These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
0040.2018.ARBK
David Altfield
1250 Snowbunny
2735 1220 7013
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Shop
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
x
0
0
0
0040.2018.ARBK 7/17/18
NT
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
BUILDING CODE INFORMATION
2015 IRC
Existing?NFPA 13 NFPA 13 R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# 3/4 Baths ______ # 1/2 Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
NFPA 13 D
RESCheck UA Alternative
Yes No
One Family Two Family
Townhouse
Reviwed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
2nd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
3rd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
YesNo
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
__________________________
__________________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing + New)
A__BB (A <50)F__H__I __
E R__S__
U
M IRC
IBC
2015 IBC
(As Adopted and Amended)
YesNo Required?YesNo Type
August 2017
1250 Snowbunny Lane, Aspen Co 81611
n
0 1 0
1 1
010
3 1 1,113
3 0
1 0
2 1
2 bedrooms, 2 full baths, family room, mechanical
Garage, Entry, Living Room, Kitchen, 2 bedrooms, 2 full baths
NT 7/17/18
03/07/2018
07/17
/
2
0
1
8
nickt
FIRE
SPRINKLERS
REQUIRED
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
Discuss with Fire Marshal
SPECIAL INSPECTION AND TESTING AGREEMENT
To permit applicants of project requiring special inspection and\or testing per Section 1704 of the
International Building Code (IBC).
Project Address: __________________________________ Permit Number:______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the
owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule, including the required acknowledgments. A pre-construction conference with the parties
involved may be required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the
projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are
subject to personal interviews for pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official, when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code
Section 1704. The following conditions are also applicable:
A. Duties and Responsibilities of the Special Inspector
1. Signify presence at job site. Special inspectors should notify contractor personnel of
their presence and responsibilities at the job site. If required by the building official, they shall sign in on the appropriate form posted with the building permit.
Observe assigned work. The special inspector shall observe assigned work for
conformance with the building department approved (stamped) design drawings, specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection.
For continuous special-inspection, the special inspector shall be on site at all times
observing the work requiring special inspection. Periodic inspections, if any, must have prior approval based on a separate written plan reviewed and approved by the building
department and the engineer or architect of record.
3. Report nonconforming items. The special inspector shall bring nonconforming items to
the immediate attention of the contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice.
Provide timely reports. The special inspector shall complete written inspection reports
for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports
directly to the building official, engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be
submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations,
b. Listing of nonconforming items, c. Report on how nonconforming items were resolved or unresolved as
applicable, d. Itemized changes authorized by the architect, engineer, and building official if
not included in nonconforming items.
2.
4.
1
0040.2018.ARBK
5. Provide Final Inspection Report. The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies
noted in the inspections prior to the final building inspection.
B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the
owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In
case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official.
C. Engineer or Architect of Record Responsibilities
1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the
IBC or the building official approves periodic inspection and the frequency of such inspections.
Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the
special inspector.
Review shop drawings and submit design changes. The engineer or architect of record shall acknowledge and review for conformance with the construction drawings those
shop drawings that may detail structural information, shall submit to the building official and to the special-inspection agency written documentation of any verbally authorized
deviations from the approved construction documents, and shall submit revised documents for building official approval as required.
2.
3.
D. Contractor Responsibilities
1. Notify the special inspector. The contractor is responsible for notifying the special
inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall
be provided so the special inspector has time to become familiar with the project.
Provide access to approved plans. The contractor is responsible for providing the
special inspector access to approved plans.
Retain special inspection records. Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector.
2.
3.
E. Inspection of Fabricators
1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a
fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated items.
Fabrication and implementation procedures. The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a
basis for inspection control of the workmanship and the fabricator’s ability to conform to approved construction documents and reference standards. The special inspector shall
review the procedures for completeness and adequacy relative to code requirements for fabricator’s scope of work.
2.
F. Approved Fabricator Responsibilities
1. Fabrication exempt inspections. Special inspections are not required where work is
done on the premise of a fabricator registered and approved to perform such work without special inspection.
2
0040.2018.ARBK
Nick Thompson 7/18/18
07/18/2018
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
MASTER PERMIT: ______________________DATE:___________
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
__________________________________________________________________________________
____________________________________________________________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
PERMIT NUMBER: __________________________
CommericalMulti-FamilySingle Family
Use of Building Class of WorkNewAdditionAlterationRepair
________YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced.
__________________
_________________ __________________
____________________ ________________
_________________
__________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
SQ FT OF LAND-SCAPE WORK
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
Mixed-Use IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOTDESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Energy Code REMP School Ded.
Zoning (50%)Plan Check (Hourly)TDM Impact
Engineering Review Zoning (Hourly)Ped. Amenity
CMP (50%)Engineering (Hourly)Housing Cash in Lieu
Parks Review Zoning (50%)Stormwater
Utility Review CMP (50%)City Use Tax
Other Electrical County Use Tax
Plumbing GIS
Mechanical Sanitation
SUBMITTAL FEES ISSUANCE FEES
__________________PLANS LOCATION
_________Lot Area_________Zone District_________Deed Restricted_________Census Code_________# of Dwellings
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Shower____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts
____Forced Air/Gravity Systems____Wall, Suspended, or Unit Heaters____Gas Log ____Gas Appliancew____Appliance Vents____Heat, Refrig, Cooling, or
Absorption Unit____Boilers (includes vent) ____Air Handling Unit ____Cooling Systems____Ventilation Fans____Range Hood____# of Gas System Outlets____Snowmelt System Sq Ft_________
Equipment Checklist
Zoning
HPC
Building
Fire
Engineering
CMP
Utilities
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
ReviewRequired Date ApprovedReviewingDepartmentReviewerInitials
Call Assessor (970-920-5160) to verify
NEW SQ FT
Details Term DefinitionsProject Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Sq Ft of Landscape Work: Square footage of disturbed exterior area.New Sq Ft: Total added square footage for additions to net livable or net leasble space.Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.DO YOU LIKE DOGS?
August 2017
0040.2018.ARBK 1-16-18
1250 Snowbunny Lane, Aspen Co 81611 A 273512207013
9 Two Hares Condominiums
Replace existing windows with upgraded unit, remove upper deck and move sq footage to main level deck, put hot tube on grade, replace and upgrade exterior siding
remodel kitchen, remodel walkout level bathroom
Doug Rager 970-948-1022 doug@dougragerarchitect.com
David Altfeld 410-917-4888 daltfeld@southernlandcompany.com
$1,169,446.37
1
0
1,000
3,102
0.344 Acres
1
0
100
x1xx
x jb 7/11/18
15643.25 24066.69 x NT 7/18/18
3610 NT 7/18/18
325
x
x JD 4/17/18
x PS 6/8/18
x sw 6/18/18
565.83 325
250 535 11229.18 x pm 3/12/18
2923.62
x
534-223-934
03/07/2018
Dr 6/7/18
1250 Snowbunny Lane, Aspen Co 81611
Doug Rager 970-927-1780 doug@dougragerarchitect.com
Doug Hayes 970-618-6525 dhayesconstruction@gmail.com
David Altfeld 410-917-4888
1250 Snowbunny Lane Aspen co 81611
daltfeld@southernlandcompany.com
Doug Rager 970-927-1780 970-948-1022
1780 Snowmass Creek Rd Snowmass Co 81654
doug@dougragerarchitect.com
Doug Rager 970-927-1780 970-927-1780
1780 Snowmass Creek Rd Snowmass Co 81654
doug@dougragerarchitect.com
Doug Rager 970-927-1780 970-927-1780
1780 Snowmass Creek Rd Snowmass Co 81654
doug@dougragerarchitect.com
Ernest Kollar Engineer 970-963-3223
320 main Street, Suite #203 Carbondale Co 81623
erniekollar@sopris.net
Doug Hayes Construction 970-618-6525
dhayesconstruction@gmail.com
03/07/2018
JH 7/19/18