Loading...
HomeMy WebLinkAboutFile Documents.209 E Bleeker St.0002-2021-BCHO (7)The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 0002-2021-BCHO WEST END HOUSE LLC 209 E BLEEKER ST 273707320002 2 06/16/2021 bonniem SEE NOTES #1 PLANS External Energy Use Approved RREMP CREMP PERMIT #:0002-2021-BCHO DATE:__6/16/21 SNOWMELT:____1500 sf_(total on site)_______ POOL: ___0________________________ SPA: ___0_________________________ OFFSET:____Solar PV + GSHP____________ REMP SHEET: _A1.3____________________ REVIEWED BY: ____Bonnie M__________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: __95%__________