections, if any, must have
prior approval based on a separate written plan reviewed and approved by the building
department and the engineer or architect of record.
3.Report nonconforming items. The special inspector shall bring nonconforming items to
the immediate attention of the contractor and note all such items in the daily report. If
any item is not resolved in a timely manner or is about to be incorporated in the work, the
special inspector shall immediately notify the building department by telephone or in
person, notify the engineer or architect, and post a discrepancy notice.
4.Provide timely reports. The special inspector shall complete written inspection reports
for each inspection visit and provide the reports on a timely basis determined by the
building official. The special inspector or inspection agency shall furnish these reports
directly to the building official, engineer or architect of record, and others as designated.
[IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be
submitted weekly at the option of the building official. These reports should include:
a.Description of daily inspections and tests made with applicable locations,
b.Listing of nonconforming items,
c.Report on how nonconforming items were resolved or unresolved as
applicable,
d.Itemized changes authorized by the architect, engineer, and building official if
not included in nonconforming items.
1
614 W NORTH ST
5.Provide Final Inspection Report. The special inspector shall submit a written final
report documenting required special inspections and correction of any discrepancies
noted in the inspections prior to the final building inspection.
B.Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the
owner is responsible for employing special-inspection services. The special inspector\agency shall
not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In
case of an owner\contractor, the special inspector\agency shall be employed as specified by the
building official.
C.Engineer or Architect of Record Responsibilities
1.Prepare special inspection program. The engineer or architect of record shall list the
items for which special inspection is required; and shall indicate any items for which the
IBC or the building official approves periodic inspection and the frequency of such
inspections.
2.Respond to field discrepancies. The engineer or architect of record shall respond to
uncorrected field discrepancies in design, material, or workmanship observed by the
special inspector.
3.Review shop drawings and submit design changes. The engineer or architect of record
shall acknowledge and review for conformance with the construction drawings those
shop drawings that may detail structural information, shall submit to the building official
and to the special-inspection agency written documentation of any verbally authorized
deviations from the approved construction documents, and shall submit revised
documents for building official approval as required.
D.Contractor Responsibilities
1.Notify the special inspector. The contractor is responsible for notifying the special
inspector or agency regarding individual inspections for items listed on the attached
schedule and as noted on the building department approved plans. Adequate notice shall
be provided so the special inspector has time to become familiar with the project.
2.Provide access to approved plans. The contractor is responsible for providing the
special inspector access to approved plans.
3.Retain special inspection records. Upon request, the contractor is also responsible for
retaining, at the job site, all special inspection records completed by the special inspector.
E.Inspection of Fabricators
1.Fabrication of structural assemblies and members. Where fabrication of structural
load-bearing members and assemblies is being performed on the premises of a
fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated
items.
2.Fabrication and implementation procedures. The special inspector shall verify that
the fabricator maintains detailed fabrication and quality control procedures that provide a
basis for inspection control of the workmanship and the fabricator’s ability to conform to
approved construction documents and reference standards. The special inspector shall
review the procedures for completeness and adequacy relative to code requirements for
fabricator’s scope of work.
F.Approved Fabricator Responsibilities
1.Fabrication exempt inspections. Special inspections are not required where work is
done on the premise of a fabricator registered and approved to perform such work
without special inspection.
2
JH Justin Hahn 4/16/18
614 W North St 0248.2017.ARBK
REFERENCES FROM 2015 IRC
CV/A = crawl space ventilation required, sec. R408.1 Access required, R408.4
EE = emergency escape required sec R310.1
EU = enclosed usable space under stairs shall be ½” Gyp, sec R302.7
G/D = garage/dwelling separation, sec R302.5 and R302.6
STC = Sound transmission class not less than 45 at dwelling separations, app
K
RV = roof and rafter ventilation required, R806.1
A = attic access 22” x 30”, 30” headroom above, R807.1
SA = smoke alarms installed to NFPA 72 requirements, sec R314
CO = carbon monoxide detector per City Ordinance 41 series 2008
SG = safety glazing required, sec R308.4
GR = guardrails, 36” min ht, 4” max opening; req at 30” drop any point w/in 36”
horizontally, sec R312
WFP = window fall protection- operable window <24” AFF & >72” above
grade: use opening control device listed to ASTM F2090, sec R312.2
HR = handrails 34”-38” ht, sec R311.7.8
SI = stairway illumination, sec R303.7
PD = protect against decay, sec R317
REFERENCES FROM 2015 IMC
V = bathroom and balanced whole house mechanical ventilation req.
Ordinance 40, 2016
DE = clothes dryer exhaust, sec 504. Makeup air req’d if over 200 CFM
AS = access and service space for maintenance req’d, sec 306
MA = make up air required if hood exhausts greater than 400 CFM, sec 505.2
ET = exhausts terminate 3’ from prop line and openings, 10’ from intakes,
501.3.1
IT= intake openings 10’ from lot line & contaminant sources (vents, streets),
401.4
D = fasten and seal all ductwork per 603.9
REFERENCES FROM 2015 IFGC
DV = direct vent req’d, sec 303.3
CA = combustion air not taken from bedrooms, bathrooms or
storage sec 303.3
OD = outdoor appliances must be listed for outdoor use, sec 303.6
REFERENCES FROM 2015 IECC
F = new or replacement glazing shall not exceed 0.28 U-Value, NFRC label
required, Ordinance 40, 2016
L = 75% of lamps in permanently installed lights must be high efficacy, sec
R404.1
SE = Continuous air barrier required; all exterior joints, cracks, and holes to be
caulked, gasketed, sealed, table R402.4.1.1
REFERENCES FROM 2014 NEC
EP = electric panel 'happy space' 30"x36"x78", not in storage, sec 110.26
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
05/04/2018
ALL OUTDOOR LIGHTING
MUST COMPLY WITH
THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150
The following criteria must also
be met with construction:
Ø A construction fence must be
erected along the entire dripline
of all trees on site and any tree
canopy from neighboring
property. This will serve as the
tree protection zone (TPZ). This
fence is to be constructed in
such a manner that the area
inside the dripline is protected.
AN INSPECTION OF THIS
FENCE MUST BE
PERFORMED BEFORE ANY
CONSTRUCTION OR
DEMOLITION ACTIVITIES
BEGIN. PLEASE ARRANGE
THIS INSPECTION WITH BEN
CARLSEN AT 429-2034.
Ø No materials may be stored in
the TPZ, including but not limited
to, construction backfill,
construction traffic, or any other
construction materials.
Ø No excavation, grading or
trenching may occur within the
TPZ without the consent of the
City of Aspen Forester or his
designee.
Ø No parking of vehicles or
equipment may occur in the TPZ.
Ø No dumping of any waste
products may occur in the TPZ.
Ø Any roots cut during
excavation shall be pruned with
sharp loppers/pruners back to
the soil line. The roots will further
be protected by burlap draped
over the side of the excavation
covering the exposed roots. This
burlap shall be kept moist until
the excavation is backfilled.
Ø Pruning to provide clearance
for construction activities shall
only be done under the direction
of an arborist.
Ø Site inspections shall be
performed on a weekly basis, to
ensure the above listed
conditions are met.
Ø Any unapproved
improvements or activities
outside of those approved within
this permit will be subject to
mitigation in the form of
restoration.
Ø This permit must be posted on
site during the construction
process.
City of Aspen - Tree Planting Specifications
Trunk caliper shallmeet ANSI Z60 currentedition for root ball size.
Modified soil. Depthvaries. (See soil preparationplan).
Finished grade.
Bottom of root ball rests on
existing or recompactedsoil.
Central leader. (See crownobservations detail).
SECTION VIEW
Remove 1/3 of burlap and basket wire.
Round-topped soil berm 4" high x 8" wideabove root ball surface
shall be constructed around
the root ball. Berm shallbegin at root ball periphery.
Top of root ball shall be flush withfinished grade.
Prior to mulching, lightly tamp soilaround the root ball in 6" lifts tobrace tree. Do not over compact.When the planting hole has beenbackfilled, pour water around the
root ball to settle the soil.
4" layer of mulch.No more than 1" of mulch ontop of root ball. (Seespecifications for mulch).
Notes:1- Trees shall be of qualityprescribed in crownobservations and rootobservations details and
specifications.
2- See specifications forfurther requirements related tothis detail.
Existing soil.
TP-1
s >5
1/ iT\ 1//0/1>/1'/1';;; /1'/1 \ */ ’ \ */ \ */ \ */ \ */ \"-'i .-..t ■ 1 'i.i-i 1 i- -i-- V »
I.v '/ O'/' \ '/ ' '/ O'/' O/^ i'l —I r i'l [v-
I yqTTE3TTr=rrfSSvSOI ItFFtTrTT
ALJ
The City of Aspen
City of Aspen - Tree Protection Zone
Crown drip line or other limit of Tree Protection area. Seetree preservation plan for fence alignment.
4'-
0
"
Maintain existinggrade with the treeprotection fenceunless otherwiseindicated on theplans.
2" x 6' steel postsor approved equal.
Tree Protectionfence: High densitypolyethylene fencingwith 3.5" x 1.5"openings; Color-orange. Steel postsinstalled at 8' o.c.
5" thick
layer of mulch.
Notes:
1- See specifications for additional tree
protection requirements.
2- If there is no existing irrigation, seespecifications for watering requirements.
3- No pruning shall be performed exceptby approved arborist.
4- No equipment shall operate inside theprotective fencing including during fenceinstallation and removal.
5- See site preparation plan for anymodifications with the Tree Protectionarea.
SECTION VIEW
KEEP OUTTREEPROTECTIONAREA
8.5" x 11"signlaminated inplastic spacedevery 50'along thefence.
URBAN TREE FOUNDATION OPEN SOURCE FREE TO USETPZ-1
Tree protection fencing is required at the driplines of all trees shown.
There is NO activity allowed within this fenced area, including, but notlimited to: digging, storage of material, equipment, machinery, foot orvehicle traffic.
Please contact the City Forester or his designee at 920-5120 for aninspection of this fencing Prior to any activity.
If the need arises to perform any activity in the tree protection area, pleasecontact the City Forester and you will be given specific instructions as tohow to proceed to minimize impacts to the tree root zone.
Approved by Parks Department
davidr 05/10/2018
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
MASTER PERMIT: ______________________DATE:___________
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
__________________________________________________________________________________
____________________________________________________________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
PERMIT NUMBER: __________________________
CommericalMulti-FamilySingle Family
Use of Building Class of WorkNewAdditionAlterationRepair
________YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced.
__________________
_________________ __________________
____________________ ________________
_________________
__________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
SQ FT OF LAND-SCAPE WORK
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
Mixed-Use IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOTDESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Energy Code REMP School Ded.
Zoning (50%)Plan Check
(Hourly)
TDM Impact
Engineering Review Zoning (Hourly)Ped. Amenity
CMP (50%)Engineering (Hourly)Housing Cash in Lieu
Parks Review Zoning (50%)Stormwater
Utility Review CMP (50%)City Use Tax
Other Electrical County Use Tax
Plumbing GIS
Mechanical Sanitation
SUBMITTAL FEES ISSUANCE FEES
__________________PLANS LOCATION
_________Lot Area
_________Zone District
_________Deed Restricted
_________Census Code
_________# of Dwellings
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Shower____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts
____Forced Air/Gravity Systems____Wall, Suspended, or Unit Heaters____Gas Log ____Gas Appliancew____Appliance Vents____Heat, Refrig, Cooling, or
Absorption Unit____Boilers (includes vent) ____Air Handling Unit ____Cooling Systems____Ventilation Fans____Range Hood____# of Gas System Outlets____Snowmelt System Sq Ft_________
Equipment Checklist
Zoning
HPC
Building
Fire
Engineering
CMP
Utilities
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
ReviewRequired Date ApprovedReviewingDepartmentReviewerInitials
Call Assessor (970-920-5160) to verify
NEW SQ FT
Details Term DefinitionsProject Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Sq Ft of Landscape Work: Square footage of disturbed exterior area.New Sq Ft: Total added square footage for additions to net livable or net leasble space.Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.DO YOU LIKE DOGS?
August 2017
0248.2017.ARBK 10/11/17
614 W North St 273512112006
14 & 15 98 Hallam Addition
Interior remodel to an existing structure. Basement level to be increased by 600 sq ft & entry to be extended towards West North St.
The facade will utilize a custom curtain wall system and the existing stairwell will be reconfigured into a u-shaped scissor stair.
Ryan Lee 405-314-5104 Rlee@forumphi.com
Nick Hayman 202-256-3308 Nhayman@winsightmedia.com
1,300,000.00 7 19621
0
3,821.50 Existing Gross
4,065 sq ft 11
4,696 Proposed Gross
3
2114
23 130
X JPo 5/4/18
16916.25 26025 JH 4/9/18
3903.75
2784.98 JF 5/16/18
tk 1/05/18
3216.19
1922.26 x sw 5/11/18
121.95 2784.98
1922.26 12600 x pm 4/13
3250
500
12658.61
434
10/11/17
X Dr 5/10/18
DAM 5/16/18