Loading...
HomeMy WebLinkAboutFile Documents.1250 Snowbunny Ln.0006.2019 (12).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 01/15/2019 nickt SPECIAL INSPECTION REQUIRED: -Structural steel welding: Shop Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. SEE NOTES #1 PLANS SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 1 0006.2019.ARBK Altfield 1250 Snowbunny 2735-1220-7013 02/08/2019 ALL OUTDOOR LIGHTING MUST COMPLY WITH THE CITY OF ASPEN LIGHTING CODE SECTION 26.575.150 12/1/2018 0006.2019.ARBK x x x jb 12/1/18 25 NT 1/15/19 Dr 2/1/19 JRB 2/8/19 0 0 0 0 0 DAM 2/11/19