HomeMy WebLinkAboutFile Documents.63 Smuggler Grove Rd.0086.2019 (15).ARBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
S K PEIGHTAL ENGINEERS Ltd
STRUCTURAL CONSULTANTS
17055 2019.04.16 Letter
PO Box 410 • Basalt, CO • 81621 • 970.927.9510 • skpe.structural@gmail.com
MEMORANDUM
To: Aspen Building Department
c/o Poss Architecture + Planning
Tony Major
605 East Main Street
Aspen, Colorado 81611
From: Adrienne Prosser, PE
Date: 16 April 2019
Re: Remodel
63 Smuggler Grove
Aspen, Colorado 81611
My office has been working closely with Poss Architecture + Planning to provide professional
engineering services for the above referenced project.
It is understood that a skylight has been added to the architectural design. This glazing element
will be located directly above the new elevator shaft. The skylight will sit above the primary roof
structure; therefore, the existing, curved steel beams will not require modification to
accommodate this new roof penetration. The secondary, ladder framed rafters can be
removed with minimal impact to the roof structure, which will be reviewed, and structural
clarification provided as required.
Throughout the remodel process, including the installation of the skylight, SK Peightal Engineers is
in agreement to provide the following services:
1. Observation of existing structure during demolition phase.
2. Follow-up with Field Reports to help define critical elements if applicable.
3. Design and Construction Documents for any additional structural work.
4. Observations during new structural construction with Field Reports.
Please feel to contact my office directly with any additional questions or concerns regarding this
project.
16 April '19
04/18/2019
63 Smuggler Grove
Aspen, Aspen CO
Permit Number: 0049.2018.ARBK
Change Order Description:
Landscape:
Move entry walk west 12”; no change to pervious/impervious areas.
Architectural:
1. Upper level deck: Reductions in deck areas have been made to retain a portion of the upper
level deck including removal of the master bedroom deck and reductions in the overall floor
area as described below.
a. Floor areas and calculations have been revised as shown on revised sheet G-102.
b. Revisions to the upper level stair and landing result in reduced floor area as shown on
sheet A-102 and A-103.
c. Interior remodel and Fire areas have been revised per sheets G-103 and G-104.
2. Upper level Stair: The upper level stair has been revised to a spiral stair in lieu of the scissor stair
previously shown. The existing spiral stair is to be augmented and re-used. The upper level floor
is to be removed and replaced as shown on sheets AD-103, A-103, A-107, A-302 and new spiral
stair details sheet A-401.
3. Added dormer: The added dormer and related demolition has been omitted.
a. The existing roof will remain as shown on sheets AD-202, A-201 - A-203, A-301 - A-303.
b. Add sheet A-304
c. Omit dormer details; sheet A-401
d. Roof and wall area calculations have been revised as shown on sheets G-105 and G-106.
4. Revised lower level stair: The lower level stair detailing has been revised and simplified as shown
on sheet A-402.
5. Elevator and hoistway:
a. The elevator hoistway enclosure has been reduced in size as shown on sheets A-100 – A-
102. The overall opening in the floor has not changed.
b. A skylight has been added to the existing roof above the elevator as shown on sheets A-
103, A-104, A107, AD-202, A-202, A-203 and A-302.
c. Roof demolition calculations have been revised as shown on sheet G-105.
6. Plan revisions:
a. Lower Level:
i. Bedroom #5 (001): Entrance alcove has been removed
ii. Bath #5 (002): Redesigned
iii. Bar area (003): Revised layout
iv. Storage (105): Added stack washer/dryer
b. Ground Level:
i. Entry (100): revised entrance doors.
ii. Bath #2 (104): revised closet & shower enclosure.
iii. Remove & replace existing glass block windows w. new to match existing
04/18/2019
iv. Bedroom #4 (109): Replaced existing window
c. Main Level:
i. Living Room (201): Remove and replace fireplace stone veneer
ii. Hall (203): Revise and reuse existing spiral stair to crow’s nest
iii. Kitchen (209): Replace several cabinets & countertop
iv. Powder Room (208): Redesigned
v. Master Bedroom (204): Covert deck into canopy, provide barrier at doors
vi. Master Bath (205): Replace door, added new shower controls
d. Upper Level:
i. Replaced upper floor and revised stair as described above
ii. Reduced size of exterior deck to comply with floor area requirements as
described above
e. Roof:
i. Reduced size of exterior deck to comply with floor area requirements as
described above
ii. Added skylight above elevator as described above
Structural:
1. Revise framing and support for revised stair as described above
2. Revise elevator hoistway as described above
3. Revise decks as described above
Mechanical:
1. Add new air conditioning system
End of Description
04/18/2019
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalDƵůƟͲ&ĂŵŝůLJ^ŝŶŐůĞ&ĂŵŝůLJ
Use of Building Class of Work
NewĚĚŝƟŽŶůƚĞƌĂƟŽŶRepair
________
YesNo
Will there be ĂŶLJƌŽŽĨͬǁĂůůƉĞŶĞƚƌĂƟŽŶƐ͍
NOTICE: This permit becomes null and void if work ŽƌĐŽŶƐƚƌƵĐƟŽŶĂƵƚŚŽƌŝnjĞĚŝƐŶŽƚĐŽŵŵĞŶĐĞĚǁŝƚŚŝŶϭϴϬĚĂLJƐ͕ŽƌŝĨĐŽŶƐƚƌƵĐƟŽŶŽƌǁŽƌŬŝƐƐƵƐƉĞŶĚĞĚŽƌĂďĂŶĚŽŶĞĚĨŽƌĂƉĞƌŝŽĚŽĨϭϴϬĚĂLJƐĂƚĂŶLJƟŵĞĂŌĞƌ
work is commenced.
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
PROJECTVALUATION
SQ FT OF BUILDING WORK AREA
UNIT SQ FT
SQ FT OF SOILDISTURBANCE
BUILDING FOOTPRINT
LOT SIZE(SQ FT)
PROJECT DETAILS (READ DEFINITIONS BELOW)
DŝdžĞĚͲhƐĞ
IFFR
Tenant FinishĞŵŽůŝƟŽŶ
Change Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
Building
Review
Building
Permit Fee Parks Impact
Engineering
Review
Zoning
Review (50%)
School Lands
ĞĚŝĐĂƟŽŶ
Zoning
Review (50%)
CMP (50%)TDM Impact
ŶĞƌŐLJŽĚĞ
Review
REMP
WĂLJŵĞŶƚ
Pedestrian
ŵĞŶŝƚLJ
CMP (50%) GIS Housing Cash in Lieu
Parks Review ŝƚLJhƐĞ
Tax Water Tap
hƟůŝƚLJZĞǀŝĞǁ ŽƵŶƚLJhƐĞ
Tax ^ĂŶŝƚĂƟŽŶ
SUBMITTAL FEES ISSUANCE FEES
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets
____Bathtubͺͺͺͺ>ĂǀĂƚŽƌLJ;tĂƐŚĂƐŝŶͿ
____Shower
____Kitchen Sink (+Disposal)
____Dishwasherͺͺͺͺ>ĂƵŶĚƌLJĂƌ͕hƟůŝƚLJ^ŝŶŬ
____Clothes Washer
____Floor Sink
____Floor Drain
____Water Heater (Pan Req)
____# Gas Outlets
____Water Treatment
____Other_________
Fixture Counts Important Review Triggers
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
^ĂŶŝƚĂƟŽŶ
Env. Health
Parks
Landscape
ĸĐŝĞŶĐLJ
Approved
To Issue
Issuance
Date ApprovedReviewingDepartment
Reviewer^ŝŐŶͲKī
NEW SQ FT
WƌŽũĞĐƚsĂůƵĂƟŽŶ͗ŽƐƚŽĨƉƌŽũĞĐƚĂƐĚĞĮŶĞĚŝŶsĂůƵĂƟŽŶīĂĚĂǀŝƚ͘^Ƌ&ƚŽĨƵŝůĚŝŶŐtŽƌŬƌĞĂ͗dŽƚĂůƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨŝŶƚĞƌŝŽƌĂƌĞĂƵŶĚĞƌŐŽŝŶŐĐŚĂŶŐĞŽƌƌĞĐŽŶĮŐƵƌĂƟŽŶ͘hŶŝƚ^Ƌ&ƚ͗'ƌŽƐƐƐƋƵĂƌĞĨŽŽƚĂŐĞ͕ŶŽƚ&Z͕ŽĨƉĞƌŵŝƩĞĚƵŶŝƚ͘>Žƚ^ŝnjĞ͗dŽƚĂůƐƵƌǀĞLJĞĚƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨƉƌŽƉĞƌƚLJ͘^Ƌ&ƚŽĨ^ŽŝůŝƐƚƵƌďĂŶĐĞ͗ Exterior area of the lot where the ground is disturbedEĞǁ^Ƌ&ƚ͗dŽƚĂůĂĚĚĞĚƐƋƵĂƌĞĨŽŽƚĂŐĞĨŽƌĂĚĚŝƟŽŶƐƚŽŶĞƚůŝǀĂďůĞŽƌŶĞƚůĞĂƐĂďůĞƐƉĂĐĞ͘ƵŝůĚŝŶŐ&ŽŽƚƉƌŝŶƚ͗'ƌĂĚĞŇŽŽƌƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨƚŚĞƉĞƌŵŝƩĞĚƐƚƌƵĐƚƵƌĞ͘,ĂƌĚƐĐĂƉĞƌĞĂ͗Square footage of impervious lot surface.ŽŶĞŝƐƚƌŝĐƚ͗hŶĚĞƌůLJŝŶŐnjŽŶĞĚŝƐƚƌŝĐƚŽĨƉĞƌŵŝƩĞĚƉĂƌĐĞů͘
January 2019
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
HARDSCAPEAREA
NeedsReview
DE
F
I
N
I
T
I
O
N
S
ZONEDISTRICT
Major Engineering Review
• Projects involving less than 50% ŚĂƌĚƐĐĂƉĞĂƌĞĂĂŶĚǁŽƌŬĂīĞĐƟŶŐϳϱйŽƌŐƌĞĂƚĞƌŽĨƵŶŝƚƐƋŌ
• Projects involving greater than
50% hardscape area and work ĂīĞĐƟŶŐϱϬйŽƌŐƌĞĂƚĞƌŽĨƵŶŝƚƐƋŌ
• WƌŽũĞĐƚƐŝŶǀŽůǀŝŶŐϭ͕ϬϬϬнƐƋŌŽĨ
soil disturbance area
tĂƚĞƌĸĐŝĞŶƚ>ĂŶĚƐĐĂƉŝŶŐ
• Projects that trigger a major
engineering review
• Projects involving interior ĂůƚĞƌĂƟŽŶƐĂīĞĐƟŶŐϱϬйŽƌŵŽƌĞŽĨĞdžŝƐŝƟŶŐŐƌŽƐƐƐƋƵĂƌĞĨŽŽƚĂŐĞ
THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY
04.17.2019 0049.2018.ARBK
63 Smuggler Grove, Aspen, CO 273718106004
4 East Meadow Subdivision
DP Aspen LLC 516 624-1919 DBlumenfeld@BDG.net
Kim Weil 970 925-4755 kweil@billposs.com
change walls, delete dormer, add skylight, revise stair
$2,100,000.00
8
5
11
3
1
1
2
2057.07 sf
6,107.60 sf gross
7,668 sf 2
800 sf
0
2021.81 sf
4
1
1
280 sf
R-15A
04/18/2019
0086.2019.ARBK
x jb 4/18/19
x
x
x
x
25
BN 4/30/19
0
0
0
0
0
JF 5/1/19
TF 5/10/19
0086.2019.ARBK
DP ASPEN LLC
63 SMUGGLER GROVE
273718106004
1
FIRE
SPRINKLERS
REQUIRED
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15