Loading...
HomeMy WebLinkAboutFile Documents.63 Smuggler Grove Rd.0031-2020-BCHO (2)These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 06/03/2020 0021-2020-BCHO DP ASPEN LLC 63 SMUGGLER GROVE DRIVE 273718106004 External Energy Use Approved RREMP CREMP PERMIT #:0031-2020-BCHO DATE:_6/26/20_ SNOWMELT:__356 sf new_____________ POOL: _0___________________________ SPA: _0___________________________ OFFSET:____none_______________________ REMP SHEET: __L101__________________ REVIEWED BY: __BM___________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: ____93%_________ 06/26/2020 bonniem 2 SEE NOTES #1 PLANS FIRE SPRINKLERS REQUIRED SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 SPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting -Epoxy anchors -Intumescent paint -Spray applied fire resistive materials -Permanent micropiles Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection.