Loading...
HomeMy WebLinkAboutFile Documents.42 Mining Stock Pkwy.0001.2018 (20).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK RESIDENTIAL REFERENCES FROM 2015 IBC CV/CS = crawl space ventilation sec. 1203.4. 18” x 24” access required 1209.1 EE = emergency escape required sec 1030 EU = enclosed usable space under stairs shall be 1-hr construction or stair enclosure rating. No access from stair enclosure. ½” gypsum permitted for stairs inside a single dwelling unit. 1011.7.3. RV = roof and rafter ventilation required 1203.2 A = Attic Access 20” x 30” 1209.2 SA = smoke alarm (NFPA 72) required sec 907.2.11 CO = carbon monoxide detector req. per Aspen Municipal Code 8.15 SG = safety glazing required sec 2406 V = mechanical ventilation required sec 1203.1 & IMC 403 (bath fans and whole house ventilation) GR = guards, 42” min ht, 4” max opening. Guards within dwelling unit 36” min ht sec 1015 HR = handrails 34”-38” ht sec 1014 DS = Draft stopping / fire blocking 718 RD = Roof drainage 1503.4 STC = Sound transmission class not less than 50 at dwelling separations, sec 1207 SI = Stairway Illumination 1205.4 PD = protect against decay, sec 2304.12 REFERENCES FROM 2015 IMC DE = clothes dryer exhaust, sec 504. Makeup air req’d if over 200 CFM AS = access and service space for maintenance req’d, sec 306 MA = make up air required if hood exhausts greater than 400 CFM, sec 505.2 ET = exhausts terminate 3’ from prop line and openings, 10’ from intakes, 501.3.1 IT= intake openings 10’ from lot line & contaminant sources (vents, streets), 401.4 D = fasten and seal all ductwork per 603.9 REFERENCES FROM 2015 IFGC DV = direct vent req’d, sec 303.3 CA = combustion air not taken from bedrooms, bathrooms or storage sec 303.3 OD = outdoor appliances must be listed for outdoor use, sec 303.6 REFERENCES FROM 2015 IECC F = new or replacement fenestration shall not exceed 0.28 U-factor, NFRC label required, Ordinance 40, 2016 L = 75% of lamps in permanently installed lights must be high efficacy, sec R404.1 SE = Continuous air barrier required; all exterior joints, cracks, and holes to be caulked, gasketed, sealed, table R402.4.1.1 REFERENCES FROM 2014 NEC EP = electric panel 'happy space' 30"x36"x78", not in storage, sec 110.26 SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 FIRE SPRINKLERS REQUIRED 03/22/2018 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION MASTER PERMIT: ______________________DATE:___________ CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ __________________________________________________________________________________ ____________________________________________________________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ PERMIT NUMBER: __________________________ CommericalMulti-FamilySingle Family Use of Building Class of WorkNewAdditionAlterationRepair ________YesNo Will there be any roof/wall penetrations? NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. __________________ _________________ __________________ ____________________ ________________ _________________ __________ PROJECTVALUATION SQ FT OF WORK AREA UNIT SQ FT SQ FT OF LAND-SCAPE WORK SQ FT OF ROOMS WITH UTILITY WORK LOT SIZE(SQ FT) PROJECT DETAILS Mixed-Use IFFRTenant FinishDemolitionChange Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOTDESCRIPTION OF WORK IN DETAIL FOR CITY USE ONLY Plan Check Permit Fee Parks Impact Energy Code REMP School Ded. Zoning (50%)Plan Check (Hourly) TDM Impact Engineering Review Zoning (Hourly)Ped. Amenity CMP (50%)Engineering (Hourly)Housing Cash in Lieu Parks Review Zoning (50%)Stormwater Utility Review CMP (50%)City Use Tax Other Electrical County Use Tax Plumbing GIS Mechanical Sanitation SUBMITTAL FEES ISSUANCE FEES __________________PLANS LOCATION _________Lot Area _________Zone District _________Deed Restricted _________Census Code _________# of Dwellings APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Shower____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________ Fixture Counts ____Forced Air/Gravity Systems____Wall, Suspended, or Unit Heaters____Gas Log ____Gas Appliancew____Appliance Vents____Heat, Refrig, Cooling, or Absorption Unit____Boilers (includes vent) ____Air Handling Unit ____Cooling Systems____Ventilation Fans____Range Hood____# of Gas System Outlets____Snowmelt System Sq Ft_________ Equipment Checklist Zoning HPC Building Fire Engineering CMP Utilities Water Stormwater Sanitation Env. Health Parks Landscape Efficiency Approved To Issue Issuance ReviewRequired Date ApprovedReviewingDepartmentReviewerInitials Call Assessor (970-920-5160) to verify NEW SQ FT Details Term DefinitionsProject Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Sq Ft of Landscape Work: Square footage of disturbed exterior area.New Sq Ft: Total added square footage for additions to net livable or net leasble space.Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.DO YOU LIKE DOGS? August 2017 42 Mining Stock Parkway 107 273502312012 Expansion/Addition to an existing storage space, replacement of roof and new supporting walls, new windows and interior finish. Bob McDonough 970.379.9674 mcdonoughconstruction@comcast.net Ian Metcalf 970.319.9525 mettie07@gmail.com 27500.00 000000 79 1774 000 1853 N/A 000000 x cs 3.22.18 0 0 48.19 N/A 0 AH/PD yes 01/08/2018 TF 1/25/18 TF 1/25/18 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP OWNER ___________________________________ _____________________ ________________________Name Phone E-mail FOR PLAN REVIEW QUESTIONS ___________________________________ _____________________ ________________________Name Phone E-mail FOR INSPECTION QUESTIONS ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP OWNER’S AUTHORIZED AGENT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP APPLICATION BEST CONTACT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP ARCHITECT OR DESIGNER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP CIVIL ENGINEER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP STRUCTUAL ENGINEER OF RECORD I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. ________________________________________________________ _____________________ContractorSignature Date INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so. ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP GENERAL CONTRACTOR Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit. (CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file ADDRESS: ____________________________PERMIT NUMBER: _______________________________ August 2017 Juan Lagarrigue 970.987.3216 jlagarrigue@manchester-architects.com Bob McDonough 970.379.9674 mcdonoughconstruction@comcast.net Ian Metcalf 970.319.9525 42 Mining Stock Pkwy #107 Aspen CO 81611 mettie07@gmail.com Manchester Architects - Juan Lagarrigue PM 970.923.4411 x15 970.987.3216 PO Box 6573 Snowmass Village CO 81615 jlagarrigue@manchester-architects.com Hein Brutsaert PE 970.300.1003 133 Prospector Rd. Unit 4102R Aspen CO 81611 Bob Mc Donough 970.379.9674 PO Box 11689 Aspen CO 81612 mcdonoughconstruction@comcast.net 2017.12.16 01/08/2018 01/08/2018 01/08/2018 01/08/2018 01/08/2018 DAM 3/26/18 0001.2018.ARBK METCALF 42 MINIMGSTOCK PARKWAY 273502312012 0001.2018.ARBK