Loading...
HomeMy WebLinkAboutFile Documents.1411 Crystal Lake Rd.0062.2018 (37).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 0062.2018.ARBK Valley Group LLC 1411 Crystal Lake Rd 2737 1810 0018 External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ x 0062.2018.ARBK 5/16/18 866 0 A-101, M001 95% NT 11/27/2018 3/29/2018 FIRE SPRINKLERS REQUIRED SPECIAL INSPECTION REQUIRED: Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 715 W. Main Street, Suite 104 Aspen, Colorado 81611 voice: 970.544.4851 email:LAM@MenendezArchitects.com July 30, 2018 Mr. Stephen Kanipe Community Development Department City of Aspen 201 N. Mill Street Aspen, CO 81611 Re: 1411 Crystal Lake Road, Valley Group/Smallwood House (Permit No. 0062-2018- ARBK) Dear Mr. Kanipe; This letter serves to request approval for an alternative method of construction, as permitted by IRC Section 104.11, for secondary drains or scuppers required by 2015 IPC Section 1108. This request applies to the section of roof that lies between Grid I to Grid Q and Grid 3 to just south of Grid 11 (please refer to the Roof Plan on Sheet A-105). This area of roof will have numerous drains that connect to exposed exterior downspouts directly below each roof drain. There will be no internal pipes connecting roof drains. Each roof drain has been designed to serve as an overflow drain for other drains on the same section of roof. There is never more than a 3.5” vertical rise in roof slope between any two drains with most only having a rise of 2.5” before the water spills over to the next drain. The structural engineer has designed the roof structure to support the weight of any water that could accumulate, before draining to an adjoining drain. The proposed solution meets the intent of the code by providing a secondary means of drainage but in a way that is slightly different than the letter of the code. Please contact me with any questions. Sincerely, Luis Menendez A.I.A. 11/27/2018 This modification is acceptable as it meets the intent of 2015 IBC section 104.11 and provides equivalent protection. 02/15/2019 3/29/2018 02/20/2019 nickt Code Editions Fire Sprinkler System Type Of Construction Fire Alarms Installed Required Special Inspections Energy Code Compliance Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________ Building Type/Occupancy Group COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DESCRIPTION FORM - IRC & IBC CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 BUILDING CODE INFORMATION 2015 IRC Existing?NFPA 13 NFPA 13 R High-Strength Bolting Epoxy Anchors Structual Steel Welding Permanent Micropiles Other _____________ Prescriptive Table UNIT DESCRIPTION AS PROPOSED # Stories Above Grade ______ # Stories Below Grade _______ Parking Spaces ______ Parking Spaces ______ Parking Spaces ______ # Bedrooms ______ # Full Baths ______ Deck Area ______ # 3/4 Baths ______ # 1/2 Baths ______ # Kitchens ______ # Wood Fireplaces ______ # Gas Appliances ______ # Gas Logs______ NFPA 13 D RESCheck UA Alternative Yes No One Family Two Family Townhouse Reviewed By: _____________________Date:__________ BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage) Basement ___________________________________________________________________________________ ___________________________________________________________________________________________ Main Level __________________________________________________________________________________ ____________________________________________________________________________________________ 2nd Floor ___________________________________________________________________________________ __________________________________________________________________________________________ 3rd Floor ___________________________________________________________________________________ ___________________________________________________________________________________________ Additional ___________________________________________________________________________________ ___________________________________________________________________________________________ Attached Garage Detached Garage Carport Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____ # Other Rooms (List)____________ ADU BUILDING DESCRIPTION YesNo PERMIT NUMBER: _______________________________ (As Adopted and Amended) Other (Please Explain) _________________ _________________ VA VB IV IIIA IIIB IIA IIB IA IB Sprayed Fire-Resistants COMCheck UA Alternative (Existing + New) A__BB (A <50)F__H__I __ E R__S__ U M IRC IBC 2015 IBC (As Adopted and Amended) YesNo Required?YesNo Type January 2018 2015 IEBC (As Adopted and Amended) Other _____________ Gross Area of Building: __________ Gross Area of Unit: __________ Occupant Load: ___________ X X X X X X 866 SF 64 SF (package unit) none X 2 1 2 0 0 4 1 4 1 1 0 1 0 X X Bedroom #4, Closet #4, Bath #4, Mechanical Room, Play Room, Owner's Storage, Utility Room, Hallway, Stair, Elevator Living Rm, Dining Rm, Kitchen, Office, Mudroom, Laundry, Powder Rm, Garage, Storage, Master Bedrm, Master Bath & Closet, Hallway 2, Stair, Bedroom #2, Bath & Closet #2, Bedroom #3, Bath & Closet #3, Elev. Storage, Elevator 9,164 SF N.A. 46 X 3/29/2018 X X NT 2/21/19 02/ 2 1 / 2 0 1 9 nic k t PV - 6.2kW panels 5.9kW inverters Reviewed by Engineering 03/12/2019 1:46:06 PM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data. City Development Engineer's Comments 1. Encroachments: Any existing or planned encroachments into the public right-of-way, including temporary construction trailers and dumpsters, must be applied for licensing at City Engineering (920- 5080). Five davs advance notice is required to obtain a temporary encroachment license. 2. Right-of-way Permits: Approval of these plans by the City Building Dept. is for work on private property only. Design approvals for proposed work (including landscaping) in the public right-of-way (ROW) must be obtained from City Engineering Dept. (920-5080) and Parks Dept. (920-5120) . A permit for work in the public right-of-way must be obtained from the City Engineering Dept. five days in advance of when the permit is needed. 3. Mud, dirt and debris may not be tracked onto the adjacent public ROW, and the adjacent ROW must be clean at the end of eachworkday. Construct mud rack if needed. Trucks hauling demolished materialsmust becovered. 4. Utilities in ROW: No utility pedestals, meters, or electric transformers can be installed in the public right-of-way. Provide utility easements on private property as needed. 5. Certificate of Occupancy (CO) Inspection: Engineering CO Inspection includes but is not limited to: (a) witnessing that all property corners havemonuments, (b) drainage improvements were installed as approved, (c) easements are documented, (d) no unapproved ROW encroachments exist, and (e) the ROW has been restored. Call 429-2750 to arrange CO inspection. 6. Snowmelt Driveways : (i) Snowmelt runoff from driveway cannot flow into street . A grate or swale must intercept runoff before street. (ii) Snowmelt installation in the public ROW requires an encroach- ment permit. 7. Drainage Issues: (i) Foundation drains cannot go to a dry well receiving other drainage flows. (ii) City must be notified of drainage plan changes. (iii) Plan approval assumes no ground water. If ground water is encountered, call the Senior Dev. Engineer at 920-5080. Call for an open hole inspection prior to placement of the drywell. 8. No Loose Material Storage allowed in R.O.W. 9. Neighbor Notification: For all excavation, the Contractor must comply with neighbor notification requirements per Section 3307 of the 2003 International Building Code (IBC) COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ CommericalMulti-FamilySingle Family Use of Building Class of WorkNewAdditionAlterationRepair ________ YesNo Will there be any roof/wall penetrations? NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. __________________ _________________ __________________ ____________________ ________________ _________________ __________ ______________ PROJECTVALUATION SQ FT OF WORK AREA UNIT SQ FT DISTURBEDEXTERIOR AREA SQ FT OF ROOMS WITH UTILITY WORK LOT SIZE(SQ FT) PROJECT DETAILS Mixed-Use IFFRTenant FinishDemolitionChange Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL FOR CITY USE ONLY Plan Check Permit Fee Parks Impact Engineering Zoning (50%)School Ded. Zoning (50%)CMP (50%)TDM Impact Energy Code REMP Ped. Amenity CMP (50%)Plan Check (Hourly)Housing Cash in Lieu Parks Review Zoning (Hourly)Stormwater Utility Review Engineering (Hourly)City Use Tax GIS County Use Tax SUBMITTAL FEES ISSUANCE FEES _________Lot Area _________Deed Restricted _________Census Code _________# of Dwellings _________Plans Location APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________ Fixture Counts ____Forced Air/Gravity Systems____Wall, Suspended, or Unit Heaters____Gas Log ____Gas Appliancew____Appliance Vents____Heat, Refrig, Cooling, or Absorption Unit____Boilers (includes vent) ____Air Handling Unit ____Cooling Systems____Ventilation Fans____Range Hood____# of Gas System Outlets____Snowmelt System Sq Ft_________ Equipment Checklist PC Zoning HPC Building Fire Engineering CMP Water Stormwater Sanitation Env. Health Parks Landscape Efficiency Approved To Issue Issuance Date ApprovedReviewingDepartment Re-viewerSign-Off NEW SQ FT Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Disturbed Exterior Area: Square footage of lot affected by permit application.New Sq Ft: Total added square footage for additions to net livable or net leasble space.Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work. DO YOU LIKE DOGS? December 2017 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ __________________________________________________________________________________ __________________________________________________________________________________ ZONE DISTRICT NeedsReview DE F I N I T I O N S 6 1 7 5 1 1 1 1 0 6 0 4 1 0 0 0 1 2 1 4 2 4 0 0 1 4 1 974 03-02-18 1411 Crystal Lake Road, Aspen 2737-181-00-018 N/A N/A Section 8, Township 10 South, Range 84 W of the 6th P.M. Valley Group LLC 615-594-7443 psmallwood@smallwoodnickle.com Luis Menendez 970-948-8347 LAM@MenendezArchitects.com New single-family dwelling, with attached garage, to replace existing single-family dwelling. 40,813 R-15 X X X X 24,200 9,164 (gross area) $6,640,234 1,574 3/29/2018 0062.2018.arbk x jb 3/29/18 x x xx x x x x x x x 56924.89 32608.67 9736.75 1224.39 4902.74 4902.74 9736.75 13136.51 1574 87576.76 500 16600.59 68672.46 434 RM 3/14/19 Dr 3/20/19 JPO 3/22/19 MH 3/12/19 AR 3/6/19 PM 5/7/18 TK 3/15/19 NT 2/21/19 NT 3/12/19 DAM 4/4/19 SW 3/22/19 The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 5. Provide Final Inspection Report. The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection. B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official. C. Engineer or Architect of Record Responsibilities 1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the IBC or the building official approves periodic inspection and the frequency of such inspections. 2. Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the special inspector. 3. Review shop drawings and submit design changes. The engineer or architect of record shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents, and shall submit revised documents for building official approval as required. D. Contractor Responsibilities 1. Notify the special inspector. The contractor is responsible for notifying the special inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall be provided so the special inspector has time to become familiar with the project. 2. Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans. 3. Retain special inspection records. Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector. E. Inspection of Fabricators 1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated items. 2. Fabrication and implementation procedures. The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for fabricator’s scope of work. F. Approved Fabricator Responsibilities 1. Fabrication exempt inspections. Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work without special inspection. 2 3/29/2018 SPECIAL INSPECTION AND TESTING AGREEMENT To permit applicants of project requiring special inspection and\or testing per Section 1704 of the International Building Code (IBC). Project Address: __________________________________ Permit Number:______________________ BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures. APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official, when performing the function of special inspector. Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable: A. Duties and Responsibilities of the Special Inspector 1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they shall sign in on the appropriate form posted with the building permit. 2. Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings, specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection. For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record. 3. Report nonconforming items. The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice. 4. Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items, c. Report on how nonconforming items were resolved or unresolved as applicable, d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items. 1 1411 Crystal Lake Road 3/29/2018 0062.2018.ARBK 3/29/2018 0062.2018.ARBK1411 CRYSTAL LAKE ROAD 3/29/2018 0062.2018.ARBK DAM DENIS MURRAY 2/15/19 02/ 2 1 / 2 0 1 9 nic k t ASPEN LINE GRADE VERIFICATION FORMASPEN LINE GRADE VERIFICATION FORM Webpage: http://www.aspenpitkin.com/pdfs/depts/41/linegradeverificationform.pdf Rev. 04-08 Verification of Building Location by Building Contractor For Building and Permit Information, please refer to our website at: http://www.aspenpitkin.com/depts/41/ Exemption A City verification of building location is not needed when the project creates less the 200 square feet of new floor area. PART A: Complete and Submit as part of the Building Permit Application o Building / Job Address or Location: _____________________________________________ o Your Name (Person Completing Part A): ____________________________________________ o Your Company: ________________________________________________________________ o Plans must show horizontal dimensions that ‘tie’ the building to the property boundary. Are building ties shown? (circle one) ‘Yes’ ‘No’ o An elevation benchmark needs to be established on the site by a licensed surveyor and shown on the plans. What is the elevation of this benchmark? _________________________________ o If the garage is located within 10 feet of the roadway or sidewalk, provide spot elevation on the on the roadway or sidewalk. Is a spot elevation shown? ‘Yes’ ‘No’ ‘N/A’ o Provide the equation comparing site (surveyed) elevation to structure/ architectural plan elevation: (i.e., 100’ first floor elev = 7962.50’) _______________________________ ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- PART B: Complete prior to first Foundation Inspection, by a licensed surveyor or an individual prequalified by the City o Do field measured building ties to property match building ties shown on the plan? (circle one): ‘Yes’ ‘No’ o Surveyor needs to confirm that one spot on the top of the foundation wall is at the same elevation shown on the approved building plans. o What is the field measured elevation of top of foundation wall relative to the site bench mark? ____________ o According to the building plans, what was the design elevation for the same place on the foundation wall? ______________________________ o Was the elevation of the building adjusted in field? (circle one): ‘Yes’ ‘No’ o If yes, why? ________________________________________________ The undersigned qualified individual certifies that the information in Part B is accurate - Signature: Date: _ Printed Name: Contact ph. # : ____________________ Company: ______________________________________________________________ 1411 Crystal Lake Road Luis Menendez Menendez Architects, P.C. Refer to architectural Site Plan Garage is not within 10' of the roadway or sidewalk. 7980.0' (see note on survey on north property line) Architectural 100'-0" = Site Elevation 7984.75' 3/29/2018