HomeMy WebLinkAboutFile Documents.128 E Main St.0191.2018 (5).ARBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
0191.2018.ARBK
BTR Sardy LLC
128 E Main
2735 1243 8005
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalDƵůƟͲ&ĂŵŝůLJ^ŝŶŐůĞ&ĂŵŝůLJ
Use of Building Class of Work
NewĚĚŝƟŽŶůƚĞƌĂƟŽŶRepair
________
YesNo
Will there be ĂŶLJƌŽŽĨͬǁĂůůƉĞŶĞƚƌĂƟŽŶƐ͍
NOTICE: This permit becomes null and
ǀŽŝĚŝĨǁŽƌŬŽƌĐŽŶƐƚƌƵĐƟŽŶĂƵƚŚŽƌŝnjĞĚ
ŝƐŶŽƚĐŽŵŵĞŶĐĞĚǁŝƚŚŝŶϭϴϬĚĂLJƐ͕Žƌ
ŝĨĐŽŶƐƚƌƵĐƟŽŶŽƌǁŽƌŬŝƐƐƵƐƉĞŶĚĞĚŽƌ
ĂďĂŶĚŽŶĞĚĨŽƌĂƉĞƌŝŽĚŽĨϭϴϬĚĂLJƐĂƚ
ĂŶLJƟŵĞĂŌĞƌǁŽƌŬŝƐĐŽŵŵĞŶĐĞĚ͘
__________________
_________________
__________________
____________________
________________
_________________
__________
______________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
DISTURBEDEXTERIOR AREA
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
DŝdžĞĚͲhƐĞ
IFFR
Tenant FinishĞŵŽůŝƟŽŶChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Engineering Zoning (50%)School Ded.
Zoning (50%)CMP (50%)TDM Impact
ŶĞƌŐLJŽĚĞREMP WĞĚ͘ŵĞŶŝƚLJ
CMP (50%)Plan Check
;,ŽƵƌůLJͿ Housing Cash in Lieu
Parks Review Zoning
;,ŽƵƌůLJͿ Stormwater
hƟůŝƚLJZĞǀŝĞǁ Engineering
;,ŽƵƌůLJͿ ŝƚLJhƐĞdĂdž
GIS ŽƵŶƚLJhƐĞdĂdž
SUBMITTAL FEES ISSUANCE FEES
_________Lot Area _________Deed Restricted
ͺͺͺͺͺͺͺͺͺĞŶƐƵƐŽĚĞͺͺͺͺͺͺͺͺͺηŽĨǁĞůůŝŶŐƐ ͺͺͺͺͺͺͺͺͺWůĂŶƐ>ŽĐĂƟŽŶ
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets
____Bathtub
ͺͺͺͺ>ĂǀĂƚŽƌLJ;tĂƐŚĂƐŝŶͿ
____Shower
____Kitchen Sink (+Disposal)
____Dishwasher
ͺͺͺͺ>ĂƵŶĚƌLJĂƌ͕hƟůŝƚLJ^ŝŶŬ
____Clothes Washer
____Floor Sink
____Floor Drain
____Water Heater (Pan Req)
____# Gas Outlets
____Water Treatment
____Other_________
Fixture Counts
____&ŽƌĐĞĚŝƌͬ'ƌĂǀŝƚLJ^LJƐƚĞŵƐ
____Wall, Suspended, or Unit Heaters
____Gas Log
____Gas Appliancew
____Appliance Vents
____Heat, Refrig, Cooling, or
ďƐŽƌƉƟŽŶhŶŝƚ
____Boilers (includes vent)
____Air Handling Unit
ͺͺͺͺŽŽůŝŶŐ^LJƐƚĞŵƐ
ͺͺͺͺsĞŶƟůĂƟŽŶ&ĂŶƐ
____Range Hood
ͺͺͺͺηŽĨ'ĂƐ^LJƐƚĞŵKƵƚůĞƚƐ
____^ŶŽǁŵĞůƚ^LJƐƚĞŵ^Ƌ&ƚͺͺͺͺͺͺͺͺͺ
Equipment Checklist
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
^ĂŶŝƚĂƟŽŶ
Env. Health
Parks
Landscape
ĸĐŝĞŶĐLJ
Approved
To Issue
Issuance
Date ApprovedReviewingDepartment
Re-viewerSign-Kī
NEW SQ FT
WƌŽũĞĐƚsĂůƵĂƟŽŶ͗ŽƐƚŽĨƉƌŽũĞĐƚĂƐĚĞĮŶĞĚŝŶsĂůƵĂƟŽŶīĂĚĂǀŝƚ͘
^Ƌ&ƚŽĨtŽƌŬƌĞĂ͗dŽƚĂůƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨĂƌĞĂƵŶĚĞƌŐŽŝŶŐĐŚĂŶŐĞŽƌƌĞĐŽŶĮŐƵƌĂƟŽŶ͘
hŶŝƚ^Ƌ&ƚ͗'ƌŽƐƐ^ƋƵĂƌĞ&ŽŽƚĂŐĞ͕ŶŽƚ&Z͕ŽĨƉĞƌŵŝƩĞĚƵŶŝƚ͘
>Žƚ^ŝnjĞ͗dŽƚĂůƐƵƌǀĞLJĞĚƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨƉƌŽƉĞƌƚLJ͘
ŝƐƚƵƌďĞĚdžƚĞƌŝŽƌƌĞĂ͗^ƋƵĂƌĞĨŽŽƚĂŐĞŽĨůŽƚĂīĞĐƚĞĚďLJƉĞƌŵŝƚĂƉƉůŝĐĂƟŽŶ͘
EĞǁ^Ƌ&ƚ͗dŽƚĂůĂĚĚĞĚƐƋƵĂƌĞĨŽŽƚĂŐĞĨŽƌĂĚĚŝƟŽŶƐƚŽŶĞƚůŝǀĂďůĞŽƌŶĞƚůĞĂƐďůĞƐƉĂĐĞ͘
^Ƌ&ƚŽĨZŽŽŵƐǁŝƚŚhƟůŝƚLJtŽƌŬ͗Total square footage, not FAR, of all rooms with plumbing work.
KzKh>/<K'^͍
December 2017
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
ZONE DISTRICT
NeedsReview
DE
F
I
N
I
T
I
O
N
S
6/28/2018 0325.2017.ARBK
128 E Main Street 2735-124-38-005
P&S 66 City and Townsite of Aspen
BTR Sardy LLC sardyhouse@gmail.com
Jamie McLeod 970-544-0130 jamie@brewstermcleod.com
Structural repair of historic roof and front porch. Historic roof will remain intact keeping existing framing and skip sheathing, in-fill framing and tube still will be added to support the roof.
New interior columns to the foundation will be added. No exterior changes to the roof. One column at the historic porch will be replaced due to significant rot damage. A new header will be installed as well.
$300,000.00
900 SF
x
MU
07/12/2018
0191.2018.ARBK
25
x jb 7/11
x as 7/11
x
x
x
ms
AS 7/13/18
DAM 7/13/18
DAM 7/13/18
DAM 7/13/18
SPECIAL INSPECTION AND TESTING AGREEMENT
To permit applicants of project requiring special inspection and\or testing per Section 1704 of the
International Building Code (IBC).
Project Address: __________________________________ Permit Number:______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the
owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building
department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved
identification, as stipulated by the building official, when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code
Section 1704. The following conditions are also applicable:
A. Duties and Responsibilities of the Special Inspector
1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they
shall sign in on the appropriate form posted with the building permit.
Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings,
specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to
inspection.
For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have
prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record.
3. Report nonconforming items. The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If
any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in
person, notify the engineer or architect, and post a discrepancy notice.
Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the
building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated.
[IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include:
a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items,
c. Report on how nonconforming items were resolved or unresolved as applicable,
d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items.
2.
4.
1
128 EAST MAIN 0191.2018.ARBK
5. Provide Final Inspection Report. The special inspector shall submit a written final
report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection.
B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the
owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In
case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official.
C. Engineer or Architect of Record Responsibilities
1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the
IBC or the building official approves periodic inspection and the frequency of such inspections.
Respond to field discrepancies. The engineer or architect of record shall respond to
uncorrected field discrepancies in design, material, or workmanship observed by the special inspector.
Review shop drawings and submit design changes. The engineer or architect of record
shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official
and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents, and shall submit revised
documents for building official approval as required.
2.
3.
D. Contractor Responsibilities
1. Notify the special inspector. The contractor is responsible for notifying the special inspector or agency regarding individual inspections for items listed on the attached
schedule and as noted on the building department approved plans. Adequate notice shall be provided so the special inspector has time to become familiar with the project.
Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans.
Retain special inspection records. Upon request, the contractor is also responsible for
retaining, at the job site, all special inspection records completed by the special inspector.
2.
3.
E. Inspection of Fabricators
1. Fabrication of structural assemblies and members. Where fabrication of structural
load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated
items.
Fabrication and implementation procedures. The special inspector shall verify that
the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to
approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for
fabricator’s scope of work.
2.
F. Approved Fabricator Responsibilities
1. Fabrication exempt inspections. Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work
without special inspection.
2
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
07/13/2018
denism
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
07/12/2018