Loading...
HomeMy WebLinkAboutFile Documents.63 Smuggler Grove Rd.0049.2018 (40).ARBKSPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting -Epoxy anchors -Intumescent paint -Spray applied fire resistive materials -Permanent micropiles Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. Refer S531 The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK FIRE SPRINKLERS REQUIRED REFERENCES FROM 2015 IRC CV/A = crawl space ventilation required, sec. R408.1 Access required, R408.4 EE = emergency escape required sec R310.1 EU = enclosed usable space under stairs shall be ½” Gyp, sec R302.7 G/D = garage/dwelling separation, sec R302.5 and R302.6 STC = Sound transmission class not less than 45 at dwelling separations, app K RV = roof and rafter ventilation required, R806.1 A = attic access 22” x 30”, 30” headroom above, R807.1 SA = smoke alarms installed to NFPA 72 requirements, sec R314 CO = carbon monoxide detector per City Ordinance 41 series 2008 SG = safety glazing required, sec R308.4 GR = guardrails, 36” min ht, 4” max opening; req at 30” drop any point w/in 36” horizontally, sec R312 WFP = window fall protection- operable window <24” AFF & >72” above grade: use opening control device listed to ASTM F2090, sec R312.2 HR = handrails 34”-38” ht, sec R311.7.8 SI = stairway illumination, sec R303.7 PD = protect against decay, sec R317 REFERENCES FROM 2015 IMC V = bathroom and balanced whole house mechanical ventilation req. Ordinance 40, 2016 DE = clothes dryer exhaust, sec 504. Makeup air req’d if over 200 CFM AS = access and service space for maintenance req’d, sec 306 MA = make up air required if hood exhausts greater than 400 CFM, sec 505.2 ET = exhausts terminate 3’ from prop line and openings, 10’ from intakes, 501.3.1 IT= intake openings 10’ from lot line & contaminant sources (vents, streets), 401.4 D = fasten and seal all ductwork per 603.9 REFERENCES FROM 2015 IFGC DV = direct vent req’d, sec 303.3 CA = combustion air not taken from bedrooms, bathrooms or storage sec 303.3 OD = outdoor appliances must be listed for outdoor use, sec 303.6 REFERENCES FROM 2015 IECC F = new or replacement glazing shall not exceed 0.28 U-Value, NFRC label required, Ordinance 40, 2016 L = 75% of lamps in permanently installed lights must be high efficacy, sec R404.1 SE = Continuous air barrier required; all exterior joints, cracks, and holes to be caulked, gasketed, sealed, table R402.4.1.1 REFERENCES FROM 2014 NEC EP = electric panel 'happy space' 30"x36"x78", not in storage, sec 110.26 SHEAR WALL INSPECTION REQUIRED 63 SMUGGLER GROVE 3/1/18 63 SMUGGLER GROVE 3/1/18 08/13/2018 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION MASTER PERMIT: ______________________DATE:___________ CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ __________________________________________________________________________________ ____________________________________________________________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ PERMIT NUMBER: __________________________ CommericalDƵůƟͲ&ĂŵŝůLJ^ŝŶŐůĞ&ĂŵŝůLJ Use of Building Class of Work NewĚĚŝƟŽŶůƚĞƌĂƟŽŶRepair ________ YesNo Will there be ĂŶLJƌŽŽĨͬǁĂůůƉĞŶĞƚƌĂƟŽŶƐ͍ NOTICE: This permit becomes null and ǀŽŝĚŝĨǁŽƌŬŽƌĐŽŶƐƚƌƵĐƟŽŶĂƵƚŚŽƌŝnjĞĚŝƐŶŽƚĐŽŵŵĞŶĐĞĚǁŝƚŚŝŶϭϴϬĚĂLJƐ͕ŽƌŝĨĐŽŶƐƚƌƵĐƟŽŶŽƌǁŽƌŬŝƐƐƵƐƉĞŶĚĞĚŽƌĂďĂŶĚŽŶĞĚĨŽƌĂƉĞƌŝŽĚŽĨϭϴϬĚĂLJƐĂƚĂŶLJƟŵĞĂŌĞƌǁŽƌŬŝƐĐŽŵŵĞŶĐĞĚ͘ __________________ _________________ __________________ ____________________ ________________ _________________ __________ PROJECTVALUATION SQ FT OF WORK AREA UNIT SQ FT SQ FT OF LAND-SCAPE WORK SQ FT OF ROOMS WITH UTILITY WORK LOT SIZE(SQ FT) PROJECT DETAILS DŝdžĞĚͲhƐĞ IFFR Tenant FinishĞŵŽůŝƟŽŶ Change Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL FOR CITY USE ONLY Plan Check Permit Fee Parks Impact ŶĞƌŐLJŽĚĞ REMP School Ded. Zoning (50%) Plan Check ;,ŽƵƌůLJͿ TDM Impact Engineering Review ŽŶŝŶŐ;,ŽƵƌůLJͿ WĞĚ͘ŵĞŶŝƚLJ CMP (50%) Engineering ;,ŽƵƌůLJͿ Housing Cash in Lieu Parks Review Zoning (50%) Stormwater hƟůŝƚLJZĞǀŝĞǁ CMP (50%)ŝƚLJhƐĞdĂdž Other Electrical ŽƵŶƚLJhƐĞdĂdž Plumbing GIS Mechanical ^ĂŶŝƚĂƟŽŶ SUBMITTAL FEES ISSUANCE FEES __________________PLANS LOCATION _________Lot Area _________Zone District _________Deed Restricted _________Census Code _________# of Dwellings APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtubͺͺͺͺ>ĂǀĂƚŽƌLJ;tĂƐŚĂƐŝŶͿ ____Shower ____Kitchen Sink (+Disposal) ____Dishwasherͺͺͺͺ>ĂƵŶĚƌLJĂƌ͕hƟůŝƚLJ^ŝŶŬ ____Clothes Washer ____Floor Sink ____Floor Drain ____Shower ____Water Heater (Pan Req) ____# Gas Outlets ____Water Treatment ____Other_________ Fixture Counts ____&ŽƌĐĞĚŝƌͬ'ƌĂǀŝƚLJ^LJƐƚĞŵƐ ____Wall, Suspended, or Unit Heaters ____Gas Log ____Gas Appliancew ____Appliance Vents ____Heat, Refrig, Cooling, or ďƐŽƌƉƟŽŶhŶŝƚ ____Boilers (includes vent) ____Air Handling Unit ͺͺͺͺŽŽůŝŶŐ^LJƐƚĞŵƐͺͺͺͺsĞŶƟůĂƟŽŶ&ĂŶƐ ____Range HoodͺͺͺͺηŽĨ'ĂƐ^LJƐƚĞŵKƵƚůĞƚƐ ____^ŶŽǁŵĞůƚ^LJƐƚĞŵ^Ƌ&ƚͺͺͺͺͺͺͺͺͺ Equipment Checklist Zoning HPC Building Fire Engineering CMP hƟůŝƟĞƐ Water Stormwater ^ĂŶŝƚĂƟŽŶ Env. Health Parks Landscape ĸĐŝĞŶĐLJ Approved To Issue Issuance ReviewRequired Date ApprovedReviewingDepartmentReviewer/ŶŝƟĂůƐ ĂůůƐƐĞƐƐŽƌ;ϵϳϬͲϵϮϬͲϱϭϲϬͿƚŽǀĞƌŝĨLJ NEW SQ FT ĞƚĂŝůƐdĞƌŵĞĮŶŝƟŽŶƐWƌŽũĞĐƚsĂůƵĂƟŽŶ͗ŽƐƚŽĨƉƌŽũĞĐƚĂƐĚĞĮŶĞĚŝŶsĂůƵĂƟŽŶīĂĚĂǀŝƚ͘^Ƌ&ƚŽĨtŽƌŬƌĞĂ͗dŽƚĂůƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨĂƌĞĂƵŶĚĞƌŐŽŝŶŐĐŚĂŶŐĞŽƌƌĞĐŽŶĮŐƵƌĂƟŽŶ͘hŶŝƚ^Ƌ&ƚ͗'ƌŽƐƐ^ƋƵĂƌĞ&ŽŽƚĂŐĞ͕ŶŽƚ&Z͕ŽĨƉĞƌŵŝƩĞĚƵŶŝƚ͘>Žƚ^ŝnjĞ͗dŽƚĂůƐƵƌǀĞLJĞĚƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨƉƌŽƉĞƌƚLJ͘ Sq Ft of Landscape Work: Square footage of disturbed exterior area.EĞǁ^Ƌ&ƚ͗dŽƚĂůĂĚĚĞĚƐƋƵĂƌĞĨŽŽƚĂŐĞĨŽƌĂĚĚŝƟŽŶƐƚŽŶĞƚůŝǀĂďůĞŽƌŶĞƚůĞĂƐďůĞƐƉĂĐĞ͘^Ƌ&ƚŽĨZŽŽŵƐǁŝƚŚhƟůŝƚLJtŽƌŬ͗dŽƚĂůƐƋƵĂƌĞĨŽŽƚĂŐĞ͕ŶŽƚ&Z͕ŽĨĂůůƌŽŽŵƐǁŝƚŚƉůƵŵďŝŶŐǁŽƌŬ͘KzKh>/<K'^͍ ƵŐƵƐƚϮϬϭϳ 63 Smuggler Grove, Aspen, CO.273718106004 4 East Meadow Subdivision 34% Interior remodel including removal and replacement of existing stair, new elevator and bedroom & bath remodel. Work also includes replacement of existing landscape and hardscape, and a new dormer at new stair. Kim Weil kweil@billposs.com DP Aspen LLC DBlumenfeld@BDG.NET 8511311 1,680 2,028 7,668 22 0 4 11 1 970 925-4755 (0) 516 624-1919 (0) $1,175,000.00 3/1/18 0049.2018.arbk 3/1/18 x x x x x x x x 15697.50 3158.41 325 325 1084.98 1084.98250 24150 2937.50 11287.50 JF 7/20/18 TF TF 7/25/18 7/25/18 Dr 8/2/18 BN 8.10.18 7,668 Sq. Ft. R-15A 0 0 0 0 0 tk 3/6/18 sw 8/10/18 pm 3/12/18 SPECIAL INSPECTION AND TESTING AGREEMENT To permit applicants of project requiring special inspection and\or testing per Section 1704 of the International Building Code (IBC). Project Address: __________________________________ Permit Number:______________________ BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures. APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official, when performing the function of special inspector. Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable: A. Duties and Responsibilities of the Special Inspector 1. Signify presence at job site.Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they shall sign in on the appropriate form posted with the building permit. 2. Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings, specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection. For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record. 3. Report nonconforming items.The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice. 4. Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items, c. Report on how nonconforming items were resolved or unresolved as applicable, d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items. 1 63 Smuggler Grove, Aspen 3/1/18 0049.2018.ARBK 5. Provide Final Inspection Report. The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection. B. Owner Responsibilities.The project owner, the engineer or architect or record, or an agent of the owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official. C. Engineer or Architect of Record Responsibilities 1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the IBC or the building official approves periodic inspection and the frequency of such inspections. 2. Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the special inspector. 3. Review shop drawings and submit design changes.The engineer or architect of record shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents, and shall submit revised documents for building official approval as required. D. Contractor Responsibilities 1. Notify the special inspector. The contractor is responsible for notifying the special inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall be provided so the special inspector has time to become familiar with the project. 2. Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans. 3. Retain special inspection records.Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector. E. Inspection of Fabricators 1. Fabrication of structural assemblies and members.Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated items. 2. Fabrication and implementation procedures. The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for fabricator’s scope of work. F. Approved Fabricator Responsibilities 1. Fabrication exempt inspections. Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work without special inspection. 2 3/1/18 3/1/18 DAM 8/13/18 The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 0049.2018.ARBK DP Aspen LLC 63 Smuggler Grove 273718106604 SHEAR WALL INSPECTION REQUIRED SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 REFERENCES FROM 2015 IRC CV/A = crawl space ventilation required, sec. R408.1 Access required, R408.4 EE = emergency escape required sec R310.1 EU = enclosed usable space under stairs shall be ½” Gyp, sec R302.7 G/D = garage/dwelling separation, sec R302.5 and R302.6 STC = Sound transmission class not less than 45 at dwelling separations, app K RV = roof and rafter ventilation required, R806.1 A = attic access 22” x 30”, 30” headroom above, R807.1 SA = smoke alarms installed to NFPA 72 requirements, sec R314 CO = carbon monoxide detector per City Ordinance 41 series 2008 SG = safety glazing required, sec R308.4 GR = guardrails, 36” min ht, 4” max opening; req at 30” drop any point w/in 36” horizontally, sec R312 WFP = window fall protection- operable window <24” AFF & >72” above grade: use opening control device listed to ASTM F2090, sec R312.2 HR = handrails 34”-38” ht, sec R311.7.8 SI = stairway illumination, sec R303.7 PD = protect against decay, sec R317 REFERENCES FROM 2015 IMC V = bathroom and balanced whole house mechanical ventilation req. Ordinance 40, 2016 DE = clothes dryer exhaust, sec 504. Makeup air req’d if over 200 CFM AS = access and service space for maintenance req’d, sec 306 MA = make up air required if hood exhausts greater than 400 CFM, sec 505.2 ET = exhausts terminate 3’ from prop line and openings, 10’ from intakes, 501.3.1 IT= intake openings 10’ from lot line & contaminant sources (vents, streets), 401.4 D = fasten and seal all ductwork per 603.9 REFERENCES FROM 2015 IFGC DV = direct vent req’d, sec 303.3 CA = combustion air not taken from bedrooms, bathrooms or storage sec 303.3 OD = outdoor appliances must be listed for outdoor use, sec 303.6 REFERENCES FROM 2015 IECC F = new or replacement glazing shall not exceed 0.28 U-Value, NFRC label required, Ordinance 40, 2016 L = 75% of lamps in permanently installed lights must be high efficacy, sec R404.1 SE = Continuous air barrier required; all exterior joints, cracks, and holes to be caulked, gasketed, sealed, table R402.4.1.1 REFERENCES FROM 2014 NEC EP = electric panel 'happy space' 30"x36"x78", not in storage, sec 110.26 FIRE SPRINKLERS REQUIRED SPECIAL INSPECTION REQUIRED Special inspection is required per 2009 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. FIRE SPRINKLERS REQUIRED 63 SMUGGLER GROVE 3/1/18 63 SMUGGLER GROVE 3/1/18 Refer S 531